|
GENERAL NOTES
<br /> DUCTWORK
<br /> ALL WORK ALL EQUIPMENT,> 1.1 ALL DUCT DIMENSIONS ON PLAN ARE CLEAR INSIDE DIMENSIONS,ADD 2"TO EACH TABLE C403.10.7.7
<br /> ALL PARTS TO BE INSTALLED, DIMENSION TO OBTAIN OUTSIDE DIMENSION.ADD 4'TO EACH DIMENSION IF THE OUTDOORAIR DUCTVOORKINSULATION
<br /> DUCTWORK IS ON THE INTERIOR OF THE BUILDING.
<br /> WILL B E I N FULL CO M P LI N C E 1.2 THE FIRST NUMBER ON ALL DUCT DIMENSIONS IS THE WIDTH AND THE SECOND IS
<br /> THE HEIGHT. MinimU
<br /> 1.3 MATERIALS WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME SPREAD RATING LESS Duc ul;t LOcatiOrl Bn Iimat Installed Du
<br /> WITH ALL CODES BELOW. THAN 25 AND A FLAME SMOKE DEVELOPMENT LESS THEN 50,PER ICM 602.2.1. ryste � l'flO InSUlat!O Note
<br /> 1.4 SEAL ALL TRANSVERSE JOINTS FOR DUCTWORK WITH STATIC PRESSURE BETWEEN alu
<br /> 112 INCHES AND 2 INCHES.DUCTWORK WHICH IS DESIGNED TO OPERATE AT 00
<br /> PRESSURES ABOVE 112 WATER COLUMN SHALL BE SEALED IN ACCORDANCE WITH Inside conditioned See Section Y
<br /> /'� STANDARD RS-7. outdoor space and upstream 4C and 2 2800 C403.10.1.1 for 10
<br /> 2021 WSEC 1.5 ALL DUCT GAUGES PER SMACNA,ICM 603-4. R-15 O
<br /> Air Of utomad shutoff 5B CFM additional Q
<br /> 1.6 ALL DUCT S 03
<br /> UPPORTS PER SMACNA, CIA 603-10. O C)
<br /> 2021 IMC 1.7 ATTACH DIFFUSERS AND GRILLES TO T-BAR PER ICM damper requirements It Q
<br /> 1.8 BALANCING DAMPERS ARE TO BE INSTALLED ON ALL BRANCH DUCTS OR DIFFUSERS. L.l..i w
<br /> 2021 L/t/SING Inside conditioned
<br /> Y Y INSULATION space and downstream U F
<br /> 2023 NEC Outdoor z26DD
<br /> 2.1 INSULATE OR LINE DUCTWORK PER WA.STATE ENERGY AND MECHANICAL CODES. Air Of lrtomOti Shutoff 4C CFM R-8 LL w
<br /> 2.2 INSULATE REFRIGERANT 8 CONDENSATE PIPING PER 2021WA.STATE ENERGY damper to HVAC unit or LL Ce
<br /> CODES. LU
<br /> 2021 IFC room O GENERAL CONTRACTOR >
<br /> 2021 IBC 3.1 GENERAL CONTRACTOR TO PROVIDE AND CUT OPENINGS FOR ALL ROOFTOP,CEILING, Inside conditioned J
<br /> w
<br /> FLOOR,AND WALL PENETRATION$,INCLUDING WEATHERPROOF SEALING AND FIRE space and downstream
<br /> /+ PROOF LININGS PER INC 6 IBC. Outdoor 22800 .J }
<br /> 2021 UPC 3.2 GENERAL CONTRACTOR TO VERIFY PENETRATION LOCATION AND DIMENSIONS WITH of utomOti shutoff 5B R-12
<br /> ERL BEFORE FRAMING OPENINGS. Nr damper to HVAC unit or CFM :
<br /> 3.3 GENERAL CONTRACTOR TO PROVIDE ALL DEMOLITION,PATCHING,AND PAINTING AS room 5
<br /> REQUIRED FOR MECHANICAL WORK. Cb J
<br /> 3.4 GENERAL CONTRACTOR TO PROVIDE ADEQUATE STRUCTURAL SUPPORT AS REQUIRED -I
<br /> ALL EQUIPMENT WILL BE TESTED GENERAHANICAACTOR See E%ceptionl _ <Q
<br /> 3.5 GENERAL CONTRACTOR TO PROVIDE SERVICE ACCESS PER CODE TO ALL LO SeCtiOn �' F" <
<br /> MECHANICAL EQUIPMENT. Outdoor Inside conditioned 4C and G2800
<br /> WITH REPORT PER CODE C408.2 AND 3.6 GENERAL CONTRACTOR TO LEVEL ALL FACTORY CURBS PROVIDED BY ERL PROVIDE P R-7 C403.10.1.1 for LU I
<br /> ALL CANT STRIPS AND CURB INSULATION,AND SEAL AGAINST LEAKS. Air 5 ace 5B CFM 5
<br /> 37 GENERAL CONTRACTOR TO PROVIDE ALL CUTTING AND PATCHING OR T-BAR CEILING additional 'i LU.
<br /> SECTION C403. AS REQUIRED FOR HVAC INSTALLATION. detdll6 LU Ce
<br /> w
<br /> 3.8 GENERAL CONTRACTOR TO PROTECT ALL OPENINGS THROUGH FLOORS PROVIDED
<br /> FOR DUCTWORK INSTALLATION IN ACCORDANCE WITH TABLE 601 OF INTERNATIONAL
<br /> ALL SUPPLY AIR GRILLS WILL AIR LU E W
<br /> BUILDING CODE,WHERE REQUIRED BY SECTION 707 OF IBC.
<br /> ELECTRICAL v
<br /> FLOW TESTED AND ADJUSTED WITH V)
<br /> 4.1 ASH TO INSTALL ALL LOW VOLTAGE CONTROL WIRING,CONDUIT WILL BE PROVIDED �
<br /> BY REPORT PER CODE. ELECTRICAL
<br /> CONTRAL ACTOR
<br /> O
<br /> 4.2 ELECTRICAL CONTRACTOR TO PROVIDE ALL ELECTRICAL CONNECTIONS, (2
<br /> DISCONNECTS,AND STARTERS FOR MECHANICAL EQUIPMENT.
<br /> ALL DUCT WORK WILL BE INSULATED 43 WITHELECTRICALASH
<br /> RTO AND
<br /> HFIEL LOCATES,LOADS AND LOCATIONS,
<br /> WITH ASH MECHANICAL PLAN AND WITH FIELD LOCATIONS.
<br /> TO CODE PER 2021 IMC AND 2021 WSEC. 44 ELECTRICAL CONTRACTOR TO INTERLOCK BATHROOM EXHAUST FANS WITH LIGHT
<br /> SWITCH.
<br /> 4.5 ASH TO PROVIDE 7-DAY NIGHT SETBACK,PROGRAMMABLE TYPE T-STAY WITH TABLE C403.70.1.2
<br /> ALL NEW FLEX DUCT WORK WILL BE NO ASHCAPABILITY Y FINAL LOCAND.TION
<br /> SUPPLY,RETURN,IXIiAuST,and RELIEF AIR DUCTWORK INSULATION
<br /> 4.6 ASH TO VERIFY FINAL LOCATION OF THERMOSTAT WITH CUSTOMER.
<br /> LONGER THAN 7 FEET. 4.7 ELECTRICAL CONTRACTOR L PROVIDE ELECTRICAL GCFI OUTLET WITHIN 25 FT OF
<br /> EACH PIECE OF MECHANICAL EQUIPMENT. Inlmu
<br /> PLUMBING oun Laudon and us cllon Ilnsueet unR
<br /> IF APPLICABLE TO THIS JOB ALL DUCT 5.1 PLUMBING CONTRACTOR OFFSET$VENTS 10 FEET MINIMUM FROM ALL HVAC FRESH lua"
<br /> AIR INTAKES OR 3'ABOVE HIGHEST POINT OF INTAKE,IMC 401.4.1
<br /> WORK TO BE WILL BE RATED FOR 5.2 CONDENSATE DRAINS FROM RTU ERL TO DRAIN WITHIN 12'OF UNIT.CONDENSATE
<br /> DRAINS FOR AIR HANDLERS BY PLUU MBER. 4C R-B See Section C403Ao.12 forSupp Q
<br /> PLENUM RETURN AIR SYSTEM ENERGY CODE COMPLIANCE or Reltrum yAJr Outside the bullring(outdoors and de ails a
<br /> ar .,Id d h weather
<br /> 6.1 THE SUPPLY HEATING AND COOLING ENERGY TO EACH ZONE SHALL BE CONTROLLED a
<br /> BY INDIVIDUAL THERMOSTATIC CONTROLS CAPABLE OF RESPONDING TO Q
<br /> TEMPERATURE WITHIN THE ZONE.AT MINIMUM,EACH FLOOR SHALL BE CONSIDERED A ZONE Supplyar Outside the building(outdoors and S 5B R- S 12 See ectlan C4B3.10.12 for
<br /> . Re
<br /> 6.2 OUTDOOR AIR SUPPLY,EXHAUST OPENINGS AND RELIEF OUTLETS SHALL BE Air exposed to weather ee Se
<br /> L.
<br /> tum ROVIDED WITH CLASS IA MOTORIZED DAMPERS WHICH CLOSE AUTOMATICALLY
<br /> WHEN THE SYSTEM IS OFF PER ICM SECTION C403.2.4.3.
<br /> Supply Air 4Cand R-6 See Section C403.10.12 for q
<br /> MECHANICAL CODE COMPLIANCE orRetum unconditioned space(enclosed but not in 5B details
<br /> e the building conditioned envelope) G
<br /> 7.1 WHERE REQUIRED PROVIDE AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTORS G
<br /> IN EACH SYSTEM DELIVERING HEATING OR COOLING AIR IN EXCESS OF 2000 CFM. d a
<br /> DETECTORS SHALL BE LOCATED IN THE MAIN RETURN AIR PER IMC 606. Uncontlltioned space where mariner 4C and R-3.3 See IMC Section 603.12 for
<br /> Supply Air conveys air that is within 15°Fofthealr S6 additional requirements forM]MM a
<br /> me: or Return temperature of the surrounding condensation control at
<br /> Alr unconditioned space ductwork Project pmlett Address: A
<br /> Information TypeCertifiede sioteri and
<br /> Nu b- Suppy Alr Where located lnabullding erwelope 4C and R-16 Duct
<br /> or plenum Is separated
<br /> Type of l50 CeniR antl M1Rlrnber: or Return assembly 5B from bullding envelope
<br /> El 9?anuals,record documents andtraining have been completed or are scheduled Section C103.6) Air assembly with the minimum (d
<br /> . B=e ratdana and m-iater�eiof-gum ca.(CI03.62)havebeensnbmxfhedtotheo,�erar COMMISSIONING PLAN w Imulatlonvalue
<br /> supporting ft; Supply Alr within conditioned space where the 4C and R-3.3 See Section C403.10.1.2 for u,
<br /> Documents Mm-Is(C103-62-1)have been submitted to the orruer Or scheduled dam: supply duct conveys air that is less than 5B details
<br /> Compliance daamentation C103.63 has been ALL COMMISSIONING OF HEATING,VENTILATION AND AIR CONDITIONING SYSTEMS AS 5
<br /> ( } proiidedtodteowneror hmh kxdd2t,: REQUIRED BY SECTION C408'SYSTEM COMMISSIONING"OF THE 2018 WASHINGTON STATE 55°F orgreater than 105•F
<br /> • S taco ration ENERGY CODE(WSEC)SHALL BE PERFORMED BY AL STAR HEATING AND A/C INC THE
<br /> ys ape tta�(C103.6.4)h=beeapmvid dfiDtheocr°ner-..heduladd2te: ACTIVITIES TO BE ACCOMPLISHED ARE PER THE SECTIONS LISTED IN THE Supply Air Within condi[toned space that the duct 4C and None See Section C403.10.1.2 for
<br /> C-crisstonm Plan ❑COmmissiouht Plan ryas used - 'COMMISSIONING COMPLIANCE CHECKLIST"SHOWN BELOW.AT THE COMPLETION OF THE directly serves where the supply duct 5B details
<br /> 9 g dmmg constructian(Section C408.12) ACTIVITIES REQUIRED FOR COMMISSIONING AS DEFINED BY SECTION C408 OF WSEC THE conveys air that is less than 55°For
<br /> Commissioning Report Commnssiaeing Report has been submitted Secuen g_13 "COMMISSIONING COMPLIANCE CHECKLIST' WILL BE REVIEWED WITH THE BUILDING greeterthan105°F
<br /> OWNER OR THE OWNER'S REPRESENTATIVE AND THIS CERTIFICATION WILL BE SIGNED
<br /> Ll ZyIechanical Systems were lucluded in the cammissimtmg process Section C4082 AND DATED.THIS WILL SATISFY TO THE CODE OFFICIAL THAT THE REPORT HAS BEEN PPY Su Alr Within contlitloneds ace where fhe 4C and None
<br /> ACCEPTED AS REQUIRED BY SECTION C408.1.3 OF WSEC. P
<br /> El Testing,adjusting and balandug is.complete(Section C40822)
<br /> supply duo Conveys air that is 55°For SB
<br /> ❑There are umesolI deficiencies with the mechanical systems_These are described in the attached greater and 105°F or less
<br /> Commission Report submitted to the Owner_ ama Return or Within Conditioned space,downstream of 4C R-B
<br /> Exhaust an energy ecowry Creole,upstream of
<br /> Service Water Heating System were included fn the commissioning process(Searon CA083) rrM.rrammrgo Air an uromatl shutoff damper
<br /> 11 There are umespbred deft-caries vOrth the service water heating systems-These are desmbed inihe mwaswnEN
<br /> attached C stoning Report sunrni-- to the Ovner- mm racoon awnemr:
<br /> � cO Return or Within CondKloned space,downstream of SB R-12
<br /> ❑COtttt g eartacles and lighting a inlrel systems were included in the rommisSium g process Exhaust an ene rerowry media,upstream of
<br /> (Section C408-4) conn¢aoanx: ❑ o,mmwlom::rp,::w..wme,.m�a m::.wmo::.::e mn,:a.a rorm.n.lw Air an utomatl shutoffdamper
<br /> Commissioned ❑There are umesolced deficiencies with the electrical power 21112.IET title lighting controls These are (SECTIONgwer oe.rzi rmrrom ro aE,awD wmna„r .wmaxa w moo ro<coonn.a mu one Relief or [ondl0oned space and downstream of and R-16
<br /> Systems des txfb�in the attached.Cot�ssstomne Report submtlted to the Owner.
<br /> Addif or l systems were)nchaded in the commissioning process(Section C408.5) Air
<br /> ® P
<br /> Exhaust an utomac/sh .dam er 58
<br /> ❑There are�resplved deficiettcias wifto 53rstems ed by C406 or C407_Tbece are described itx the srsrens ❑ srmms eaa.cma sm nee.ame�etee
<br /> xegmr rmionscaioe
<br /> attached Carm.rmh-,dd., Oftsubmittedtathc tArmccr. Isec .z.zlroan<aE:m.�oEo o.E«n:m:ran nr.:va�.�: aE,«�,,:,.r:�Es
<br /> ❑Metering systems were included m the commissioning process(Section C408.6)
<br /> ❑There are nates xI deficiencies With the metetine system These are described m the attached n� ❑ rrvnc asmomeer reaWarel r®re:a n..mean cemoierea ISOCT-u0e.2.3.o
<br /> Commissionin^Report submitted to the Owner_ (SECTION C"oe.z.m xunc ra�mmr x>s aim wswo To w
<br /> ❑Refrigeration systems ri re Included m the man missioning process(Section C408-7) ❑ sync aao-aa ruara.nal rxwas n..xea wmsletea vworE(Se .1.C4os.x 3.2)
<br /> There are tmresolved defi---us widt systemu��ed.by Section C410.These are described in the x.w aEEx rEarEa re rmDaE,x.r roxwro DEv�:Es.w r.Oaa.hD..D,arrEo.xo eOa.rE -
<br /> attached Commissioning Report suiamiued to the Oranes- r�o..::.rrrrm ro ammr rxr.orra.,E�a<aoe..ur wm
<br /> 11 I here I o thatregqrraa¢¢ements Section C498 System Cat>✓�omug eve Coco eta m �rP�: �'S��� •nsX r
<br /> accordance with the bVasbinexan State Energy Cade,Including all items abase- ❑ e au.a reacaa,el rstl:g nb ee.aDramol.tm Tom (SEcnrx u0e.2.3.3)
<br /> Cs-'fi-`-u Certified Commissioning Professional Date ❑ a.mul.,reran eoa:maara.eetmmma n.aa mean raewtatae ar.m.rnaamm
<br /> ❑Ihereby certify that requirenreLns for Section C408 System Commissioning have been completed is (SECTIONs+�(veae amsum�n�n.emu on x.wvn
<br /> accords a with fhe Washington Stye Energy Code,including all items above- cnou ciao T.Nl,a a.r.11 raMo:E.Ea m araw:Ea cow. "
<br /> LJOI
<br /> Building Owner or Owner's Representative Date ❑ e�:.oar°w�o 11111::E:r�a.wn�:n a.w mr aEEry rDaw:reD.r wE rim
<br /> (SECTION c4oe.1...p .III"-r aE rEarrawo.T wE v,a or aE.om rear°..r�o.mE To
<br /> ❑ .O-OD i..aDmv,w w,ra wE
<br /> rexTIFlUTIea a��aDroasrau�-Ipoaoa� a=��a.a:�I a.w M =3
<br /> L City of Everett Permit Services
<br /> EVERETT Reviewed for Permit 02/03/2025
<br />
|