Laserfiche WebLink
4 <br /> 9 SHANNON &WILSON, INC. <br /> TABLE 1 <br /> FEE ESTIMATE <br /> Labor Estimate(Hours) �+ t Q x� y� <br /> . i� z �.� tar mt*'► ;,�i� i' l, arty r �'.R. .-i g ��k ac' '�t� k'2n"�10�4�t�Y MT*i`�. <br /> ' , F AO-4f,s. h 4s �r � e#'9s- l C � °a,[r ; a+-r'$: i'i-1�raS�r . s 5dti P4-_OW" <br /> 1 t i �, Tas ; 14i6- r .-.0 -010 INKRAV S.i ns._ h-A,x --- <br /> V <br /> �' rt+ } ]a1Yi1•fSl: 411. _sic - ]�_: L` 3_ L ♦.y.a <br /> 1.0 Contractor Submittal Review <br /> Pipe Pile Submittal 0.5 3 3.5 <br /> Tieback Submittal 0.5 3 3.5 <br /> Dewatering Submittal 4 4 <br /> 2.0 Geotechnical/Environmental Construction Observation <br /> Preconstruction Meeting • 2 2 4 <br /> Observation of Mass Excavation,Subgrade <br /> Observation,and Environmental Screening(assumed 50 50 <br /> • 1 week of excavation observation @ 10 hours per day <br /> including travel time and report preparation) <br /> Tieback Installation(assumed I week @ 10 hours per 50 50 <br /> day including travel time)and report preparation <br /> Tieback Testing(assumed 1 hour per proof test,2 <br /> hours per performance test, and 1 hour for test 19 19 <br /> interpretation and report preparation) <br /> Pipe Pile Driving Criteria(WEAP Analysis) 1 4 5 <br /> Pipe Pile Installation(assumed 1 day @ 10 hours 10 10 <br /> including travel time and report preparation) <br /> Placement and Compaction of Backfill(assumed 1 <br /> week @ 10 hours per day including travel time and 50 50 <br /> report preparation) <br /> 2.0 Office Review,Supervision, and Consulting Services <br /> Field Activity Report Review 8 8 <br /> Environmental Testing/Analytical Results Review 4 10 14 <br /> Groundwater Monitoring Review 1.5 1.5 <br /> Additional Project Meetings(assumed conference 2 2 <br /> • <br /> calls) <br /> Site Visits-Review of Unanticipated Conditions 2 2 <br /> Column Totals(hours) 21.5 14 191 226.5 <br /> Notes; Actual construction observation charges will be based on the actual time spent to provide the required services. In <br /> the above estimate,we assumed that only one field representative at a time would be required to observe the construction <br /> tasks. <br /> RCRA=Resource Conservation and Recovery Act <br /> WEAP=Wave Equation Analysis Pile <br /> -,1-7_(77AR_110 i4.1-TiIwontcn IAA 2 of 2 21-2-62768-001 <br />