My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
906 SE EVERETT MALL WAY MEDIX INFUSION 2025-09-29
>
Address Records
>
SE EVERETT MALL WAY
>
906
>
MEDIX INFUSION
>
906 SE EVERETT MALL WAY MEDIX INFUSION 2025-09-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2025 11:04:36 AM
Creation date
9/10/2025 2:07:57 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
906
Tenant Name
MEDIX INFUSION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: B2411-057 <br />Permit Inspections <br />City of Everett <br />Applied:11/26/2024 Approved:12/27/2024 <br />Issued:12/27/2024 Finaled: <br />Status: PERMIT ISSUED -ONLINE <br />Parent Permit: <br />Parent Project: <br />Details <br />Description: Interior office TI on the fourth floor. SUITES 400 AND 402 <br />Site Address: 906 SE EVERETT MALL WAY 4TH FLOOR <br />City, State Zip Code: EVERETT, WA 98208-3744 <br />Applicant: Kevin Broderick <br />Owner: PJP 5, LLC <br />Contractor: AVARA CONSTRUCTION INC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />1/14/2025 <br />1/14/2025 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />PARTIAL <br />eTRAKiT Inspection Request <br />APPROVAL <br />Notes: <br />1/13/2025 7:50 AM pedro guzman <br />Contact Name: pedro guzman <br />Site Address: 906 SE EVERETT MALL WAY 4TH FLOOR <br />Phone:2068093432 <br />e-Mail: pguzman@avaraconstruction.com <br />Walls only except wall with new plumbing in suite 402. All walls are existing in suite 402 except fill in areas. Plumbing permit needed for new sink being <br />added. Plumbing work not started yet. Ok to drywall mud and tape all other areas. Note: Plumbing in suite 400 is existing. Ceiling grid is existing to <br />remain per contractor. Replacing tiles only. <br />2/26/2025 <br />F 2/26/2025 <br />TBLDG 16-FINAL <br />RAKEEB KHAN <br />PARTIAL <br />suite 400 <br />APPROVAL <br />Notes: <br />2/21/2025 11:43 AM pedro guzman <br />Contact Name: pedro guzman <br />Site Address: 906 SE EVERETT MALL WAY 4TH FLOOR <br />Phone:2068093432 <br />e-Mail: pguzman@avaraconstruction.com <br />Suite 400 only. Ok to occupy suite 400. Suite 402 is in construction. Existing grid still exposed and small portion of wall exposed in suite 402. Ok to cover <br />wall if plumbing is not being altered. Plans specify new sink but contractor stated the sink is being eliminated. <br />I <br />Printed: Friday, 18 April, 2025 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.