My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
>
Address Records
>
FEDERAL AVE
>
2600
>
PORT OF EVERETT
>
2600 FEDERAL AVE 2021 PORT OF EVERETT 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:38:10 AM
Creation date
9/5/2025 12:01:45 PM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
2600
Tenant Name
PORT OF EVERETT
Year
2021
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
448
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Complete the data validation report. <br /> 2. Prepare a TEER summary, including a testing summary and conclusions <br /> compared with the supplier's performance claims. <br /> 3. Provide a recommendation of the appropriate technology use level. <br /> 4. Work with Ecology to post recommend relevant information on Ecology's <br /> website. <br /> 5. Provide additional testing recommendations, if needed." <br /> 6. This report, authored by Dr. Gary Minton, Ph. D., P.E., Resource Planning <br /> Associates, satisfies the Ecology requirement. <br /> • (Public) "Performance of the Stormwater Management StormFilter Relative to the <br /> Washington State Department of Ecology Performance Goals for Basic <br /> Treatment," is a summary of StormFilter performance that strictly adheres to the <br /> criteria listed in the Guidance for Evaluating Emerging Stormwater Treatment <br /> Technologies, Technology Assessment Protocol—Ecology(TAPE). <br /> • "Heritage Marketplace Field Evaluation: Stormwater Management StormFilter <br /> with ZPGTM Media," is a report showing all of the information collected at Site A <br /> as stated in the SMI Quality Assurance Project Plan (QAPP). This document <br /> contains detailed information regarding each storm event collected at this site, and <br /> it provided a detailed overview of the data and project. <br /> • "Lake Stevens Field Evaluation: Stormwater Management StormFilter with <br /> ZPGTM Media," is a report that corresponds to Site E as stated in the SMI QAPP. <br /> This document contains detailed information regarding each storm collected at <br /> this site, and includes a detailed overview of the data and project. <br /> • (Public) "Evaluation of the Stormwater Management StormFilter for the removal <br /> of SIL-CO-SIL 106, a standardized silica product: ZPGTM at 7.5 GPM" is a report <br /> that describes laboratory testing at full design flow. <br /> • "Factors Other Than Treatment Performance." <br /> • 'State of Washington Installations." <br /> • "Peak Diversion StormFilter"is a technical document demonstrating the Peak <br /> Diversion StormFilter system complies with the Stormwater Management Manual <br /> for Western Washington Volume V Section 4.5.1. <br /> Above-listed documents noted as "public" are available by contacting CONTECH. <br /> Applicant's Use Level Request: <br /> That Ecology grant a General Use Level Designation for Basic Treatment for the <br /> StormFilter using ZPGTM media(zeolite/perlite/granular activated carbon) at a hydraulic <br /> loading rate of 1 gpm/ft2 of media surface area in accordance with Ecology's 2011 <br /> Technical Guidance Manual for Evaluating Emerging Stormwater Treatment <br /> Technologies Technology Assessment Protocol—Ecology (TAPE). <br /> CONTECH-StormFilter®GULD Maintenance Update(November 2012) Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.