GENERAL NOTES. 26. GENERAL&SUBCONTRACTORS SHALL USE STAINLESS STEEL METAL LOCKING TIES FOR ALL CABLE STRUCTURAL STEEL NOTES: SYMBOLS AND ABBREVIATIONS
<br /> TRAY TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS(WHERE APPLICABLE).PLASTIC ZIP TIES
<br /> SHALL NOT BE PERMITTED FOR USE ON CLIENT PROJECTS.RECOMMENDED MANUFACTURE SHALL A/C AIR CONDITIONING MAX MAXIMUM
<br /> 1. DRAWINGS ARE NOT TO BE SCALED,WRITTEN DIMENSIONS TAKE PRECEDENCE,THIS SET OF BE:PANDUIT CORP.METAL LOCKING TIES MODEL NO.MLT4S-CP UNDER SERIES-304(OR EQUAL). 1. SHOP DRAWINGS FOR STRUCTURAL STEEL SHALL BE SUBMITTED TO THE CONSULTANT FOR AGL ABOVE GRADE LEVEL MECH MECHANICAL
<br /> DOCUMENTS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSES ONLY,UNLESS NOTED PANDUIT PRODUCT DISTRIBUTED BY TRIARC OF TACOMA,WA. REVIEW PRIOR TO FABRICATION. APPROX APPROXIMATELY MTL METAL
<br /> OTHERWISE.THE GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MFR MANUFACTURE T
<br /> PROJECT AS DESCRIBED IN THE DRAWINGS AND OWNERSPMENT,LABOR,AND ANY S DEEMED PRO PROJECT MANUAL. DESIGN
<br /> TO COMPLETE DESIGN CRITERIA: 2 STRENGTH FIE D. STRUCTURAL EEL DESIGN,BOLLTING,EXPANSONION AND ERECTION(INCLUDING FIELD WELDING,BO BOLTS,AND THREADED EADED EXPANSION IONANCHORS)SHALL BE BLKG BUILDING BLOCKING MIN MNHMUMR Mobile-
<br /> 2.
<br /> BASED ON THE A.I.S.I."SPECIFICATION FOR THE DESIGN,FABRICATION,AND ERECTION OF B.O. BOTTOM OF MISC MISCELLANEOUS
<br /> PRIOR TO THE SUBMISSION OF BIDS,CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE TO THE STRUCTURAL DESIGN OF THIS PROJECT IS IN ACCORDANCE WITH THE 2015 INTERNATIONAL STRUCTURAL STEEL FOR BUILDINGS"LATEST EDITION.SUPERVISION SHALL BE IN ACCORDANCE B.O.S. BOTTOM OF STEEL
<br /> FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE PROPOSED PROJECT. BUILDING CODE WITH WASHINGTON STATE BUILDING CODE AMENDMENTS(2015 IBC) WITH 2015 IBC CHAPTER 22,BY A QUALIFIED TESTING AGENCY DESIGNATED BY THE CONSULTANT. N/A NOT APPLICABLE
<br /> CONTRACTORS SHALL VISIT THE CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT THE CONSULTANT SHALL BE FURNISHED WITH A COPY OF ALL INSPECTION REPORTS AND TEST CLG CEILING NIC NOT IN CONTRACT
<br /> DOCUMENTS TO VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE DESIGN LOADS: RESULTS. CLR CLEAR N.S. NEAR SIDE
<br /> ACCOMPLISHED AS SHOWN.PRIOR TO PROCEEDING WITH CONSTRUCTION,ANY ERRORS, DESIGN DATA FOR THE CITY OF EVERETT,WA: CMU CONCRETE MASONRY UNIT NTS NOT TO SCALE
<br /> OMISSIONS,OR DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE 3. STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: CONC CONCRETE PLANS PREPARED BY:
<br /> ARCHITECT/ENGINEER VERBALLY AND IN WRITING. -ROOF SNOW LOAD 25 psf CONST CONSTRUCTION O.C. ON CENTER
<br /> TYPE OF MEMBER CONT CONTINUOUS O.D. OUTSIDE DIAMETER
<br /> 3. THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN THE CONSTRUCTION -BASIC WIND SPEED 110 MPH(3 SEC GUST) O/H OVERHEAD COPINeIiTON�
<br /> AND CONTRACT DOCUMENTS THE COMPLETE SCOPE OF WORK.CONTRACTORS BIDDING THE JOB A. WIDE FLANGE SHAPE ASTM A992,Fy 50 KSI DBL DOUBLE E E R N N
<br /> ARE NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR -WIND EXPOSURE B B. OTHER SHAPE,PLATES AND ROD ASTM A36,Fy 36 KS I DIA/0 DIAMETER PLCS PLACES
<br /> SPECIFICATIONS SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND C. PIPE COLUMNS ASTM A53,Fy 35 KSI DIAG DIAGONAL PLYWD PLYWOOD
<br /> IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS.THE BIDDER SHALL CODE COMPLIANCE: E STRUCTURAL TUBING ASTM A500,Fy 46 KSI ON DOWN PROJ PROJECT 16928 WOODINVILLE-REDMOND RD NE,SUITE 210
<br /> BEAR THE RESPONSIBILITY OF NOTIFYING(IN WRITING)THE ARCHITECT/ENGINEER OF ANY E. ANCHOR BOLTS ASTM A307 DET DETAIL PROP PROPERTY WOODINVILLE,WA 98072
<br /> CONFLICTS,ERRORS,OR OMISSIONS PRIOR TO SUBMISSION OF CONTRACTOR'S PROPOSAL.IN THE F. CONNECTION BOLTS ASTM A325 DWG DRAWING PSF POUNDS PER SQUARE FOOT PHONE:425.487.1732
<br /> EVENT OF DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE ALL WORK AND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE PSI POUNDS PER SQUARE INCH W W W.CORNERSTONE-ENGR.COM
<br /> WORK,UNLESS DIRECTED OTHERWISE. CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY THE LOCAL GOVERNING AUTHORITIES. 4. ALL MATERIAL TO BE HOT DIPPED GALVANIZED AFTER FABRICATION PER A123/A123M-13. EA EACH PT PRESSURE TREATED
<br /> NOTHING IN THESE PLANS IS TO BE CONSTRUCTED TO PERMIT WORK NOT CONFORMING TO THESE EL ELEVATION
<br /> 4. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED IN THE CONTRACT CODES. 5. ALL WELDING SHALL BE IN CONFORMANCE WITH A.I.S.I.AND AWS STANDARDS AND SHALL BE ELEC ELECTRICAL RAID RADIUS PROJECT INFO:
<br /> DOCUMENTS.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION PERFORMED BY W.A.B.O.CERTIFIED WELDERS USING E70 XX ELECTRODES.ONLY PREQUALIFIED EQ EQUAL REQ REQUIRED
<br /> MEANS,METHODS,TECHNIQUES,SEQUENCES,AND PROCEDURES FOR COORDINATING ALL BUILDING/DWELLING CODE 2015IBC(STATE BUILDING CODE,WAC CHAPTER 5150) WELDS(AS DEFINED BY AWS)SHALL BE USED.WELDING OF GRADE 60 REINFORCING BARS(IF EQUIP EQUIPMENT RM ROOM
<br /> PORTIONS OF THE WORK UNDER THE CONTRACT. 2015 IRC(STATE BUILDING CODE,WAC CHAPTER 51-51) REQUIRED)SHALL BE PERFORMED USING LOW HYDROGEN ELECTRODES.WELDING OF GRADE 40 E.W. EACH WAY RO ROUGH OPENING SE01510A
<br /> STRUCTURAL CODE 2015IBC(STATE BUILDING CODE,WAC CHAPTER 51-50) REINFORCING BARS(IF REQUIRED)SHALL BE PERFORMED USING E70 XX ELECTRODES.WELDING EXT EXTERIOR
<br /> 5. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO MECHANICAL CODE 20151MC(STATE BUILDING CODE,WAC CHAPTER 51-52) WITHIN 4"OF COLD BENDS IN REINFORCING STEEL IS NOT PERMITTED.SEE REINFORCING NOTE SCH SCHEDULE
<br /> MANUFCODES R RDIN LACES R'STAKE
<br /> SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL ELECTRICAL CODE 2017 NEC(DEPT.OFFIRE/LIFE SAFETY CODE 2015 FC(STATE BUILDING CODE,WAC CHAPTER 5BOR&INDUSTIRES,WAC H54A;R 296-46B) FOR MATERIAL REQUIREMENTS OF WELDED BARS. FIN FLUOR FLUOSH SHT SHEET
<br /> RESCENT IM SIMILAR DOWNTOWN EVERETT-WALL
<br /> CODES OR ORDINANCES TAKE PRECEDENCE.
<br /> 6. COLD-FORMED STEEL FRAMING MEMBERS SHALL BE OF THE SHAPE,SIZE,AND GAGE SHOWN ON FLR FLOOR SPEC SPECIFICATION
<br /> 6. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT FACILITY IS UNMANNED AND NOT FOR HUMAN HABITATION.HANDICAPPED ACCESS REQUIREMENTS ARE THE PLANS.PROVIDE MINIMUM SECTION PROPERTIES INDICATED.ALL COLD-FORMED STEEL F.S. FAR SIDE SF SQUARE FOOT
<br /> ACCORDANCE WITH ALL APPLICABLE CODES,REGULATIONS,AND ORDINANCES.CONTRACTOR NOT REQUIRED IN ACCORDANCE WITH THE 2015 IBC BUILDING CODE. FRAMING SHALL CONFORM TO THE A.I.S.I."SPECIFICATION FOR THE DESIGN OF COLD-FORMED FT FOOT SS STAINLESS STEEL 2930 WETMORE AVENUE
<br /> SHALL GIVE ALL NOTICES AND COMPLY WITH ALL LAWS,ORDINANCES,RULES,REGULATIONS AND STEEL STRUCTURAL MEMBERS." STL STEEL
<br /> LAWFUL ORDERS OF ANY PUBLIC AUTHORITY,MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS, CONCRETE NOTES: GA GAUGE STRUCT STRUCTURAL EVERETT,WA 98201
<br /> AND LOCAL AND STATE JURISDICTIONAL CODES BEARING ON THE PERFORMANCE OF THE WORK. 7. BOLTED CONNECTIONS SHALL USE BEARING TYPE ASTM A325 BOLTS(3/4"DIA.)AND SHALL HAVE A GALV GALVANIZED STD STANDARD SNOHOMISH COUNTY
<br /> 1 ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE WITH ACI 318 MINIMUM OF TWO BOLTS UNLESS NOTED OTHERWISE. G.C. GENERAL CONTRACTOR SO FT SQUARE FOOT
<br /> . .
<br /> 7. GENERAL CONTRACTOR SHALL PROVIDE,AT THE PROJECT SITE,A FULL SET OF CONSTRUCTION GRND GROUND SO IN SQUARE INCH
<br /> DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND ADDENDA OR CLARIFICATIONS FOR USE 2 CONCRETE SHALL BE MIXED,PROPORTIONED,CONVEYED AND PLACED IN ACCORDANCE WITH 8. NON-STRUCTURAL CONNECTIONS FOR STEEL GRATING MAY USE 5/8"DIA.ASTM A307 BOLTS GYP BD GYPSUM WALL BOARD SUSP SUSPENDED ISSUED FOR:
<br /> BY ALL PERSONNEL INVOLVED WITH THE PROJECT.THIS SET IS A VALID CONTRACT DOCUMENT UNLESS NOTED OTHERWISE.
<br /> ONLY IF THE TITLE SHEET IS STAMPED"FOR CONSTRUCTION"AND EACH SUCCESSIVE SHEET BEARS CHAPTER 19 OF THE 2015 IBC.STRENGTHS AT 28 DAYS AND MIX CRITERIA SHALL BE AS HORZ HORIZONTAL THK THICK C CONSTRUCTION
<br /> L
<br /> THE ARCHITECT'S SIGNED WET STAMP. FOLLOWS.
<br /> 9. ALL STEEL WORK SHALL BE PAINTED IN ACCORDANCE WITH THE DESIGN&CONSTRUCTION HR HOUR THRU THROUGH
<br /> TYPE OF CONSTRUCTION 28 DAY STRENTHS W/C MINIMUM CEMENT SPECIFICATION AND IN ACCORDANCE WITH ASTM A36 UNLESS NOTED OTHERWISE. HT HEIGHT TNNG TINNED
<br /> 8. THE STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR FACILITIES ARE NOT TO BE HVAC HEATING VENTILATION T.O. TOP OF
<br /> ALTERED BY THIS CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. (fc) RATIO CONTENT 10. ALL WELDS TO BE 1/4"FILLET UNLESS NOTED OTHERWISE. AIR CONDITIONING T.O.S. TOP OF STEEL REV::DATE:-ISSUED FOR: BY:
<br /> PER CUBIC YARD TYP TYPICAL
<br /> 9. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L.LISTED OR FIRE MARSHALL 11. TOUCH UP ALL FIELD DRILLING AND WELDING WITH 2 COATS OF GALVACON(ZINC RICH PAINT)OR I.D. INSIDE DIAMETER Q 09-25-20 CLI ENT COMMENTS DRA
<br /> 5
<br /> APPROVED MATERIALS IF APPLICABLE TO THIS FACILITY AND OR PROJECT SITE. A. SLABS ON GRADE 2,500 PSI 0.45 5 SACKS APPROVED EQUAL. IN INCH UNO UNLESS NOTED OTHERWISE
<br /> TOPPING SLABS INFO INFORMATION
<br /> CONCRETE PIERS TOWER/POLE NOTES: Q 07-10-20 FINAL DMO
<br /> 10. CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS THAN INSUL INSULATION VERT VERTICAL
<br /> 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL DISTANCE TO ALL PORTIONS OF PROJECT AREA DURING INT INTERIOR V.I.F. VERIFY IN FIELD
<br /> B. ALL STRUCTURAL CONCRETE 4,000 PSI <_0.45 6 1/2 SACKS
<br /> CONSTRUCTION. IBC INTERNATIONAL BUILDING CODE
<br /> EXCEPT WALLS 1. VERIFICATION THAT THE PROPOSED TOWER/POLE CAN SUPPORT THE PROPOSED ANTENNA W/ WITH
<br /> 11. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, LOADING IS TO BE DONE BY OTHERS. LBS POUNDS W/O WITHOUT B 06-01-20 REVISED TO ANCHOR JRF
<br /> EASEMENTS,PAVING,CURBING,ETC.DURING CONSTRUCTION.UPON COMPLETION OF WORK, C. CONCRETE WALLS 4,000 PSI 50.45 6 1/2 SACKS WP WATER PROOF
<br /> CONTRACTOR SHALL REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION 2. PROVIDE SUPPORTS FOR THE ANTENNA COAX CABLES TO THE ELEVATION OF ALL INITIAL AND
<br /> ON OR ABOUT THE PROPERTY. CEMENT SHALL BE ASTM C150,PORTLAND CEMENT TYPE II U.N.O. FUTURE ANTENNAS.ANTENNA COAX CABLES ARE TO BE SUPPORTED AND RESTRAINED AT THE A 05-04-20 PRELIMINARY JRF
<br /> CENTERS SUITABLE TO THE MANUFACTURER'S REQUIREMENTS.
<br /> 12. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD FREE DURING 2. THE GENERAL CONTRACTOR SHALL SUPERVISE AND BE RESPONSIBLE FOR THE METHODS AND
<br /> CONSTRUCTION AND DISPOSE OF ALL DIRT,DEBRIS,AND RUBBISH OFFSITE.CONTRACTOR SHALL PROCEDURES OF CONCRETE PLACEMENT. ABBREVIATED ROOFTOP SAFETY PROCEDURES R PLATE CHAIN-LINK FENCE DRAWN BY:-CHK.: APV.:
<br /> REMOVE EQUIPMENT NOT SPECIFIED AS REMAINING ON THE PROPERTY OR PREMISES.SITE SHALL 3. ALL CONCRETE WITH SURFACES EXPOSED TO STANDING WATER SHALL BE AIR-ENTRAINED WITH AN CENTERLINE JRF CHAIN-LINK FENCE W/BARB WIRE
<br /> MWO MWO
<br /> BE LEFT IN CLEAN CONDITION AND FREE FROM PAINT SPOTS,DUST,OR SMUDGES OF ANY NATURE. (WHEN APPLICABLE): t, ❑ D O WOOD FENCE
<br /> AIR-ENTRAINING AGENT CONFORMING TO ASTM C260,C494,C618,C989 AND C1017.TOTAL AIR
<br /> 13. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH CONTENT SHALL BE IN ACCORDANCE WITH ACI 318. (E) EXISTING T T TELEPHONE CURRENT ISSUE DATE:
<br /> (AS PER"ACCIDENT PREVENTION PROGRAM"-BY PERMISSION OF WREN CONSTRUCTION,INC.- P P POWER
<br /> CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE # DETAIL NUMBER
<br /> CONSTRUCTION DRAWINGS/CONTRACT DOCUMENTS. 4. REINFORCING STEEL SHALL CONFORM TO ASTM A615(INCLUDING SUPPLEMENT SI),GRADE 60, 03/01/99) X ----------- GROUND WIRE C 09-25-20
<br /> fy=60,000 PSI.EXCEPTIONS:ANY BARS SPECIFICALLY SO NOTED ON THE DRAWINGS SHALL BE SHEET NUMBER COAX COAXIAL CABLE L
<br /> 14. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED HOURS TO AVOID GRADE 40,fy=40,000 PSI.GRADE 60 REINFORCING BARS INDICATED ON DRAWINGS TO BE WELDED FALL PROTECTION METHODS AND EQUIPMENT
<br /> DISTURBING NORMAL BUSINESS. SHALL CONFORM TO ASTM A706.REINFORCING COMPLYING WITH ASTM A615(Si)MAY BE WELDED ROOF TOP INSTALLATIONS LICENSURE:
<br /> ONLY IF MATERIAL PROPERTY REPORTS INDICATING CONFORMANCE WITH WELDING PROCEDURES
<br /> 15. THE CONTRACTOR SHALL PROVIDE THE CLIENT PROPER INSURANCE CERTIFICATES NAMING SPECIFIED IN A.W.S.D14 ARE SUBMITTED. 1. FOR WORK BEING PERFORMED WITHIN 25'OFAN UNPROTECTED ROOF EDGE,THE CONSTRUCTION SPECIAL INSPECTIONS: ,.
<br /> CLIENT AS ADDITIONAL INSURED,AND CLIENT PROOF OF LICENSE(S)AND PE&PD INSURANCE. SUPERVISOR SHALL DESIGNATE A TRAINED SAFETY MONITOR TO OBSERVE THE MOVEMENTS AND ES LE)•
<br /> 5. REINFORCING STEEL SHALL BE DETAILED(INCLUDING HOOKS AND BENDS)IN ACCORDANCE WITH ACTIVITIES OF THE CONSTRUCTION WORKERS.
<br /> SPECIAL INSPECTIONS IN ACCORDANCE WITH 2015 IBC SECTION 1704.
<br /> 16. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND COORDINATING ALL INSPECTIONS.
<br /> AC1315 AND 318.LAP ALL CONTINUOUS REINFORCEMENT AT LEAST 30 BAR DIAMETERS OR
<br /> MINIMUM OF 2'-0".PROVIDE CORNER BARS AT ALL WALL AND FOOTING INTERSECTIONS.LAP 2. SAFETY MONITOR SHALL WARN CONSTRUCTION WORKERS OF HAZARDS(I.E.,BACKING UP TOWARD
<br /> 17. CAUTION!CALL BEFORE YOU DIG!BURIED UTILITIES EXIST IN THE AREA AND UTILITY INFORMATION CORNER BARS AT LEAST 30 BAR DIAMETERS OR A MINIMUM OF 2'-0".LAP ADJACENT MATS OF A ROOF EDGE,ETC.)OR UNSAFE ACTIVITIES.THE SAFETY MONITOR MUST BE ON THE SAME ROOF SOILS/GEOTECHNICAL:
<br /> SHOWN MAY NOT BE COMPLETE.CONTACT THE ONE-CALL UTILITY LOCATE SERVICE A MINIMUM OF WELDED WIRE FABRIC A MINIMUM OF 8"AT SIDES AND ENDS. AND WITHIN VISUAL AND VERBAL DISTANCE OF THE CONSTRUCTION WORKERS. ❑SHORING INSTALLATION AND MONITORING
<br /> 48 HOURS PRIOR TO CONSTRUCTION.DIAL 811. []OBSERVE AND MONITOR EXCAVATION 32 04
<br /> 6. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185. 3. CONSTRUCTION INVOLVING WORKERS TO APPROACH WITHIN V OR LESS OF AN UNPROTECTED
<br /> ❑VERIFY SOIL BEARING K
<br /> 18. CONTRACTOR TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS AND SUBMIT TO CLIENT ROOF EDGE,REQUIRES WORKERS TO USE SAFETY LINE. psf BEARING G/STE
<br /> []SUBSURFACE DRAINAGE PLACEMENT FSS/ NOS 9-25-2020
<br /> ALONG WITH REDLINED CONSTRUCTION SET. 7. SPIRAL REINFORCEMENT SHALL BE PLAIN WIRE CONFORMING TO ASTM A615,GRADE 60,fy=60,000 ONAL E
<br /> PSI. 4. SAFETY LINE SHALL BE MINIMUM'/:"DIAMETER NYLON,WITH A NOMINAL TENSILE STRENGTH OF ❑VERIFY FILL MATERIAL AND COMPACTION
<br /> 19. CONTRACTOR TO DOCUMENTALL CHANGES MADE IN THE FIELD BY MARKING UP(REDLINING)THE 5400 LBS. ❑VERIFY CONDITIONS AS ANTICIPATED
<br /> APPROVED CONSTRUCTION SET AND SUBMITTING THE REDLINED SET TO THE CLIENT UPON 8. NO BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE SHALL BE FIELD BENT UNLESS ❑PILE PLACEMENT(AUGER CAST/DRIVEN PILE)
<br /> COMPLETION. SPECIFICALLY$O DETAILED OR APPROVED BY THE CONSULTANT. 5. SAFETY LINE SHALL BE ATTACHED TO A SUBSTANTIAL MEMBER OF THE STRUCTURE. ❑OTHER JURISDICTIONAL APPROVAL:
<br /> 20. FOR COLLOCATION SITES:CONTACT TOWER OWNER REPRESENTATIVE FOR PARTICIPATION IN BID 10. CONCRETE PROTECTION(COVER)FOR REINFORCING STEEL SHALL BE AS FOLLOWS: 6. SAFETY LINE LENGTH SHALL BE SET ALLOWING CONSTRUCTION WORKER TO REACH EDGE OF
<br /> WALK. ROOF,BUT NOT BEYOND. REINFORCED CONCRETE:
<br /> -CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH 3" ❑REINFORCING STEEL AND CONCRETE PLACEMENT
<br /> 21. GENERAL CONTRACTOR IS TO COORDINATE ALL POWER INSTALLATION WITH POWER COMPANYAS 7. SAFETY BELTS SHALL BE WORN BY ALL CONSTRUCTION WORKERS. ❑PRESTRESSED/PRECAST CONCRETE FABRICATION AND ERECTION
<br /> REQUIRED.CONTRACTOR TO REPORT POWER INSTALLATION COORDINATION SOLUTION(S)TO -CONCRETE EXPOSED TO EARTH OR WEATHER ❑BATCH PLANT INSPECTION
<br /> NETWORK CARRIER REPRESENTATIVE,PROJECT CONSTRUCTION MANAGER AND ARCHITECT. (#6 BARS OR LARGER) 2" 8. MONTHLY SAFETY INSPECTION AND MAINTENANCE OF THE FALL PROTECTION EQUIPMENT SHALL
<br /> (#5 BARS OR SMALLER) 1 1/2" OCCUR BY THE SAFETY COMMITTEE REPRESENTATIVES,INCLUDING: ❑SHOTCRETE
<br /> ❑GROUTING
<br /> 22. ANY SUBSTITUTIONS OF MATERIALS AND/OR EQUIPMENT,MUST BE APPROVED BY CLIENT -CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND INSPECTION OF CONSTRUCTION AREA FOR HAZARDS ❑OTHER
<br /> CONSTRUCTION MANAGER.
<br /> (SLABS,WALLS AND JOISTS)(#11 BARS AND SMALLER) 3/4" USE OF AN INSPECTION CHECKLIST
<br /> 23. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE (BEAMS,COLUMNS)(PRIMARY REINFORCEMENT,TIES,STIRRUPS,SPIRALS) 1 1/2" INTERVIEWING COWORKERS REGARDING SAFETY CONCERNS STRUCTURAL STEEL:
<br /> PENETRATION OF EXISTING ROOFING MATERIALS OCCUR,THE GENERAL CONTRACTOR SHALL REPORTING AND DOCUMENTING ANY HAZARDS ❑FABRICATION AND SHOP WELDS PROPRIETARY INFORMATION:
<br /> COORDINATE WITH BUILDING OWNER AND BUILDING ROOFING CONTRACTOR OF RECORD FOR 11. BARS SHALL BE SUPPORTED ON CHAIRS OR DOBIE BRICKS. REPORTING HAZARDS TO THE SAFETY COMMITTEE FOR CONSIDERATION
<br /> INSTALLATION,PATCH,REPAIR OR ANY AUGMENTATION TO THE ROOF,AND HAVE THE WORK POSTING RESULTS OF INSPECTION AND ANY ACTION TAKEN ❑ERECTION AND FIELD WELDS AND BOLTING
<br /> GUARANTEED UNDER THE ROOFING CONTRACTOR'S WARRANTY FOR MOISTURE PENETRATION OR 12. ANCHOR BOLTS TO CONFORM TO ASTM A307. RECEIVING AN UNBIASED REVIEW OF ONE'S OWN WORK AREA BY ANOTHER COWORKER SAFETY ❑OTHER DO NOT SCALE DRAWINGS.CONTRACTOR MUST VERIFY
<br /> REPRESENTATIVE ALL DIMENSIONS AND ADVISE CONSULTANTS OF ANY
<br /> AND OTHER FUTURE BREACH OF ROOFING INTEGRITY. 13. NON-SHRINK GROUT SHALL BE FURNISHED BY AN APPROVED MANUFACTURER AND SHALL BE ERRORS AND OMISSIONS.ALL PREVIOUS ISSUES OF THIS
<br /> 24. IN THE CASE OF ROOFTOP SOLUTIONS WITH THE INSTALLATION OF ANTENNAS WITHIN CONCEALED MIXED AND PLACED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S PUBLISHED REFER TO ROOFTOP WORK AREA SAFETY PROTOCOL DRAWING STRUCTURAL ALUMINUM: THE NFORMARE SUPERSEDED CONTAINED N THIS LATEST REVISION.
<br /> SET SET O DOCUMENTS
<br /> (SHROUDED)SUPPORT FRAMES OR TRIPODS,THE GENERAL CONTRACTOR SHALL COORDINATE RECOMMENDATIONS.GROUT STRENGTH SHALL BE AT LEAST EQUAL TO THE MATERIAL ON WHICH NATIONAL ASSOCIATION OF TOWER ERECTORS 2000 PUBLICATION
<br /> IT IS PLACED(3,000 PSI MINIMUM). ❑FABRICATION AND SHOP WELDS IS PROPRIETARY BY NATURE.ANY USE OR DISCLOSURE
<br /> WITH THE FRP DESIGNER/FABRICATOR TO ENSURE THAT THE FINAL FRP SHROUD IS SIMULATING(IN REFERENCED OSHA REGULATION/STANDARDS SHALL BE REVIEWED BY TOWER ERECTORS, ❑ERECTION AND FIELD WELDS AND BOLTING OTHER THAN WHICH IS RELATED TO NAMED CLIENT IS
<br /> APPEARANCE)DESIGNATED EXISTING EXTERIOR BUILDING FACADE MATERIALS,TEXTURES,AND 14. ALL EXPANSION ANCHORS TO BE HILTI BRAND.ADHESIVE ANCHORS REQUIRE TESTING TO EQUIPMENT INSTALLERS,AND TOWER/ROOF TOP CONTRACTORS/SUBCONTRACTORS ❑OTHER STRICTLY PROHIBITED.
<br /> COLORS.THE CONTRACTOR SHALL FURTHERMORE ENSURE THE USE OF COUNTERSUNK CONFIRM CAPACITY UNLESS WAIVED 6Y ENGINEER 29 CFR 1926.500-SCOPE,APPLICATION,AND DEFINITIONS
<br /> .
<br /> FASTENERS IN ALL FRP CONSTRUCTION.WHEN PHOTO SIMULATIONS ARE PROVIDED,THE 29 CFR 1926.501-DUTY TO HAVE FALL PROTECTION DRAWING TITLE:
<br /> CONTRACTOR SHALL ENSURE THAT FINAL CONSTRUCTION REPRESENTS WHAT IS INDICATED IN 19 CFR 1926.502-FALL PROTECTION SYSTEMS CRITERIA AND PRACTICES
<br /> PHOTO SIMULATIONS.SHOP DRAWINGS SHALL BE PROVIDED TO THE GENERAL CONTRACTOR, STRUCTURAL MASONRY:
<br /> CONSTRUCTION COORDINATOR,AND ARCHITECT PRIOR TO FABRICATION AND CONSTRUCTION. ❑CONTINUOUS GENERAL NOTES
<br /> 25. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR ANTENNA FRAMES WHERE CALL TWO WORKING DAYS ❑PERIODIC
<br /> ANCHORING TO A CONCRETE ROOF SLAB IS REQUIRED,CONTRACTORS SHALL CONFIRM(PRIOR TO BEFORE YOU DIG! ❑OTHER DRAWING NUMBER:
<br /> SUBMITTING BID)WITH CONSULTING CONSTRUCTION COORDINATOR AND ARCHITECT THE
<br /> PRESENCE OF POST TENSION TENDONS WITHIN THE ROOF SLAB-RESULTING FROM AN 811 OTHER: NONE REQUIRED
<br /> UNDOCUMENTED DESIGN CHANGE IN THE EXISTING BUILDING"AS-BUILT DRAWING SET"-HAVING
<br /> INDICATED AN ORIGINAL DESIGN SOLUTION OF REINFORCED CONCRETE W/EMBEDDED STEEL �\ / w
<br /> REBAR.IN THE EVENT POST TENSION SLAB SOLUTION IS PRESENT,CONTRACTOR SHALL INCLUDE NATIONAL UTILITIES UNDERGROUND LOCATE (V
<br /> PROVISIONS FOR X-RAY PROCEDURES(INCLUDED IN BID)FOR ALL PENETRATION AREAS WHERE TDR/sIATAu ANCHORING TO CONCRETE:
<br /> ANCHORING OCCURS. r� _N.N Ac..RDANCEW_,RRSNTos"lllENlllYllNNA STAND_s ❑BOLTS INSTALLED IN CONCRETE
<br /> N ❑POST-INSTALLATION ADHESIVE ANCHORS
<br /> ❑POST-INSTALLATION MECHANICAL ANCHORS CEI JOB NUMBER: L600/ANCHOR 20-06014
<br />
|