Laserfiche WebLink
LEGEND/SYMBOLS MATERIAL SYMBOLS ABBREVIATIONS GENERAL NOTES <br /> & AND IN INCH <br /> ® AT INCL INCLUDED(D)(ING) <br /> SECTION/DETAIL DESIGNATION AB ANCHOR BOLT 1. OBTAIN&POST REQUIRED CONSTRUCTION PERMITS FROM THE CITY OF EVERETT PRIOR TO <br /> EARTH,DIRT,COMPACTED ACP ACOUSTICAL CEILING PANEL JT JOINT COMMENCING CONSTRUCTION. <br /> BUILDING,WALL SECTIONS ACT ACOUSTICAL CEILING TILE K KIP(S) 2. VERIFY ALL EXISTING CONDRIONS AND NOTIFY THE BOEING PROJECT CONSTRUCTION MANAGER <br /> X X III AND DETAIL REFERENCES o8 STONE,GRAVEL,POROUS FILL ADJ ADJACENT KO KNOCK OUT SHOULD CONDITIONS DIFFER FROM DESIGN DOCUMENTS. <br /> AFF ABOVE FINISHED FLOOR <br /> SHEET NUMBER WHERE DETAILED AGG AGGREGATE L LENGTH 3. THE SCOPE OF WORK INCLUDES ALL WORK WITHIN THE CURRENT REVISION CLOUD(S ON EACH <br /> ® BRICK,COMMON AL ALUMINUM LB LAG BOLT SHEET.IF THERE IS NO CLOUD ON A SHEET THE ENTIRE SHEET IS IN THE SCOPE OF WORK. <br /> SHEET NUMBER REFERENCED FROM ALT ALTERNATE LIX LENGTH INFORMATION OR WORK(WHETHER CLOUDED OR NOT)REFERRED TO FROM WITHIN A CLOUD IS <br /> LF LINEAL FEET INCLUDED IN THE SCOPE OF WORK(I.E.-A SECTION OR DETAIL SYMBOL THAT LIES WITHIN A <br /> ALUM ALUMINUM CLOUD ON A PLAN VIEW SHEET IS INCLUDED IN THE SCOPE EVEN WHEN THE ACTUAL SECTION OR <br /> INTERIOR ELEVATION REFERENCE ® CERAMIC TILE ANCH ANCHOR,ANCHORAGE LL LIVE LOAD DETAIL DRAWN ON THE DETAIL SHEET IS NOT CLOUDED.) <br /> APA AMERICAN PLYWOOD ASSOC. LWR LOWER <br /> APPD APPROVED 4. KEEP ALL AREAS UNDER CONSTRUCTION CLEAR OF DEBRIS CAUSED BY THIS SCOPE OF WORK. <br /> #X X# CONCRETE APPROX APPROXIMATE MAR MATERIAL STORE CONSTRUCTION MATERIALS AND EQUIPMENT IN AREA DESIGNATED BY THE BOEING PROJECT <br /> ASTM AMERICAN SOCIETY OF MAX MAXIMUM CONSTRUCTION MANAGER. <br /> SHEET NUMBER WHERE DETAILED TESTING MATERIALS MB MACHINE BOLT <br /> INSULATION:BATi,LOOSE FILL,BLANKET MBR MEMBER 5. VERIFY DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AND ENSURE THAT THE JOINING <br /> SHEET NUMBER REFERENCED FROM BTWN BETWEEN MTL METAL OF THE WORK OF VARIOUS TRADES MEETS APPROPRIATELY. BRING DISCREPANCIES ON THE <br /> EARTH,DIRT,UNDISTURBED DRAWINGS OR IN SPECIFICATIONS TO THE ATTENTION OF THE BOEING PROJECT CONSTRUCTION <br /> BLDG BUILDING MFR MANUFACTURE(R) MANAGER IMMEDIATELY UPON DISCOVERY. THE CONTRACTOR SHALL ADVISE BOEING,SUMMARIZE <br /> INSULATION:RIGID MIN MINIMUM THE SITUATION AND PROVIDE RECOMMENDATIONS TO RESOLVING POTENTIAL CONFLICTS PRIOR TO <br /> /^� T \I BLKG BLOCKING <br /> `— iREFERENCE TO DEFAIL/ENLARGED PLAN <br /> �X X� I j BO BOTTOM OF MISC MISCELLANEOUS SUBMITTING ANY REQUESTS FOR INFORMATION(RFls). <br /> --- ® ALUMINUM BOT BOTTOM MO MASONRY OPENING MT MOUNTED)(ING) 6. CONFORM ALL WORK TO APPLICABLE CODES,REGULATIONS AND INDUSTRY STANDARDS. <br /> �XDE-wl.DESIGNATION C CHANNEL MTL METAL 7. COMPLY WITH THE BOEING PROJECT CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND <br /> BRASS,BRONZE,COPPER CB CATCH BASIN SECURITY REGULATIONS. <br /> CC CENTER TO CENTER N NORTH(COORDINATE) <br /> SHEET NUMBER WHERE DETAILED <br /> SHEET <br /> SOME AS SHEET REFERENCED FROM) CEM CEMENT NF NEAR FACE B. PROVIDE, <br /> AS IF DRAWN IN FULL,REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE <br /> ® METAL,STEEL,IRON CF CUBIC FEET NIC NOT IN CONTRACT <br /> CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED NO. NUMBER 9. DIMENSIONS ON DRAWINGS ARE TAKEN TO THE FACE OF MASONRY AND/OR CONCRETE WALLS, <br /> X SECTION/DETAIL DESIGNATION _ CG CORNER GUARD NOM NOMINAL / <br /> PIASTER:SAND,CEMENT,GROUT CJ CONTROL JOINT <br /> METAL STUDS,AND TO THE CENTERLINE OF COLUMNS,UNLESS OTHERWISE NOTED. <br /> XXXXX XXXXX- SHEET NUMBER WHERE DETAILED CL CENTER LINE TUTS NOT TO SCALE 10. DOOR OPENINGS ARE 6"FROM ADJACENT WALLS OR CENTERED IN ROOM WALL,UNLESS <br /> CLG CEILING OA OVERALL DIMENSIONED OTHERWISE. <br /> ® PLASTER:GYPSUM WALL BOARD CLR CLEAR(ANCE) O/C ON CENTER <br /> SHEET NUMBER REFERENCED FROM COL COLUMN OD OUTSIDE DIAMETER 11. PARTITIONS SHALL RUN FULL HEIGHT,FROM FLOOR TO FLOOR ABOVE UNLESS SHOWN OR NOTED <br /> WOOD:FINISH COMP COMPRESS(ED)(ION) OF OUTSIDE FACE <br /> OTHERWISE. <br /> NORTH ARROW CONC CONCRETE OFCI OWNER FURNISHED CONTRACTOR INSTALLED 12. PLANS WHICH APPEAR AS'BACKGROUNDS"ON CIVIL,STRUCTURAL,PLUMBING,HVAC,ELECTRICAL <br /> N L <br /> CONN CONNECTION OF01 OWNER FURNISHED OWNER INSTALLED DRAWINGS ETC.,ARE FOR THE PURPOSE ONLY OF ILLUSTRATING GENERAL PLAN CONFIGURATION. <br /> ® WOOD:ROUGH CONTINUOUS CONST CONSTRUCTION OPG OPENING SUCH BACKGROUNDS SHALL NOT BE USED FOR PORTIONS OF THE WORK OTHER THAN THAT <br /> J1 ELEVATION DATUM <br /> CONT CONTINUOUS,CONTINUE OPP OPPOSITE,OPPOSITE HAND PERTAINING TO THE TITLE OF EACH SHEET. REFER TO THE APPROPRIATE SHEET FOR EACH <br /> CONTR CONTRACT(OR) PAR PARALLEL SPECIFIC PORTION OF THE WORK. <br /> OR SPOT ELEVATION � WOOD:INTERRUPTED BLOCKING CT CERAMIC TILE <br /> CTSK COUNTERSUNK PCC PRECAST CONCRETE 13. COORDINATE THE WORK OF ALL TRADES. REFER TO ARCHITECTURAL,STRUCTURAL,MECHANICAL <br /> CEILING HEIGHT A.F.F. PCF POUNDS PER CUBIC FOOT AND ELECTRICAL DRAWINGS IN DETAIL FOR COORDINATION OF SPECIFIC TRADE REQUIREMENTS. <br /> CY CUBIC YARD(S) PERF PERFORATE(D) COORDINATE ALL ROUGH-IN REQUIREMENTS FOR EQUIPMENT FURNISHED BY CONTRACTOR OR BY <br /> XXXXXX ROOM NAME 0,DIA DIAMETER PERIM PERIMETER <br /> ® PLYWOOD:SMALL SCALE OTHERS FOR THIS PROJECT. <br /> XXXX ROOM NUMBER DEL DOUBLE PG PATTERN GLASS 14. PROVIDE MANUFACTURERS INSTALLATION INSTRUCTIONS TO THE BOEING PROJECT CONSTRUCTION <br /> DEMOL DEMOLISH,DEMOLITION PL PLATE MANAGER WHENEVER SUCH INSTRUCTIONS ARE REFERENCED IN THE CONSTRUCTION NOTES. <br /> PLYWOOD:LARGE SCALE DEP DEPRESSED PLAM PLASTIC LAMINATE <br /> XXXXX DOOR NUMBER CIA DIAMETER PLYWD PLYWOOD 15. CONTRACTOR SHALL COORDINATE WITH THE BOEING PROJECT CONSTRUCTION MANAGER FOR <br /> DIAG DIAGONAL PNL PANEL STAGING AREAS WHERE CONTRACTOR MAY STORE SALVAGED MATERIALS TO BE REUSED IN LATER <br /> ® WALL TYPE:CONCRETE MASONRY(CMU) DIM DIMENSION PREST PRESTRESS(ED) PARTS OF THIS PROJECT AND WHERE MATERIALS TO BE STAGED BY BOEING ARE TO BE LOCATED. <br /> -- GRID/GRID BUBBLE AND DL DEAD LOAD PRF PREFORMED 16. SYMBOLS SHOWN ON MATERIALS LIST ARE NOT ALWAYS USED IN DRAWINGS. VERIFY EXISTING <br /> CENTERLINE DN DOWN PSF POUNDS PER SQUARE FOOT MATERIAL AND SEE CONSTRUCTION NOTES FOR MATERIAL CALLOUTS. <br /> '- ITEMS TO BE REMOVED ® WALL TYPE:STEEL STUD DS DOWNSPOUT PSI POUNDS PER SQUARE INCH 17. WHERE EXISTING WORK IS DAMAGED,CUT OR DEFACED AS A RESULT OF DEMOLITION OR <br /> DWG DRAWING PT POINT,PAINT PERFORMANCE OF NEW WORK,THE CONTRACTOR IS TO PATCH AND REPAIR THE EXISTING TO <br /> CONSTRUCTION"FLAG"NOTE FOR SPECIFIC PVC POLYVINYL CHLORIDE MATCH ADJOINING SURFACES. REPAIRED FINISHES SHALL BE EXTENDED TO THE NEAREST VISUAL <br /> CONSTRUCTION DIRECTIVE ® WALL TYPE WOOD STUD E EAST(COORDINATE) BREAK LINES SUCH AS CORNERS,CEILING LINES,TOP OF BASE,CHANGE IN MATERIAL OR SIMILAR. <br /> EA EACH R RADIUS(CURVATURE) <br /> GENERAL"BOAT"NOTE FOR EB EXPANSION BOLT R RISER 18. ALL RECESSES LOCATED WITHIN FIRE RATED PARTITIONS SHALL BE CONSTRUCTED TO MAINTAIN <br /> SPECIFIC OR EXISTING HISTORICAL EF EACH FACE RB RESILIENT BASE <br /> REQUIRED FIRE RATING OF THE PARTITION. <br /> INFORMATION. 0 WALL TYPE:EXISTING EJ EXPANSION JOINT RCP REFLECTED CEILING PLAN 19. ARCHITECTURAL REFLECTED COILING PLANS INDICATE THE FINAL LOCATIONS OF MECHANICAL AND <br /> O WINDOW FRAME TYPE EL ELEVATION REF REFERENCE,REFER TO ELECTRICAL COMPONENTS. SEE THE REFLECTED CEILING PLANS FOR LOCATIONS OF ITEMS IN THE <br /> ELEV ELEVATION REINF REINFORCE(D)(ING) CEILING;SEE DISCIPLINE SHEETS FOR ALL INFORMATION ABOUT THE MECHANICAL AND ELECTRICAL <br /> WALL TYPE REMOVAL EQ EQUAL REQ REQUIRE(D)(ING) COMPONENTS INDICATED ON ARCHITECTURAL REFLECTED CEILING PLANS. <br /> EW EACH WAY REV REVERSE,REVISION(S),REVISED 20. PROVIDE CLOSURE,MEETING THE REQUIREMENTS OF GOVERNING FIRE AUTHORITIES,BETWEEN ALL <br /> X PARTFTION/WALL TYPE '�� WALL TYPE:PARTITION(7'-0' EX EXISTING RH RIGHT HAND <br /> HIGH) EXP EXPOSED RO ROUGH OPENING FIRE RATED FLOORS,SHAFTS AND BUILDING PARTITIONS AND ALL PENETRATING DUCTS,PIPES, <br /> CONDUIT,MECHANICAL,ELECTRICAL,AND OTHER ITEMS. <br /> EXT EXTERIOR <br /> S SOUTH(COORDINATE) 21. THE CONTRACTOR IS RESPONSIBLE FOR RENEW OF THE STRUCTURAL,MECHANICAL AND <br /> END WALL GUARD WALL TYPE:GLASS FAS FASTEN(ER) SECT SECTION ELECTRICAL DRAWINGS FOR CUTTING AND PATCHING WORK WITHIN THE BUILDING,BEYOND THE <br /> RE FIRE EXTINGUISHER SF SQUARE FEET LIMITS OF THE ARCHITECTURAL DRAWINGS. <br /> CORNER GUARD FEC FIRE EXTINGUISHER CABINET SHT SHEET 22. AT METAL STUD PARTITIONS,STUDS ARE TO EXTEND FROM FLOOR TO FLOOR U.N.O..WHERE THEY <br /> FF FINISHED CEILING SIM SIMILAR CANNOT DO SO,DUE TO INTERFERENCE WITH NEW OR EXISTING DUCTS,PIPING,ETC.,PROVIDE <br /> FF FACTORY FINISH SQ SQUARE BRACING TO STRUCTURE ABOVE TO PROVIDE FOR EQUIVALENT SUPPORT OF PARTITION;SUBMIT <br /> CPT-1 FINISH DESIGNATION FF FINISHED FLOOR SS SOLID SURFACING EQUIVALENT SUPPORT METHOD TO ARCHITECT FOR REVIEW. ALL FIRE RATED PARTITIONS SHALL BE <br /> FGR FINISH GRADE SST STAINLESS STEEL CONSTRUCTED TO MAINTAIN THEIR RATING FROM FLOOR TO UNDERSIDE OF STRUCTURE ABOVE, <br /> REVISION CLOUD WITH FH FIRE HYDRANT ST STRUCTURAL TEE U.N.O. <br /> FINFlNISH(ED) STD STANDARD 23. PROVIDE ACCESS DOORS AS INDICATED OR AS NECESSARY AND VERIFY WITH MECHANICAL AND <br /> TENSION LETTER'BEAK" FND FOUNDATION STL STEEL ELECTRICAL SUBCONTRACTORS EXACT LOCATIONS OF ACCESS REQUIRED BY THEIR WORK.ACCESS <br /> FOC FACE OF CONCRETE STIR STRUCTURAL MUST BE PROVIDED FOR ALL CONCEALED VALVES,DAMPER CONTROLS,FIRE DAMPER LINKAGES, <br /> A FOF FACE OF FINISH SYM SYMMETRY,SYMMETRICAL CONCEALED JUNCTION BOXES,AND ELECTRICAL DEVICES OR ACCESSORIES.LOCATIONS AND SIZES <br /> FOIC FURNISHED BY OWNER/ SYS SYSTEM OF EXPOSED ACCESS DOORS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW PRIOR TO <br /> VCT CPT INSTALLED BY CONTRACTOR <br /> T TEMPERED GLASS INSTALLATION OF THE MECHANICAL AND ELECTRICAL EQUIPMENT, <br /> FLOOR MAT'L TRANSITION F010 FURNISHED BY OWNER/ T&B TOP AND BOTTOM 24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN ACCORDANCE <br /> FO FINISHED OPENING <br /> INSTALLED BY OWNER T TONGUE AND GROOVE <br /> TEMMP TEMPORARY WITH ALL SAFETY CODES,REGUALTIONS AND BOEING REQUIREMENTS. <br /> FEC) FIRE EXTINGUISHER THK THICKNESS) 25. THE CONTRACTOR SHALL RETAIN A FIRE PROTECTION ENGINEER LICENSED IN THE STATE OF <br /> FRO FOR REFERENCE ONLY TOC TOP OF CURB WASHINGTON TO DETERMINE DESIGN THE MODIFIED FIRE SPRINKLER SYSTEM LAYOUT WITHIN THE <br /> FEC FIRE EXTINGUISHER&CABINET FT FOOT TOC TOP OF CONCRETE AREA OF WORK.SAID ENGINEER SHALL STAMP,SEAL AND CERTIFY THAT HIS/HER DESIGN IS IN <br /> FrG FOOTING TOL TOLERANCE COMPLIANCE W ALL APPLICABLE CODES AND REGULATIONS.CONTRACTOR SHALL COORDINATE ALL <br /> O SUPPLY AIR DIFFUSER FLAT FUTURE / <br /> TOS TOP OF STEEL NECESSARY MODIFICATIONS AS A RESULT OF SAID ENGINEER'S DESIGN. <br /> RETURN AIR GRILLE FV FIELD VERIFY TS STRUCTURAL TUBE <br /> GA GAGE TYP TYPICAL 26. THE CONTRACTOR SHALL INSURE THAT THE ELEVATOR CAR,EQUIPMENT ROOM,EQUIPMENT LAYOUT <br /> FLOURESCENT LIGHT FIXTURE(PENDANT MOUNTED) CRFG GLASS FIBER REINFORCED GYPSUM AND HYDRAULIC/ELECTRICAL ROUTING FULLY MEETS STATE OF WASHINGTON CODES AND <br /> GALV GALVANIZED UBC UNIFORM BUILDING CODE COMPLIANCE.FULLY COORDINATE WITH ARCHITECT PRIOR TO FABRICATION AND INSTALLATION. <br /> ® FLOURESCENT LIGHT FIXTURE(PENDANT MOUNTED) GC GENERAL CONTRACTOR UL UNDERWRITERS'LABEL 27. AT LOCATIONS WHERE STRUCTURE,PIPING,DUCTWORK,CABLETRAY,OR CONDUIT PENETRATES <br /> f� FLOURESCENT LIGHT FIXTURE ON EMERGENCY GI GALVANIZED IRON UNO UNLESS NOTED OTHERWISE WALLS AND ARE EXPOSED TO VIEW,CONTRACTOR SHALL COPE AS CLOSELY AS POSSIBLE TO THE <br /> NIGHT LIGHT(NL)CIRCUIT OR GRADE UPR UPPER MEMBER AND INSTALL CONTINUOUS CAULKING AROUND MEMBER AND PAINT OR PROVIDE <br /> O RECESSED OR PENDANT LIGHTING FIXTURE GT GROUT ESCUTCHEONS MATCHING WALL COLOR AT PENETRATIONS. <br /> GWB GYPSUM WALL BOARD VB VAPOR BARRIER 28. FOR CONSISTENCY ALL CONSTRUCTION NOTES("FLAG NOTES?FOR EACH GROUP: PLAN AND <br /> RECESSED OR PENDANT LIGHTING FIXTURE HDNR HARDENER VC VINYL COMP.TILE RCP'S,ARE SHOWN IN THEIR ENTIRETY. ALL CONSTRUCTION NOTES MAY NOT BE REFERENCED ON <br /> DLR Group HDWD HARDWOOD VERT VERTICAL EVERY SHEET. <br /> NIGHT LIGHT <br /> LIGHT FIXTURE ON EMERGENCY —hi—,Bgim mg Pla"";"s Ima;«, HDWR HARDWARE VIF VERIFY IN FIELD <br /> NIGHT LIGHT 1 CIRCUIT HG HIGH GRADE W WEST(COORDINATE) 29, FRAME TYPES ARE TYPICALLY DRAWN LOOKING FROM THE OUTSIDE OR CORRIDOR SIDE UNO. <br /> Tin WALL SCONCE 1 HM HOLLOW METAL W WIDE FLANGE <br /> _a WALL SCONCE 2 HORZ HORIZONTAL W WIDTH,WIDE <br /> EXIT SIGN(CEILING UNIT) 90% ISSUE F 0 R PERMIT HS HIGH STRENGTH WC WATER CLOSET <br /> -® EXIT SIGN(WALL MOUNT) NT HEIGHT WD W000 <br /> W/ WITH <br /> 07.08.24 IBC INTERNATIONAL BLDG.CODE W/O WITHOUT <br /> ID INSIDE DIAMETER WWF WELDED WIRE FABRIC <br /> ID INSIDE DIMENSION NOTE:REFER TO THE COLOR AND MATERIAL <br /> SCHEDULE FOR ADDITIONAL FINISH AND o <br /> IF INSIDE FACE DESIGNATIONS ABBREVIATIONS Y <br /> SYM TENSION BY APPROVED DATE SYM REVISION BY APPROVED DATE DATE 31a a THIS DESIGN AND/OR BLEGEND,MATERIALS,ABBREVIATIONS&GEN L NOTES TITUE CURRENTW9523007 SYMBOLO R I 07.08.24 s <br /> ACCEPTABILITY LD 05.11.24 K <br /> ORIG GRIND SHOP CTSC W9523007 DLR GROUP ECA 07.08.24 REGISTERED w <br /> ARCyITEC SPECIFICATION IS APPROVED ECA 05.17.24 SHE M <br /> APPROVED BY I DEPT. I DATE "LE GRIND SHOP CTSC G2 <br /> y JOB N0. <br /> BUILDING 40-031 <br /> STATE OF WASHINGT°N COMP NO. <br /> —NUVLU ARCHITECTURAL MASTED EVERETf, WA DWG NO. 40-031-G2 <br />