My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/06/22 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/06/22 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 10:19:23 AM
Creation date
6/24/2016 10:18:53 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 <br /> Mr. Corbin Hammer,PE, SE <br /> SHANNON 5WILSON,INC. <br /> Reid Middleton,Inc. <br /> June 1,2016 <br /> Page 2 of 5 <br /> ■ Preconstruction meetings with design team; <br /> ■ Observation of mass excavation; <br /> ■ Screen material for reuse as backfill; <br /> ■ Environmental screening, as required; <br /> ■ Installation and testing of tiebacks; <br /> • Observation and evaluation of manhole and pipe subgrades; <br /> ■ Installation of 12-inch-diameter pipe piles; and <br /> ■ Placement and compaction of backfill. <br /> s depending on <br /> Our services will be provided on a full-time,part-time,o .or on-call <br /> willlrelyron the Contractor inform <br /> e <br /> activities underway and the schedule of the Con <br /> us of the times that we are needed at the project site. At least 24 hours' advance notice is <br /> requested for our services during an on-call basis. During mass excavation,installation and <br /> testing of the tiebacks,and installation of the pile foundation elements,we will have a <br /> representative on site,full-time. Our services for the remaining tasks will be either part-time or <br /> on-call, as required by the construction schedule. <br /> After each site visit, our field representative will prepare daily field activity reports of observed <br /> construction activities and tests. Copies of our reports will be sent electronically to the City of <br /> Everett,The General Contractor,and RMI. Please let us know if additional circulation copies <br /> are required. <br /> While at the project site,our field representative will advise the City and Contractor of our <br /> observations and opinions. Recommendations that may affect the contract costs will be made to <br /> the owner. Our field representative will not instruct or direct the Contractor,as his direction <br /> should be received from the owner or others responsible for contract administration. We will <br /> contact you directly if immediate action needs to be taken. Our duties do not include a review of <br /> or responsibility for the adequacy of safety measures at or near the project site. <br /> Environmental Screening <br /> Based on the laboratory analytical results and field observations of the soil samples collected at <br /> the site along the proposed utility corridor,the majority of the soil appears to not be <br /> contaminated. However,soil represented by one of the composite samples,GP-1-7.5C,is <br /> impacted by heavy oil-range hydrocarbons. At a minimum,we recommend that environmental <br /> screening of the excavated material occur near the location of boring GP-1. We assume that our <br /> 21-2-62768-001 <br /> 21-2-62768-0O1-LI-Revhvpllkn <br /> 139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.