LEGEND/SYMBOLS MATERIAL SYMBOLS ABBREVIATIONS GENERAL NOTES
<br /> & AND IN INCH
<br /> ® AT INCL INCLUDED(D)(ING)
<br /> SECTION/DETAIL DESIGNATION AB ANCHOR BOLT 1. OBTAIN&POST REQUIRED CONSTRUCTION PERMITS FROM THE CITY OF EVERETT PRIOR TO
<br /> EARTH,DIRT,COMPACTED ACP ACOUSTICAL CEILING PANEL JT JOINT COMMENCING CONSTRUCTION.
<br /> BUILDING,WALL SECTIONS ACT ACOUSTICAL CEILING TILE K KIP(S) 2. VERIFY ALL EXISTING CONDRIONS AND NOTIFY THE BOEING PROJECT CONSTRUCTION MANAGER
<br /> X X III AND DETAIL REFERENCES o8 STONE,GRAVEL,POROUS FILL ADJ ADJACENT KO KNOCK OUT SHOULD CONDITIONS DIFFER FROM DESIGN DOCUMENTS.
<br /> AFF ABOVE FINISHED FLOOR
<br /> SHEET NUMBER WHERE DETAILED AGG AGGREGATE L LENGTH 3. THE SCOPE OF WORK INCLUDES ALL WORK WITHIN THE CURRENT REVISION CLOUD(S ON EACH
<br /> ® BRICK,COMMON AL ALUMINUM LB LAG BOLT SHEET.IF THERE IS NO CLOUD ON A SHEET THE ENTIRE SHEET IS IN THE SCOPE OF WORK.
<br /> SHEET NUMBER REFERENCED FROM ALT ALTERNATE LIX LENGTH INFORMATION OR WORK(WHETHER CLOUDED OR NOT)REFERRED TO FROM WITHIN A CLOUD IS
<br /> LF LINEAL FEET INCLUDED IN THE SCOPE OF WORK(I.E.-A SECTION OR DETAIL SYMBOL THAT LIES WITHIN A
<br /> ALUM ALUMINUM CLOUD ON A PLAN VIEW SHEET IS INCLUDED IN THE SCOPE EVEN WHEN THE ACTUAL SECTION OR
<br /> INTERIOR ELEVATION REFERENCE ® CERAMIC TILE ANCH ANCHOR,ANCHORAGE LL LIVE LOAD DETAIL DRAWN ON THE DETAIL SHEET IS NOT CLOUDED.)
<br /> APA AMERICAN PLYWOOD ASSOC. LWR LOWER
<br /> APPD APPROVED 4. KEEP ALL AREAS UNDER CONSTRUCTION CLEAR OF DEBRIS CAUSED BY THIS SCOPE OF WORK.
<br /> #X X# CONCRETE APPROX APPROXIMATE MAR MATERIAL STORE CONSTRUCTION MATERIALS AND EQUIPMENT IN AREA DESIGNATED BY THE BOEING PROJECT
<br /> ASTM AMERICAN SOCIETY OF MAX MAXIMUM CONSTRUCTION MANAGER.
<br /> SHEET NUMBER WHERE DETAILED TESTING MATERIALS MB MACHINE BOLT
<br /> INSULATION:BATi,LOOSE FILL,BLANKET MBR MEMBER 5. VERIFY DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AND ENSURE THAT THE JOINING
<br /> SHEET NUMBER REFERENCED FROM BTWN BETWEEN MTL METAL OF THE WORK OF VARIOUS TRADES MEETS APPROPRIATELY. BRING DISCREPANCIES ON THE
<br /> EARTH,DIRT,UNDISTURBED DRAWINGS OR IN SPECIFICATIONS TO THE ATTENTION OF THE BOEING PROJECT CONSTRUCTION
<br /> BLDG BUILDING MFR MANUFACTURE(R) MANAGER IMMEDIATELY UPON DISCOVERY. THE CONTRACTOR SHALL ADVISE BOEING,SUMMARIZE
<br /> INSULATION:RIGID MIN MINIMUM THE SITUATION AND PROVIDE RECOMMENDATIONS TO RESOLVING POTENTIAL CONFLICTS PRIOR TO
<br /> /^� T \I BLKG BLOCKING
<br /> `— iREFERENCE TO DEFAIL/ENLARGED PLAN
<br /> �X X� I j BO BOTTOM OF MISC MISCELLANEOUS SUBMITTING ANY REQUESTS FOR INFORMATION(RFls).
<br /> --- ® ALUMINUM BOT BOTTOM MO MASONRY OPENING MT MOUNTED)(ING) 6. CONFORM ALL WORK TO APPLICABLE CODES,REGULATIONS AND INDUSTRY STANDARDS.
<br /> �XDE-wl.DESIGNATION C CHANNEL MTL METAL 7. COMPLY WITH THE BOEING PROJECT CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND
<br /> BRASS,BRONZE,COPPER CB CATCH BASIN SECURITY REGULATIONS.
<br /> CC CENTER TO CENTER N NORTH(COORDINATE)
<br /> SHEET NUMBER WHERE DETAILED
<br /> SHEET
<br /> SOME AS SHEET REFERENCED FROM) CEM CEMENT NF NEAR FACE B. PROVIDE,
<br /> AS IF DRAWN IN FULL,REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE
<br /> ® METAL,STEEL,IRON CF CUBIC FEET NIC NOT IN CONTRACT
<br /> CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED NO. NUMBER 9. DIMENSIONS ON DRAWINGS ARE TAKEN TO THE FACE OF MASONRY AND/OR CONCRETE WALLS,
<br /> X SECTION/DETAIL DESIGNATION _ CG CORNER GUARD NOM NOMINAL /
<br /> PIASTER:SAND,CEMENT,GROUT CJ CONTROL JOINT
<br /> METAL STUDS,AND TO THE CENTERLINE OF COLUMNS,UNLESS OTHERWISE NOTED.
<br /> XXXXX XXXXX- SHEET NUMBER WHERE DETAILED CL CENTER LINE TUTS NOT TO SCALE 10. DOOR OPENINGS ARE 6"FROM ADJACENT WALLS OR CENTERED IN ROOM WALL,UNLESS
<br /> CLG CEILING OA OVERALL DIMENSIONED OTHERWISE.
<br /> ® PLASTER:GYPSUM WALL BOARD CLR CLEAR(ANCE) O/C ON CENTER
<br /> SHEET NUMBER REFERENCED FROM COL COLUMN OD OUTSIDE DIAMETER 11. PARTITIONS SHALL RUN FULL HEIGHT,FROM FLOOR TO FLOOR ABOVE UNLESS SHOWN OR NOTED
<br /> WOOD:FINISH COMP COMPRESS(ED)(ION) OF OUTSIDE FACE
<br /> OTHERWISE.
<br /> NORTH ARROW CONC CONCRETE OFCI OWNER FURNISHED CONTRACTOR INSTALLED 12. PLANS WHICH APPEAR AS'BACKGROUNDS"ON CIVIL,STRUCTURAL,PLUMBING,HVAC,ELECTRICAL
<br /> N L
<br /> CONN CONNECTION OF01 OWNER FURNISHED OWNER INSTALLED DRAWINGS ETC.,ARE FOR THE PURPOSE ONLY OF ILLUSTRATING GENERAL PLAN CONFIGURATION.
<br /> ® WOOD:ROUGH CONTINUOUS CONST CONSTRUCTION OPG OPENING SUCH BACKGROUNDS SHALL NOT BE USED FOR PORTIONS OF THE WORK OTHER THAN THAT
<br /> J1 ELEVATION DATUM
<br /> CONT CONTINUOUS,CONTINUE OPP OPPOSITE,OPPOSITE HAND PERTAINING TO THE TITLE OF EACH SHEET. REFER TO THE APPROPRIATE SHEET FOR EACH
<br /> CONTR CONTRACT(OR) PAR PARALLEL SPECIFIC PORTION OF THE WORK.
<br /> OR SPOT ELEVATION � WOOD:INTERRUPTED BLOCKING CT CERAMIC TILE
<br /> CTSK COUNTERSUNK PCC PRECAST CONCRETE 13. COORDINATE THE WORK OF ALL TRADES. REFER TO ARCHITECTURAL,STRUCTURAL,MECHANICAL
<br /> CEILING HEIGHT A.F.F. PCF POUNDS PER CUBIC FOOT AND ELECTRICAL DRAWINGS IN DETAIL FOR COORDINATION OF SPECIFIC TRADE REQUIREMENTS.
<br /> CY CUBIC YARD(S) PERF PERFORATE(D) COORDINATE ALL ROUGH-IN REQUIREMENTS FOR EQUIPMENT FURNISHED BY CONTRACTOR OR BY
<br /> XXXXXX ROOM NAME 0,DIA DIAMETER PERIM PERIMETER
<br /> ® PLYWOOD:SMALL SCALE OTHERS FOR THIS PROJECT.
<br /> XXXX ROOM NUMBER DEL DOUBLE PG PATTERN GLASS 14. PROVIDE MANUFACTURERS INSTALLATION INSTRUCTIONS TO THE BOEING PROJECT CONSTRUCTION
<br /> DEMOL DEMOLISH,DEMOLITION PL PLATE MANAGER WHENEVER SUCH INSTRUCTIONS ARE REFERENCED IN THE CONSTRUCTION NOTES.
<br /> PLYWOOD:LARGE SCALE DEP DEPRESSED PLAM PLASTIC LAMINATE
<br /> XXXXX DOOR NUMBER CIA DIAMETER PLYWD PLYWOOD 15. CONTRACTOR SHALL COORDINATE WITH THE BOEING PROJECT CONSTRUCTION MANAGER FOR
<br /> DIAG DIAGONAL PNL PANEL STAGING AREAS WHERE CONTRACTOR MAY STORE SALVAGED MATERIALS TO BE REUSED IN LATER
<br /> ® WALL TYPE:CONCRETE MASONRY(CMU) DIM DIMENSION PREST PRESTRESS(ED) PARTS OF THIS PROJECT AND WHERE MATERIALS TO BE STAGED BY BOEING ARE TO BE LOCATED.
<br /> -- GRID/GRID BUBBLE AND DL DEAD LOAD PRF PREFORMED 16. SYMBOLS SHOWN ON MATERIALS LIST ARE NOT ALWAYS USED IN DRAWINGS. VERIFY EXISTING
<br /> CENTERLINE DN DOWN PSF POUNDS PER SQUARE FOOT MATERIAL AND SEE CONSTRUCTION NOTES FOR MATERIAL CALLOUTS.
<br /> '- ITEMS TO BE REMOVED ® WALL TYPE:STEEL STUD DS DOWNSPOUT PSI POUNDS PER SQUARE INCH 17. WHERE EXISTING WORK IS DAMAGED,CUT OR DEFACED AS A RESULT OF DEMOLITION OR
<br /> DWG DRAWING PT POINT,PAINT PERFORMANCE OF NEW WORK,THE CONTRACTOR IS TO PATCH AND REPAIR THE EXISTING TO
<br /> CONSTRUCTION"FLAG"NOTE FOR SPECIFIC PVC POLYVINYL CHLORIDE MATCH ADJOINING SURFACES. REPAIRED FINISHES SHALL BE EXTENDED TO THE NEAREST VISUAL
<br /> CONSTRUCTION DIRECTIVE ® WALL TYPE WOOD STUD E EAST(COORDINATE) BREAK LINES SUCH AS CORNERS,CEILING LINES,TOP OF BASE,CHANGE IN MATERIAL OR SIMILAR.
<br /> EA EACH R RADIUS(CURVATURE)
<br /> GENERAL"BOAT"NOTE FOR EB EXPANSION BOLT R RISER 18. ALL RECESSES LOCATED WITHIN FIRE RATED PARTITIONS SHALL BE CONSTRUCTED TO MAINTAIN
<br /> SPECIFIC OR EXISTING HISTORICAL EF EACH FACE RB RESILIENT BASE
<br /> REQUIRED FIRE RATING OF THE PARTITION.
<br /> INFORMATION. 0 WALL TYPE:EXISTING EJ EXPANSION JOINT RCP REFLECTED CEILING PLAN 19. ARCHITECTURAL REFLECTED COILING PLANS INDICATE THE FINAL LOCATIONS OF MECHANICAL AND
<br /> O WINDOW FRAME TYPE EL ELEVATION REF REFERENCE,REFER TO ELECTRICAL COMPONENTS. SEE THE REFLECTED CEILING PLANS FOR LOCATIONS OF ITEMS IN THE
<br /> ELEV ELEVATION REINF REINFORCE(D)(ING) CEILING;SEE DISCIPLINE SHEETS FOR ALL INFORMATION ABOUT THE MECHANICAL AND ELECTRICAL
<br /> WALL TYPE REMOVAL EQ EQUAL REQ REQUIRE(D)(ING) COMPONENTS INDICATED ON ARCHITECTURAL REFLECTED CEILING PLANS.
<br /> EW EACH WAY REV REVERSE,REVISION(S),REVISED 20. PROVIDE CLOSURE,MEETING THE REQUIREMENTS OF GOVERNING FIRE AUTHORITIES,BETWEEN ALL
<br /> X PARTFTION/WALL TYPE '�� WALL TYPE:PARTITION(7'-0' EX EXISTING RH RIGHT HAND
<br /> HIGH) EXP EXPOSED RO ROUGH OPENING FIRE RATED FLOORS,SHAFTS AND BUILDING PARTITIONS AND ALL PENETRATING DUCTS,PIPES,
<br /> CONDUIT,MECHANICAL,ELECTRICAL,AND OTHER ITEMS.
<br /> EXT EXTERIOR
<br /> S SOUTH(COORDINATE) 21. THE CONTRACTOR IS RESPONSIBLE FOR RENEW OF THE STRUCTURAL,MECHANICAL AND
<br /> END WALL GUARD WALL TYPE:GLASS FAS FASTEN(ER) SECT SECTION ELECTRICAL DRAWINGS FOR CUTTING AND PATCHING WORK WITHIN THE BUILDING,BEYOND THE
<br /> RE FIRE EXTINGUISHER SF SQUARE FEET LIMITS OF THE ARCHITECTURAL DRAWINGS.
<br /> CORNER GUARD FEC FIRE EXTINGUISHER CABINET SHT SHEET 22. AT METAL STUD PARTITIONS,STUDS ARE TO EXTEND FROM FLOOR TO FLOOR U.N.O..WHERE THEY
<br /> FF FINISHED CEILING SIM SIMILAR CANNOT DO SO,DUE TO INTERFERENCE WITH NEW OR EXISTING DUCTS,PIPING,ETC.,PROVIDE
<br /> FF FACTORY FINISH SQ SQUARE BRACING TO STRUCTURE ABOVE TO PROVIDE FOR EQUIVALENT SUPPORT OF PARTITION;SUBMIT
<br /> CPT-1 FINISH DESIGNATION FF FINISHED FLOOR SS SOLID SURFACING EQUIVALENT SUPPORT METHOD TO ARCHITECT FOR REVIEW. ALL FIRE RATED PARTITIONS SHALL BE
<br /> FGR FINISH GRADE SST STAINLESS STEEL CONSTRUCTED TO MAINTAIN THEIR RATING FROM FLOOR TO UNDERSIDE OF STRUCTURE ABOVE,
<br /> REVISION CLOUD WITH FH FIRE HYDRANT ST STRUCTURAL TEE U.N.O.
<br /> FINFlNISH(ED) STD STANDARD 23. PROVIDE ACCESS DOORS AS INDICATED OR AS NECESSARY AND VERIFY WITH MECHANICAL AND
<br /> TENSION LETTER'BEAK" FND FOUNDATION STL STEEL ELECTRICAL SUBCONTRACTORS EXACT LOCATIONS OF ACCESS REQUIRED BY THEIR WORK.ACCESS
<br /> FOC FACE OF CONCRETE STIR STRUCTURAL MUST BE PROVIDED FOR ALL CONCEALED VALVES,DAMPER CONTROLS,FIRE DAMPER LINKAGES,
<br /> A FOF FACE OF FINISH SYM SYMMETRY,SYMMETRICAL CONCEALED JUNCTION BOXES,AND ELECTRICAL DEVICES OR ACCESSORIES.LOCATIONS AND SIZES
<br /> FOIC FURNISHED BY OWNER/ SYS SYSTEM OF EXPOSED ACCESS DOORS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW PRIOR TO
<br /> VCT CPT INSTALLED BY CONTRACTOR
<br /> T TEMPERED GLASS INSTALLATION OF THE MECHANICAL AND ELECTRICAL EQUIPMENT,
<br /> FLOOR MAT'L TRANSITION F010 FURNISHED BY OWNER/ T&B TOP AND BOTTOM 24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN ACCORDANCE
<br /> FO FINISHED OPENING
<br /> INSTALLED BY OWNER T TONGUE AND GROOVE
<br /> TEMMP TEMPORARY WITH ALL SAFETY CODES,REGUALTIONS AND BOEING REQUIREMENTS.
<br /> FEC) FIRE EXTINGUISHER THK THICKNESS) 25. THE CONTRACTOR SHALL RETAIN A FIRE PROTECTION ENGINEER LICENSED IN THE STATE OF
<br /> FRO FOR REFERENCE ONLY TOC TOP OF CURB WASHINGTON TO DETERMINE DESIGN THE MODIFIED FIRE SPRINKLER SYSTEM LAYOUT WITHIN THE
<br /> FEC FIRE EXTINGUISHER&CABINET FT FOOT TOC TOP OF CONCRETE AREA OF WORK.SAID ENGINEER SHALL STAMP,SEAL AND CERTIFY THAT HIS/HER DESIGN IS IN
<br /> FrG FOOTING TOL TOLERANCE COMPLIANCE W ALL APPLICABLE CODES AND REGULATIONS.CONTRACTOR SHALL COORDINATE ALL
<br /> O SUPPLY AIR DIFFUSER FLAT FUTURE /
<br /> TOS TOP OF STEEL NECESSARY MODIFICATIONS AS A RESULT OF SAID ENGINEER'S DESIGN.
<br /> RETURN AIR GRILLE FV FIELD VERIFY TS STRUCTURAL TUBE
<br /> GA GAGE TYP TYPICAL 26. THE CONTRACTOR SHALL INSURE THAT THE ELEVATOR CAR,EQUIPMENT ROOM,EQUIPMENT LAYOUT
<br /> FLOURESCENT LIGHT FIXTURE(PENDANT MOUNTED) CRFG GLASS FIBER REINFORCED GYPSUM AND HYDRAULIC/ELECTRICAL ROUTING FULLY MEETS STATE OF WASHINGTON CODES AND
<br /> GALV GALVANIZED UBC UNIFORM BUILDING CODE COMPLIANCE.FULLY COORDINATE WITH ARCHITECT PRIOR TO FABRICATION AND INSTALLATION.
<br /> ® FLOURESCENT LIGHT FIXTURE(PENDANT MOUNTED) GC GENERAL CONTRACTOR UL UNDERWRITERS'LABEL 27. AT LOCATIONS WHERE STRUCTURE,PIPING,DUCTWORK,CABLETRAY,OR CONDUIT PENETRATES
<br /> f� FLOURESCENT LIGHT FIXTURE ON EMERGENCY GI GALVANIZED IRON UNO UNLESS NOTED OTHERWISE WALLS AND ARE EXPOSED TO VIEW,CONTRACTOR SHALL COPE AS CLOSELY AS POSSIBLE TO THE
<br /> NIGHT LIGHT(NL)CIRCUIT OR GRADE UPR UPPER MEMBER AND INSTALL CONTINUOUS CAULKING AROUND MEMBER AND PAINT OR PROVIDE
<br /> O RECESSED OR PENDANT LIGHTING FIXTURE GT GROUT ESCUTCHEONS MATCHING WALL COLOR AT PENETRATIONS.
<br /> GWB GYPSUM WALL BOARD VB VAPOR BARRIER 28. FOR CONSISTENCY ALL CONSTRUCTION NOTES("FLAG NOTES?FOR EACH GROUP: PLAN AND
<br /> RECESSED OR PENDANT LIGHTING FIXTURE HDNR HARDENER VC VINYL COMP.TILE RCP'S,ARE SHOWN IN THEIR ENTIRETY. ALL CONSTRUCTION NOTES MAY NOT BE REFERENCED ON
<br /> DLR Group HDWD HARDWOOD VERT VERTICAL EVERY SHEET.
<br /> NIGHT LIGHT
<br /> LIGHT FIXTURE ON EMERGENCY —hi—,Bgim mg Pla"";"s Ima;«, HDWR HARDWARE VIF VERIFY IN FIELD
<br /> NIGHT LIGHT 1 CIRCUIT HG HIGH GRADE W WEST(COORDINATE) 29, FRAME TYPES ARE TYPICALLY DRAWN LOOKING FROM THE OUTSIDE OR CORRIDOR SIDE UNO.
<br /> Tin WALL SCONCE 1 HM HOLLOW METAL W WIDE FLANGE
<br /> _a WALL SCONCE 2 HORZ HORIZONTAL W WIDTH,WIDE
<br /> EXIT SIGN(CEILING UNIT) 90% ISSUE F 0 R PERMIT HS HIGH STRENGTH WC WATER CLOSET
<br /> -® EXIT SIGN(WALL MOUNT) NT HEIGHT WD W000
<br /> W/ WITH
<br /> 07.08.24 IBC INTERNATIONAL BLDG.CODE W/O WITHOUT
<br /> ID INSIDE DIAMETER WWF WELDED WIRE FABRIC
<br /> ID INSIDE DIMENSION NOTE:REFER TO THE COLOR AND MATERIAL
<br /> SCHEDULE FOR ADDITIONAL FINISH AND o
<br /> IF INSIDE FACE DESIGNATIONS ABBREVIATIONS Y
<br /> SYM TENSION BY APPROVED DATE SYM REVISION BY APPROVED DATE DATE 31a a THIS DESIGN AND/OR BLEGEND,MATERIALS,ABBREVIATIONS&GEN L NOTES TITUE CURRENTW9523007 SYMBOLO R I 07.08.24 s
<br /> ACCEPTABILITY LD 05.11.24 K
<br /> ORIG GRIND SHOP CTSC W9523007 DLR GROUP ECA 07.08.24 REGISTERED w
<br /> ARCyITEC SPECIFICATION IS APPROVED ECA 05.17.24 SHE M
<br /> APPROVED BY I DEPT. I DATE "LE GRIND SHOP CTSC G2
<br /> y JOB N0.
<br /> BUILDING 40-031
<br /> STATE OF WASHINGT°N COMP NO.
<br /> —NUVLU ARCHITECTURAL MASTED EVERETf, WA DWG NO. 40-031-G2
<br />
|