My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: <br /> UPSTREAM STORM 1. HIGH FLOW BYPASS AND LIFT STATION ARE COMBINED INTO A SINGLE <br /> CONVEYANCE STRUCTURE. <br /> SYSTEM <br /> 2. SEE SHEET C4.14 FOR HIGH FLOW BYPASS/LIFT STATION DIMENSIONS, <br /> ORIFICE SIZE, AND CONFIGURATION. <br /> ABOVE GRADE 0( SAND 3. STORMWATER CONVEYANCE SYSTEM IS TIDALLY INFLUENCED. CHECK <br /> CESF TREATMENT SYSTEM SEDIMENT TANKS FILTERS VALVES PREVENT SEA WATER FROM ENTERING THE STORMWATER <br /> (MAY BE USED FOR TREATMENT SYSTEM VIA THE HIGH FLOW BYPASS/LIFT STATION. <br /> FLOCCULANT DOSING) <br /> 4. BASIN AREA INCLUDES FUTURE MARITIME TENANT LEASEHOLD AND <br /> HIGH FLOW W/Q FLOW <br /> BYPASS / WAREHOUSE TENANT LEASEHOLD NORTH YARD. <br /> ORIFICE <br /> CONTROLLED <br /> LIFT STATION <br /> WITH PUMP RATE <br /> = W/Q FLOW. <br /> INTERNALLY SEE TABLE TO <br /> BYPASS ALL RIGHT <br /> FLOWS BEYOND TREATED WATER <br /> W/O FLOW RATE DISCHARGE TO OUTFALL BELOW GROUND <br /> TO OUTFALL D <br /> FLOW DIRECTION <br /> ► ABOVE GROUND <br /> FLOW DIRECTION <br /> CHECK VALVE, <br /> SEE NOTE 3 ► EXISTING ABOVE <br /> GROUND FLOW <br /> DIRECTION <br /> STORM WATER QUALITY TREATMENT CAPACITY <br /> MANHOLE 1 CESF TREATMENT FLOW DIAGRAM BASIN AREA (ACRE) 9 IMPERVIOUS FLOW CFS (GPM) TREATMENT TYPE CFS (GPM) <br /> - - SCALE: NTS 39.14 100 3.56 (1597) CESF 3.57 (1,600) <br /> (OFF—LINE) <br /> TO OUTFALL M <br /> W <br /> W <br /> w <br /> U) <br /> CALL 48HOURS w <br /> BEFORE YOU DIG 2 <br /> DIAL 811 LU <br /> VERT DATUM: NAVD 88 5 <br /> CONV TO MLLW = NAVD88+2.03 0 <br /> HORZ DATUM: HAD 83/91 W <br /> IF SHEET IS LESS THAN 22x34 w <br /> REDUCE SCALE ACCORDINGLY W <br /> R ENGINEER, SG PORT OF EVERETT °W° N° C4.12 <br /> A H <br /> N. W <br /> � N. WATSON ASS SHOWN 4■ 1 2 <br /> Port of NORTON TERMINAL DEVELOPMENT Q <br /> •A,•� DESIGNED BY: DATE: <br /> Kl. �OG�R OS/07/2021 CIP No. <br /> EvERE'TT & MTCA 3RD INTERIM ACTION 1-8-900-05 N <br /> DRAWN BY: CHECKED BY: <br /> 16015th Avenue,Suite 1300 ,yam 1K.LDS, D. YU %.IN&T$ON PROJECT m <br /> P.O. BOX 536 Seattle,Washington 98101 ® 05/07/2021 NW ISSUED FOR SUBSTANTIVE �; y APPROVED BY: STO R M WAT E R DETAILS NO. MT-NT-2021-02.2 <br /> EVERETT, WA 95206 REQUIREMENTS REVIEW. xy�pq,Ql� <br /> (425) 259-3164 (206)CTNO.1 Rax(206)382-0500 CESF TREATMENT FLOW DIAGRAM SHEET NO. XX OF XX U) <br /> PROJECT N0.1600120 N0. DATE BY REVISION N0. DATE BY REVISION O"r,- <br />
The URL can be used to link to this page
Your browser does not support the video tag.