My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Eastern Washington: For treatment installed upstream of detention or <br /> retention,the water quality design flow rate is the peak 15-minute flow rate <br /> as calculated using one of the three methods described in Chapter 2.2.5 of the <br /> Stormwater Management Manual for Eastern Washington (SWMMEW) or <br /> local manual. <br /> • Entire State: For treatment installed downstream of detention, the water <br /> quality design flow rate is the full 2-year release rate of the detention facility. <br /> 3. This designation has no expiration date, but Ecology may amend or revoke it. <br /> Ecology's Conditions of Use: <br /> The StormFilter with ZPG media shall comply with the following conditions: <br /> 1. Design, install, operate, and maintain the StormFilter with ZPG media in <br /> accordance with applicable Contech Engineered Solutions manuals, <br /> documents, and the Ecology Decision. <br /> 2. Install StormFilter systems to bypass flows exceeding the water quality <br /> treatment rate. Additionally, high flows will not re-suspend captured <br /> sediments. Design StormFilter systems in accordance with the performance <br /> goals in Ecology's most recent Stormwater Manual and CONTECH's <br /> Product Design Manual Version 4.1 (April 2006), or most current version, <br /> unless otherwise specified. <br /> 3. Owners must follow the design,pretreatment, land use application, and <br /> maintenance criteria in CONTECH's Design Manual. <br /> 4. Pretreatment of TSS and oil and grease may be necessary, and designers <br /> shall provide pre-treatment in accordance with the most current versions of <br /> the CONTECH's Product Design Manual(April 2006) or the applicable <br /> Ecology Stormwater Manual. Design pre-treatment using the performance <br /> criteria and pretreatment practices provided on Ecology's "Evaluation of <br /> Emerging Stormwater Treatment Technologies"website. <br /> 5. Maintenance: The required maintenance interval for stormwater treatment <br /> devices is often dependent upon the degree of pollutant loading from a <br /> particular drainage basin. Therefore, Ecology does not endorse or <br /> recommend a "one size fits all" maintenance cycle for a particular model/size <br /> of manufactured filter treatment device. <br /> • Typically, CONTECH designs StormFilter systems for a target filter <br /> media replacement interval of 12 months. Maintenance includes <br /> removing accumulated sediment from the vault, and replacing spent <br /> cartridges with recharged cartridges. <br /> CONTECH-StormFilter®GULD Maintenance Update(November 2012) Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.