Laserfiche WebLink
I I <br /> I I <br /> I I <br /> I I <br /> I I <br /> ------ KEY DEMOLITION N07E5 O <br /> = =DEMOLITION I. REMOVE EXISTIN6 WALL CONSTRUCTION INCLUDIN6 <br /> ( �I NEW WALL ALL DOORS, ELECTRICAL, APPURTENANCES <br /> v ------- CONSTRUCTION ~ <br /> 4 <br /> AND OTHER ITEMS ASSOCIATED WITH EXISTING <br /> j =EXI5TIN6 WALL5 WALL CONSTRUCTION. PATCH AND REPAIR EXI5TIN6 F- <br /> -NEW CABINETS WALL SURFACES WHERE EXI5TIN6 CONSTRUCTION <br /> ABOVE REMAINS. 0 <br /> ®BEARING WALL 2. PARTIAL REMOVAL OF WALL FOR NEW OPENING. SEE u- f <br /> STRUCTURAL DRAWIN65 FOR BEARIN6 WALL SUPPORT. m <br /> SPREAD FOOTIN6 5, REMOVE DOOR AND ITS ENTIRETY. p <br /> I <br /> 4. REMOVE /RELOCATE OR GAP PLUMBING AS o <br /> ----------- --- -------------- — ------- REQUIRED. SEE PHIS A2.1 FOR NEW PLUMBIN6 `y <br /> Lr- — — - LOCATIONS. (TYR) <br /> j _ 5. PARTIAL REMOVAL OF WALL. PATCH AND REPAIR AS <br /> r�------- --------------------�' 2 LJ N REQUIRED. <br /> I -1. 5AW GUT CONCRETE FOR PARTIAL REMOVAL OF c6 <br /> -I_ r--,--_---_r---------y=F---, CONCRETE SLAB FOR NEW FOOT I N65. REFERENCE o ,$ <br /> _J --_+��-- ----------- _ ni STRUCTURAL DRAWINGS FOR SIZE, DEPTH AND <br /> _-_--- ---�-7--�' ti r - --- -- `--, 1 I U LOCATION <br /> 8. REMOVE STAIR AND IT5 ENTIRETY. LANDING TO A <br /> b REMAIN OC u <br /> 9. REMOVE EXISTING BEAM AND PREPARE FOR NEW BEAM <br /> ---------___-_ -- AND SUPPORT PER STRUCTURAL DRAWI N65 w. u 11 <br /> -- - -� 10. PARTIAL REMOVAL OF FLOOR FOR NEW STAIR. SEE =B <br /> 10 ------ STRUCTURAL DRMIN66 FOR DETAILS. ¢ <br /> j ............................... <br /> - - - --- ---- 11. NEW STAIR OPENING IN CEILING ABOVE. <br /> I <br /> CST`!cD FOk Ek' E <br /> M t <br /> r--\r]'IITCii/-,--�i , , , , i POST PER PLAN W/ Q rn 0 B <br /> I �4 DOWELS® POST BASE PER PLAN �a N <br /> r___I__I__I__ 18"O.G.E.W., 0 N ERS <br /> N <br /> DRILL 3 EPDXY FOOTIN6 REINFORCING a n <br /> II PER SCHEDULE N > <br /> w <br /> (I,,) <br /> LI I a5 LAB- <br /> __�__ ON-GRADE <br /> 8 o 4- <br /> ------------- <br /> 7 <br /> L-----------------------------------J c � <br /> ' <br /> L—A <br /> Go <br /> �aa ^ � <br /> o <br /> DEMOLITION UPPER FLOOR PLAN "FOOTING TO ��n I/4" = 1 -0" BEAR DIRECTLY <br /> NORTH ON SUITABLE <br /> BEARING 501LS I'-0"MIN. <br /> LAP <br /> WIDTH PER SCHEDULE <br /> SPREAD FOOTING SCHEDULE <br /> MARK 5IZE DEPTH REINFORCING REMARK5 <br /> 771,I1'-8N I2'-5 8'-3 l 4> 4ys <br /> I. <br /> fIS I'-b"x 1'-6' 10" (2)04 EA.WAY P �° <br /> -----------------------j <br /> --- - - -- <br /> 4'-10" b'-10IS b'-2 2'-0 4' 4 F2.0 2'-0"x 2'-O" 10" (3)#4 EA.WAY <br /> 2'-6"x 2'-b" 10" (4)#4 EA.WAY <br /> -- <br /> '* x 3'-0" 12" (5)#4 EA.WAY <br /> I I <br /> III I <br /> I I E <br /> r --- - U o 6"x- 3'-b" 12" (5)#4 EA.WAY o <br /> f35 3' <br /> I I <br /> v ' <br /> z <br /> I <br /> 0 <br /> - - - 5 QUANTUM I CONSULTING ENGINEERS O <br /> LL <br /> PACIFIC COAST TI 5/31/2023 29356.DI Q <br /> 7 I1 1511 THIRD AVENUE W*lt eaN plea.. <br /> SUITE 323 MDA <br /> SEATTLE,WA 98101 eeegnee by a <br /> TEL 206.957.3900 2612 ARCHITECTURE 5C 55K-0B3125-A <br /> —.quenwmm.mm aem ere.a ebee U <br /> co Q <br /> w <br /> LL <br /> U c O <br /> a a V 2 <br /> a <br /> z <br /> FL a 3 0 <br /> I ;I Z V U x <br /> --+--+--+-'I 2 <br /> I I I I I I I ^ <br /> F LL N L! E p <br /> L1_L1_I_1_I_L_I <br /> Drawing: <br /> DEMOLITION LOWER FLOOR PLAN® A 2. 1 <br /> 1/4" = 1'-0" <br /> NORTH <br /> 23c-4539 <br />