Laserfiche WebLink
REQUIRED SPECIAL INSPECTIONS AND TEST PER IBC 2021 <br /> INDICATED ITEMS REQUIRING SPECIAL INSPECTION ARE IDENTIFIED UNDER COLUMNS"FREQUENCY OF INSPECTION"AS"PERIODIC"OR"CONTINUOUS" <br /> OR UNDER COLUMNS"INSPECTION ACTION"AS"PERFORM"OR"OBSERVE".IF NO BOX IS CHECKED,EITHER THE TASK DOES NOT EXIST OR DOES NOT <br /> REQUIRE ANY SPECIAL INSPECTION. <br /> STATEMENT OF SPECIAL INSPECTIONS 2021 IBC SPECIAL CASES (IBC 1705.1.1): WELDED CONNECTION-AFTER WELDING (TABLE N5.4-3,AISC 360-16): <br /> 1. THE OWNER SHALL HIRE AN INDEPENDENT TESTINGMSPECTION AGENCY TO PERFORM REQUIRED SPECIAL ITEM FREQUENCY OF INSPECTION INSTRUCTIONS ITEM INSPECTION ACTION INSTRUCTIONS <br /> INSPECTIONS IN ACCORDANCE WITH SECTION 1704.2 OF THE INTERNATIONAL BUILDING CODE(IBC). <br /> 2. THE STATEMENT OF SPECIAL INSPECTIONS HEREIN IS FULFILLMENT OF THE REQUIREMENTS OF IBC SECTIONS 17D4 MATERIAL ALTERNATIVES CONTINUOUS ® PERIODIC ❑ PER DESIGN PROFESSIONAL IN FROM AN ACCEPTED ACCRED TRESPONSIBLE AGENCY(IL CC-ES).GE OR <br /> WELDS CLEANED PERFORM ❑ OBSERVE ® VERIFY THAT WELDS HAVE BEEN PROPERLY CLEANED <br /> AND 1705. ATION <br /> 3. SPECIAL INSPECTIONS AND TESTING SHALL BE PERFORMED IN ACCORDANCE WITH THE APPROVED PLANS AND PER DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE OR REPORT <br /> SPECIFICATIONS,THIS STATEMENT,IBC CHAPTER 17 AND ITS REFERENCED STANDARDS. UNUSUAL DESIGN APPLICATIONS CONTINUOUS ® PERIODIC ❑ FROM AN ACCEPTED ACCREDITATION AGENCY(HA ICE-ES). SIZE,LENGTH,AND LOCATION OF WELDS PERFORM ® OBSERVE ❑ <br /> 4. THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK FOR COMPLIANCE WITH THE JURISDICTION APPROVED PLANS, <br /> SPECIFICATIONS,AND APPLICABLE PROVISIONS OF THE IBC.THE ARCHITECT/ENGINEER'S REVIEWED SHOP DRAWINGS, MATERIALS AND SYSTEMS REQUIRED TO BE ACCEPTANCE CRITERIA TO CONSIDER INCLUDES CRACK <br /> AND/OR PLACEMENT DRAWINGS,MAY BE USED ONLY AS AN AID TO SPECIAL INSPECTIONS.THE DEFINITIONS FOR INSTALLED IN ACCORDANCE WITH ADDITIONAL CONTINUOUS ® PERIODIC ❑ WELDS MEET VISUAL ACCEPTANCE CRITERIA PERFORM ® OBSERVE ❑ PROHIBITION,WELD/BASE-METAL FUSION,CRATER CROSS <br /> ACTIONS OR FREDUENCIES OF INSPECTIONS ARE AS FOLLOWS: <br /> MANUFACTURER'S INSTRUCTION THAT PRESCRIBE SECTION,WELD PROFILES AND SIZE,UNDERCUT,AND POROSITY. <br /> A. "CONTINUOUS",FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL REQUIREMENTS NOT CONTAINED IN THE IBC OR <br /> INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED. REFERENCED STANDARDS <br /> B. "PERIODIC",INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED ARC STRIKES PERFORM ® OBSERVE ❑ <br /> SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING PERFORMED AND AT THE <br /> COMPLETION OF THE WORK, WHEN WELDING OF DOUBLER PLATES,CONTINUITY PLATES OR <br /> C. "OBSERVE"THESE ITEMS ON A RANDOM BASIS(AISC).OPERATIONS NEED NOT BE DELAYED PENDING THESE STRUCTURAL STEEL (IBC 1705.2.1) K-AREA PERFORM ® OBSERVE I] STIFFENERS HAS BEEN PERFORMED IN THE K-AREA,VISUALLY <br /> INSPECTIONS. INSPECT THE WEB K-AREA FOR CRACKS WITHIN 3INCHES OF THE <br /> D. "PERFORM"THESE TASKS FOR EACH BOLTED CONNECTION,WELDED JOINT,OR MEMBER(AISC). WELD <br /> 5. THE SPECIAL INSPECTOR SHALL COMPLETE A DAILY REPORT FOR INSPECTIONS.THE DAILY REPORTS SHALL REMAIN AT STEEL SPECIAL INSPECTIONS OF RAILING SYSTEMS SHALL BE LIMITED TO WELDING INSPECTION OF WELDS AT THE BASE OF CANTILEVERED RAIL POSTS. <br /> THE JOB SITE WITH THE CONTRACTOR FOR THE BUILDING OFFICIAL'S INSPECTOR.THE REPORTS SHALL INCLUDE THE WELD ACCESS HOLES IN ROLLED HEAVY SHAPES AFTER ROLLED HEAVY SHAPES AND BUILT-UP HEAVY SHAPES ARE <br /> FOLLOWING. AND BUILT-UP HEAVY SHAPES PERFORM ® OBSERVE ❑ WELDED,VISUALLY INSPECT THE WELD ACCESS HOLE FOR <br /> A NAME OF B.DESCRIPTION OFTHE NSPECCTTIOND WTHLOCATIONSDATE THE TION AND WAS PERFORMED. WELDED CONNECTION-PRIOR TO WELDING (TABLE N5.4-1,AISC 360-16): CRACKS <br /> C.LIST OF NON-CONFORMING ITEMS. BACKING&WELD TABS REMOVED PERFORM ® OBSERVE ❑ <br /> D.HOW NON-CONFORMING ITEMS WERE RESOLVED OR UNRESOLVED. <br /> E.LIST OF CHANGES OR CORRECTIONS TO NON-CONFORMING ISSUES AUTHORIZED BY THE ENGINEER, ITEM INSPECTION ACTION INSTRUCTIONS <br /> ARCHITECT,OR BUILDING OFFICIAL'S INSPECTORS. REPAIR ACTIVITIES PERFORM ® OBSERVE ❑ <br /> 6. THE INSPECTOR SHALL BRING NON-CONFORMING ITEMS TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR,AND <br /> m„' NOTE ALL SUCH ITEMS IN THE DAILY REPORT.IF ANY ITEM IS NOT RESOLVED IN ATIMELY MANNER AND IS ABOUT TO BE VERIFY WELDER QUALIFICATION RECORDS PERFORM ❑ OBSERVE <br /> INCORPORATED IN THE WORK,THE SPECIAL INSPECTORS SHALL IMMEDIATELY NOTIFY THE ENGINEER OF RECORD. AND CONTINUITY RECORDS DOCUMENT ACCEPTANCE OR REJECTION OF <br /> WELDED JOINT/MEMBER PERFORM ® OBSERVE ❑ <br /> A Q 7. THE INSPECTION AGENCY SHALL FURNISH MONTHLY REPORTS OF THE TEST AND INSPECTIONS PERFORMED DIRECTLY VERIFY WELDING PROCEDURES(WPS) <br /> TO THE BUILDING OFFICIAL,ENGINEER OF RECORD,AND/OR OTHERS AS DESIGNATED. AVAILABLE PERFORM ® OBSERVE ❑ NO PROHIBITED WELDS HAVE BEEN ADDED <br /> F 8. THE INSPECTION AGENCY SHALL SUBMIT A FINAL SIGNED AND SEALED REPORT TO THE BUILDING OFFICIAL STATING WITHOUT THE APPROVAL OF THE FOR PERFORM ❑ OBSERVE <br /> o.m THAT ALL ITEMS REQUIRING SPECIAL INSPECTIONS AND TESTING WERE FULFILLED,ALL DISCREPANCIES WERE VERIFY CERTIFICATIONS FOR WELDING <br /> < CORRECTED OR RESOLVED,AND ALL WORK REQUIRING SPECIAL INSPECTIONS IS IN CONFORMANCE WITH THE PERFORM ® OBSERVE ❑ <br /> 0 APPROVED DESIGN DRAWINGS AND SPECIFICATIONS AND APPLICABLE CODES,ANY ITEMS UNRESOLVED OR CONSUMABLES AVAILABLE <br /> z DISCREPANCIES IN COVERAGE(I.E.MISSED INSPECTIONS,PERIODIC INSPECTIONS WHEN CONTINUOUS WAS <br /> NONDESTRUCTIVE TESTING(NDT)OF WELDED JOINTS (SECTION N5.5,AISC 360-16): <br /> 3 W REQUIRED,ETC)SHALL BE SPECIFICALLY ITEMIZED IN THE REPORT. MATERIAL IDENTIFICATION PERFORM ❑ OBSERVE ® VERIFY TYPE AND GRADE OF MATERIAL. <br /> j 3 9. SPECIAL INSPECTION AND TEST REQUIREMENTS FOR CERTAIN BUILDING ELEMENTS IMPLIED BYTHE STATEMENT OF ITEM INSPECTION ACTION INSTRUCTIONS <br /> SPECIAL INSPECTIONS YET LISTED AS EXEMPT BY IBC IS PERMITTED TO BE WAIVED WITH WRITTEN APPROVAL FROM <br /> N THE ENGINEER OF RECORD. WELDER IDENTIFICATION PERFORM ❑ OBSERVE ® WELDED A SYSTEMA JO SHALL OR MEMBER CAN BE BE MAINTAINED BY HICH F EDLDER WHO HAS <br /> INTREQUIREMENTS FOR WIND RESISTANCE:10. ENT COMPLETE-JOINT-PENETRATION(CJP)GROOVE ULTRASONIC TESTING SHALL BE PERFORMED ON 100%OF CJP <br /> o STATEMENT OF SPECIAL INSPECTION FOR WIND RESISTANCE IS NOT REQUIRED.(REQUIRED IN WIND EXPOSURE WELDS IN MATERIALS 5116-INCH THICK OR GREATER PERFORM ❑ OBSERVE ® GROOVE WELDS SUBJECT TO TRANSVERSELY APPLIED TENSION <br /> ry VERIFY JOINT PREPARATION,DIMENSIONS,CLEANLINESS, LOADING IN BUTT,TEE,AND CORNER JOINTS FOR STRUCTURES IN <br /> a CATEGORY B,WHERE THE NOMINAL DESIGN WIND SPEED,Vasd IS 150 MPH OR GREATER.REQUIRED IN WIND FIT-UP GROOVE WELDS PERFORM ❑ OBSERVE ® TACKING,AND BACKING TYPE AND FIT. <br /> EXPOSURE CATEGORY C OR D,WHERE THE NOMINAL DESIGN WIND SPEED,Vasd IS 140 MPH OR GREATER.) RISK CATEGORY III OR IV,10%IN RISK CATEGORY II,AND 0%IN <br /> RISK CATEGORY I.TESTING RATE MUST BE INCREASED PER <br /> 11, EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR FABRICATION OF A SYSTEM OR COMPONENT FIT-UP CJP GROOVE WELDS OF ASS T-,Y-,AND VERIFY JOINT PREPARATION,ALIGNMENT,GAPS AT ROOT, SECTION N5.5f IF 5%OR MORE WELDS TESTED HAVE <br /> DESCRIBED ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER K-JOINTS WITHOUT BACKING PERFORM ❑ OBSERVE ® CLEANLINESS,TACK QUALITY AND LOCATION. UNACCEPTABLE DEFECTS.THE RATE IS PERMITTED TO BE <br /> OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT IN REDUCED PER SECTION N5.5e. <br /> ACCORDANCE WITH IBC 1704.4.REQUIREMENTS FOR SEISMIC RESISTANCE: <br /> ACCESS HOLES PERFORM ❑ OBSERVE ® VERIFY CONFIGURATION AND FINISH. WELDED JOINTS SUBJECT TO FATIGUE PERFORM ® OBSERVE ❑ PER AISC W li3,SECTION N5.5c. <br /> STATEMENT OF SPECIAL INSPECTION FOR SEISMIC RESISTANCE IS NOT REQUIRED. <br /> EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OR FABRICATION OF A SYSTEM OR COMPONENT FIT-UP OF FILLET WELDS PERFORM ❑ OBSERVE ® VERIFY ALIGNMENT,GAPS AT ROOT,CLEANLINESS OF STEEL <br /> DESCRIBED ABOVE SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND OWNER SURFACES,AND TACK WELD QUALITY AND LOCATION. <br /> OR THE OWNER'S AUTHORIZED AGENT PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT IN <br /> ACCORDANCE WITH IBC 1704.4. CHECK WELDING EQUIPMENT PERFORM ❑ OBSERVE ❑ <br /> 2 THIS STATEMENT OF SPECIAL INSPECTION HAS BEEN PREPARED BY THE ENGINEER OF RECORD WITH THE <br /> UNDERSTANDING THAT THE BUILDING OFFICIAL WILL: WELDED CONNECTION DURING WELDING (TABLE N5.4-2,AISC 360-16): <br /> A. REVIEW AND APPROVE THE QUALIFICATIONS OF THE SPECIAL INSPECTORS WHO WILL PERFORM <br /> THE INSPECTIONS. <br /> B. MONITOR SPECIAL INSPECTION ACTIVITIES ON THE JOB SITE TO ASSURE THAT THE SPECIAL ITEM INSPECTION ACTION INSTRUCTIONS <br /> INSPECTORS ARE QUALIFIED AND PERFORMING THEIR DUTIES AS CALLED FOR IN THE STATEMENT <br /> OF SPECIAL INSPECTION. <br /> C. REVIEW SUBMITTED INSPECTION REPORTS. CONTROL AND HANDLING OF WELDING <br /> D. PERFORM INSPECTIONS AS REQUIRED BY THE LOCAL BUILDING CODE. CONSUMABLES PERFORM ❑ OBSERVE ® VERIFY PACKAGING AND EXPOSURE CONTROL. <br /> E. ISSUE CERTIFICATION OF OCCUPANCY AFTER ALL SPECIAL INSPECTION REPORTS AND THE FINAL <br /> SPECIAL INSPECTION REPORT HAVE BEEN SUBMITTED AND ACCEPTED. VERIFY THAT WELDING DOES NOT OCCUR OVER CRACKED TACK <br /> CRACKED TACK WELDS PERFORM ❑ OBSERVE ® WELDS. <br /> ENVIRONMENTAL CONDITIONS PERFORM ❑ OBSERVE ® VERIFY WIND SPEED IS WITHIN LIMITS AS WELL AS <br /> PRECIPITATION AND TEMPERATURE. <br /> WPS FOLLOWED PERFORM ❑ OBSERVE ® VERIFY ITEMS SUCH AS SETTINGS ON WELDING EQUIPMENT, <br /> TRAVEL SPEED,WELDING MATERIALS,SHIELDING GAS <br /> TYPEIFLOW RATE,PREHEAT APPLIED,INTERPASS <br /> TEMPERATURE MAINTAINED,AND PROPER POSITION. <br /> WELDING TECHNIQUES PERFORM ❑ OBSERVE PROFILE LIMITATIONS,AND QUALITY OF EACH PASS. <br /> ® VERIFY INTERPASS AND FINAL CLEANING,EACH PASS IS WITHIN <br /> PLACEMENT AND INSTALLATION OF STEEL PERFORM ® OBSERVE ❑ VERIFY SIZE,SPACING AND CORRECT INSTALLATION OF STUDS. <br /> HEADED STUD ANCHORS <br /> ■ BRPH <br /> —brph.com Copyright 02024 <br /> Architects Engineers,Inc. <br /> 1902033rd Ava W,Suite 500 State of Washington N <br /> Lynnwood,Washington,98036 Certificate of Authorization oo <br /> N A hitct <br /> 425-921 J500 rceure o.603235512 <br /> Engineering No.3137 04 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN SUBTITLE CURRENT REVISION SYMBOL DATE <br /> �yLEES1 ACCEPTABILITY KKB 10.09.24 w <br /> 4` Y WASk y�� THIS DESIGN AND/OR CHECKED STATEMENT OF SPECIAL INSPECTIONS 10.09.24 N <br /> K40-021 Al-A3 FREEZE RECOVERY REBUILD-IFP C259244 KKB BLS 10.09.24 0 S ECFCATION S APPROVED CMA 10.09.24 SHEET p, <br /> BOE/NG® ENGINEER RE S 2 1CI <br /> APPROVED BY DEPT. DA E gLS 10.09.24 40-21 Al-A3 FREEZE RECOVERY REBUILD J-L 1�N/1 <br /> Approver BUILDING 40-021 L <br /> �Q 2 119011 Rw�� APPROVED JOB NO. C259244 COMP NO. Q <br /> RA L� tir <br /> srQxA e o APPROVED STRUCTURAL MASTER COL..9-3/A-B EVERETT WA DWG NO. 40-021S2b <br />