Laserfiche WebLink
LEGEND/SYMBOLS MATERIAL SYMBOLS ABBREVIATIONS GENERAL NOTES <br /> & AND IN NCH <br /> ® AT INCL INCLUDED(D)(ING) 1. OBTAIN&POST REQUIRED CONSTRUCTION PERMITS FROM THE CITY OF EVERETT PRIOR TO <br /> SECTION/DETAIL DESIGNATION 0 EARTH,DIRT,COMPACTED AS ANCHOR BOLT JT JOINT COMMENCING CONSTRUCTION. <br /> ACP ACOUSTICAL CEILING PANEL <br /> BUILDING,WALL SECTIONS ACT ACOUSTICAL CEILING TILE K KIP(S) 2. VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE BOEING PROJECT CONSTRUCTION MANAGER <br /> AND DETAIL REFERENCES ,p a ADJ ADJACENT KO KNOCK OUT SHOULD CONDITIONS DIFFER FROM DESIGN DOCUMENTS. <br /> STONE,GRAVEL,POROUS FILL AFF ABOVE FINISHED FLOOR <br /> AUG AGGREGATE L LENGTH 3. THE SCOPE OF WORK INCLUDES ALL WORK WITHIN THE CURRENT REVISION CLOUD(S ON EACH <br /> SHEEP NUMBER WHERE DETAILED LB LAG BOLT SHEET.IF THERE IS NO CLOUD ON A SHEET THE ENTIRE SHEET IS IN THE SCOPE OF WORK. <br /> ® BRICK,COMMON AL ALUMINUM SHEET NUMBER REFERENCED FROM ALT ALTERNATE LEN LENGTH INFORMATION OR WORK(WHETHER CLOUDED OR NOT)REFERRED TO FROM WITHIN A CLOUD IS <br /> INCLUDED IN THE SCOPE OF WORK(LE.-A SECTION OR DETAIL SYMBOL THAT LIES WITHIN A <br /> ALUM ALUMINUM LF LINEAL FEET CLOUD ON A PLAN VIEW SHEET IS INCLUDED IN THE SCOPE EVEN WHEN THE ACTUAL SECTION OR <br /> INTERIOR ELEVATION REFERENCE ® CERAMIC TILE ANCH ANCHOR,ANCHORAGE LWR LOWERLL LIVE DE DETAIL DRAWN ON THE DETAIL SHEET IS NOT CLOUDED.) <br /> APA AMERICAN PLYWOOD ASSOC. <br /> APPD APPROVED 4. KEEP ALL AREAS UNDER CONSTRUCTION CLEAR OF DEBRIS CAUSED BY THIS SCOPE OF WORK. <br /> CONCRETE APPROX APPROXIMATE MATL MATERIAL STORE CONSTRUCTION MATERIALS AND EQUIPMENT IN AREA DESIGNATED BY THE BOEING PROJECT <br /> X X# MAX MAXIMUM CONSTRUCTION MANAGER. <br /> ASTM AMERICAN SOCIETY OF ME MACHINE BOLT <br /> TESTING MATERIALS SHEET NUMBER WHERE DETAILED 5. VERIFY DIMENSIONS AND CONDITIONS SHOWN ON THE DRAWINGS AND ENSURE THAT THE JOINING <br /> INSULATION:BAT!,LOOSE FILL.BLANKET OVER MEMBER OF THE WORK OF VARIOUS TRADES MEETS APPROPRIATELY. BRING DISCREPANCIES ON THE <br /> SHEEP NUMBER REFERENCED FROM BTWN BETWEEN MTL METAL DRAWINGS OR IN SPECIFICATIONS TO THE ATTENTION OF THE BOEING PROJECT CONSTRUCTION <br /> EARTH,DIRT,UNDISTURBED BLDG BUILDING OVER MANUFACTURE(R) MANAGER IMMEDIATELY UPON DISCOVERY. THE CONTRACTOR SHALL ADVISE BOEING,SUMMARIZE <br /> INSULATION:RIGID KG BLOCKING MIN MINIMUM THE SITUATION AND PROVIDE RECOMMENDATIONS TO RESOLVING POTENTIAL CONFLICTS PRIOR TO <br /> !REFERENCE TO DETAIL/ENLARGED PLAN BO BOTTOM OF MISC MISCELLANEOUS SUBMITTING ANY REQUESTS FOR INFORMATION(RFIs). <br /> HX N X H <br /> ALUMINUM 1\ 1 NOT BOTTOM MO MASONRY OPENING 6. CONFORM ALL WORK TO APPLICABLE CODES,REGULATIONS AND INDUSTRY STANDARDS. <br /> ---- ® MT MOUNT(ED)(ING) <br /> C CHANNEL MTL METAL 7. COMPLY WITH THE BOEING PROJECT CONSTRUCTION MANAGER FOR CONSTRUCTION AREA AND <br /> 6XXXEDETAIL DESIGNATION BRASS,BRONZE,COPPER CB CATCH BASIN SECURITY REGULATIONS. <br /> ETCC CENTER TO CENTER INNORTH(COORDINATE) <br /> SH NUMBER WHERE DETAILED CEM CEMENT NF NEAR FACE 8. PROVIDE,AS IF DRAWN IN FULL,REPETITIVE FEATURES NOT FULLY SHOWN OR NOTED ON THE <br /> (IF SAME AS SHEET REFERENCED FROM) ® METAL,STEEL,IRON OF CUBIC FEET NIC NOT IN CONTRACT DRAWINGS. <br /> CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED No. NUMBER 9. DIMENSIONS ON DRAWINGS ARE TAKEN TO THE FACE OF MASONRY AND/OR CONCRETE WALLS, <br /> SECTION/DETAIL DESIGNATION CG CORNER GUARD ROM NOMINAL METAL STUDS,AND TO THE CENTERLINE OF COLUMNS,UNLESS OTHERWISE NOTED, <br /> X 0 PLASTER:SAND,CEMENT,GROUT CJ CONTROL JOINT NTS NOT TO SCALE <br /> XXXXX XXXX)( SHEET NUMBER WHERE DETAILED CL CENTER LINE 10. DOOR OPENINGS ARE 6"FROM ADJACENT WALLS OR CENTERED IN ROOM WALL,UNLESS <br /> CLG CEILING CA OVERALL DIMENSIONED OTHERWISE. <br /> PLASTER:GYPSUM WALL BOARD CLR CLEAR(ANCE) O/C ON CENTER <br /> SHEET NUMBER REFERENCED FROM COL COLUMN OD OUTSIDE DIAMETER 11. PARTITIONS SHALL RUN FULL HEIGHT,FROM FLOOR TO FLOOR ABOVE UNLESS SHOWN OR NOTED <br /> OTHERWISE. <br /> WOOD:FINISH COMP COMPRESS(ED)(ION) OF OUTSIDE FACE <br /> N NORTH ARROW CONC CONCRETE OFCI OWNER FURNISHED CONTRACTOR INSTALLED 12. PLANS WHICH APPEAR AS"BACKGROUNDS"ON CIVIL,STRUCTURAL,PLUMBING,HVAC,ELECTRICAL <br /> CONN CONNECTION OFOI OWNER FURNISHED OWNER INSTALLED DRAWINGS ETC.,ARE FOR THE PURPOSE ONLY OF ILLUSTRATING GENERAL PLAN CONFIGURATION. <br /> OPG OPENING SUCH BACKGROUNDS SHALL NOT BE USED FOR PORTIONS OF THE WORK OTHER THAN THAT <br /> ® WOOD:ROUGH CONTINUOUS CONST CONSTRUCTION OPP OPPOSITE.OPPOSITE HAND PERTAINING TO THE TITLE OF EACH SHEET. REFER TO THE APPROPRIATE SHEET FOR EACH <br /> CONT CONTINUOUS,CONTINUE SPECIFIC PORTION OF THE WORK. <br /> ELEVATION DATUM CONTR CONTRACT(OR) PAR PARALLEL <br /> Idw OR SPOT ELEVATION WOOD:INTERRUPTED BLOCKING CT CERAMIC TILE <br /> FCC PRECAST CONCRETE 13. COORDINATE THE WORK OF ALL TRADES. REFER TO ARCHITECTURAL,STRUCTURAL,MECHANICAL <br /> CTSK COUNTERSUNK PCP POUNDS PER CUBIC FOOT AND ELECTRICAL DRAWINGS IN DETAIL FOR COORDINATION OF SPECIFIC TRADE REQUIREMENTS. <br /> LD CEILING HEIGHT A.F.F. CY CUBIC YARD(S) PERF PERFORATE(D) COORDINATE ALL ROUGH-IN REQUIREMENTS FOR EQUIPMENT FURNISHED BY CONTRACTOR OR BY <br /> ® PLYWOOD:SMALL SCALE OTHERS FOR THIS PROJECT. <br /> XXXXXX ROOM NAME 0,DIA DIAMETER PERIM PERIMETER <br /> XXXX ROOM NUMBER DEL DOUBLE PG PATTERN GLASS 14. PROVIDE MANUFACTURERS INSTALLATION INSTRUCTIONS TO THE BOEING PROJECT CONSTRUCTION <br /> DEMOL DEMOLISH,DEMOLITION PL PLATE MANAGER WHENEVER SUCH INSTRUCTIONS ARE REFERENCED IN THE CONSTRUCTION NOTES. <br /> PLYWOOD:LARGE SCALE DEP DEPRESSED PLAM PLASTIC LAMINATE <br /> XXXXX DOOR NUMBER DIA DIAMETER PLYWD PLYWOOD 15. CONTRACTOR SHALL COORDINATE WITH THE BOEING PROJECT CONSTRUCTION MANAGER FOR <br /> DIAG DIAGONAL PNL PANEL STAGING AREAS WHERE CONTRACTOR MAY STORE SALVAGED MATERIALS TO BE REUSED IN LATER <br /> PARTS OF THIS PROJECT AND WHERE MATERIALS TO BE STAGED BY BOEING ARE TO BE LOCATED. <br /> ® WALL TYPE:CONCRETE MASONRY(CMU) DIM DIMENSION PRIEST PRESTRESS(ED) <br /> GRID/GRID BUBBLE AND DL DEAD LOAD PRE PREFORMED 16. SYMBOLS SHOWN ON MATERIALS LIST ARE NOT ALWAYS USED IN DRAWINGS. VERIFY EXISTING <br /> CENTERLINE DIN DOWN PSF POUNDS PER SQUARE FOOT MATERIAL AND SEE CONSTRUCTION NOTES FOR MATERIAL CALLOUTS. <br /> ITEMS TO BE REMOVED DS DOWNSPOUT PSI POUNDS PER SQUARE INCH <br /> WALL TYPE:STEEL STUD 17. WHERE EXISTING WORK IS DAMAGED,CUT OR DEFACED AS A RESULT OF DEMOLITION OR <br /> DWG DRAWING PT POINT,PAINT PERFORMANCE OF NEW WORK,THE CONTRACTOR IS TO PATCH AND REPAIR THE EXISTING TO <br /> CONSTRUCTION"FLAG"NOTE FOR SPECIFIC PVC POLYVINYL CHLORIDE MATCH ADJOINING SURFACES. REPAIRED FINISHES SHALL BE EXTENDED TO THE NEAREST VISUAL <br /> CONSTRUCTION DIRECTIVE WALL TYPE:WOOD STUD E EAST(COORDINATE) BREAK LINES SUCH AS CORNERS,CEILING LINES,TOP OF BASE,CHANGE IN MATERIAL OR SIMILAR. <br /> EA EACH R RADIUS(CURVATURE) <br /> GENERAL"BOAT"NOTE FOR EB EXPANSION BOLT R RISER 18. ALL RECESSES LOCATED WITHIN FIRE RATED PARTITIONS SHALL BE CONSTRUCTED TO MAINTAIN <br /> SPECIFIC OR EXISTING HISTORICAL EF EACH FACE RB RESILIENT BASE <br /> REQUIRED FIRE RATING OF THE PARTITION. <br /> 0 WALL TYPE:EXISTING EJ EXPANSION JOINT RCP REFLECTED CEILING PLAN 19. ARCHITECTURAL REFLECTED CEILING PUNS INDICATE THE FINAL LOCATIONS OF MECHANICAL AND <br /> INFORMATION. REF REFERENCE,REFER TO <br /> O EL ELEVATION ELECTRICAL COMPONENTS. SEE THE REFLECTED CEILING PUNS FOR LOCATIONS OF ITEMS IN THE <br /> X WINDOW FRAME TYPE ELEV ELEVATION RE <br /> INF REINFORCE(D)(ING) CEILING;SEE DISCIPLINE SHEETS FOR ALL INFORMATION ABOUT THE MECHANICAL AND ELECTRICAL <br /> WALL TYPE:REMOVAL EQ EQUAL REQ REQUIRE(D)(ING) COMPONENTS INDICATED ON ARCHITECTURAL REFLECTED CEILING PUNS. <br /> EW EACH WAY REV REVERSE,REVISION(S),REVISED 20. PROVIDE CLOSURE,MEETING THE REQUIREMENTS OF GOVERNING FIRE AUTHORITIES,BETWEEN ALL <br /> EX EXISTING RH RIGHT HAND FIRE RATED FLOORS,SHAFTS AND BUILDING PARTITIONS AND ALL PENETRATING DUCTS,PIPES, <br /> X PARTITION/WALL TYPE WALL TYPE:PARTITION(7'-0"HIGH) EXP EXPOSED RO ROUGH OPENING CONDUIT, MECHANICAL,ELECTRICAL,AND OTHER ITEMS. <br /> EXT EXTERIOR S SOUTH(COORDINATE) 21. THE CONTRACTOR IS RESPONSIBLE FOR REVIEW OF THE STRUCTURAL,MECHANICAL AND <br /> T7 END WALL GUARD WALL TYPE:GLASS FAS FASTEN(ER) SECT SECTION ELECTRICAL DRAWINGS FOR CUTTING AND PATCHING WORK WITHIN THE BUILDING,BEYOND THE <br /> FE FIRE EXTINGUISHER SF SQUARE FEET LIMITS OF THE ARCHITECTURAL DRAWINGS. <br /> CORNER GUARD FEC FIRE EXTINGUISHER CABINET SIFT SHEET 22. AT METAL STUD PARTITIONS,STUDS ARE TO EXTEND FROM FLOOR TO FLOOR U.N.O..WHERE THEY <br /> 77 FF FINISHED CEILING SIM SIMILAR CANNOT DO S0,DUE TO INTERFERENCE WITH NEW OR EXISTING DUCTS,PIPING,ETC.,PROVIDE <br /> FF FACTORY FINISH SQ SQUARE BRACING TO STRUCTURE ABOVE TO PROVIDE FOR EQUIVALENT SUPPORT OF PARTITION;SUBMIT <br /> FF FINISHED FLOOR SS SOLID SURFACING EQUIVALENT SUPPORT METHOD TO ARCHITECT FOR REVIEW. ALL FIRE RATED PARTITIONS SHALL BE <br /> CPT-1 FINISH DESIGNATION FOR FINISH GRADE SST STAINLESS STEEL U U.N.O. <br /> TO MAINTAIN THEIR RATING FROM FLOOR TO UNDERSIDE OF STRUCTURE ABOVE, <br /> FH FIRE HYDRANT ST STRUCTURAL TEE <br /> REVISION CLOUD WITH FIN FINISH(ED) STD STANDARD 23. PROVIDE ACCESS DOORS AS INDICATED OR AS NECESSARY AND VERIFY WITH MECHANICAL AND <br /> REVISION LETTER"BEAK" END FOUNDATION STL STEEL ELECTRICAL SUBCONTRACTORS EXACT LOCATIONS OF ACCESS REQUIRED BY THEIR WORK.ACCESS <br /> TOO FACE OF CONCRETE STIR STRUCTURAL MUST BE PROVIDED FOR ALL CONCEALED VALVES,DAMPER CONTROLS,FIRE DAMPER LINKAGES, <br /> FOR FACE OF FINISH SYM SYMMETRY,SYMMETRICAL CONCEALED JUNCTION BOXES,AND ELECTRICAL DEVICES OR ACCESSORIES.LOCATIONS AND SIZES <br /> OF EXPOSED ACCESS DOORS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW PRIOR TO <br /> A FDIC FURNISHED BY OWNER/ SYS SYSTEM INSTALLATION OF THE MECHANICAL AND ELECTRICAL EQUIPMENT. <br /> INSTALLED BY CONTRACTOR T TEMPERED GLASS <br /> VCT CPT FLOOR MATL TRANSITION FO10 URNISHED BY OWNER/ T&B TOP AND BOTTOM 24. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN ACCORDANCE <br /> INSTALLED BY OWNER T&G TONGUE AND GROOVE WITH ALL SAFETY CODES,REGUALTIONS AND BOEING REQUIREMENTS. <br /> TEMP TEMPORARY <br /> TO FINISHED OPENING THK THICK(NESS 25. THE CONTRACTOR SHALL RETAIN A FIRE PROTECTION ENGINEER LICENSED IN THE STATE OF <br /> FEo- FIRE EXTINGUISHER ) <br /> FRO FOR REFERENCE ONLY TOO TOP OF CURB WASHINGTON TO DETERMINE/DESIGN THE MODIFIED FIRE SPRINKLER SYSTEM LAYOUT WITHIN THE <br /> FECYYY"'� FIRE EXTINGUISHER&CABINET FT FOOT TOO TOP OF CONCRETE AREA OF WORK.SAID ENGINEER SHALL STAMP,SEAL AND CERTIFY THAT HIS/HER DESIGN IS IN <br /> FTG FOOTING TOL TOLERANCE COMPLIANCE W/ALL APPLICABLE CODES AND REGULATIONS.CONTRACTOR SHALL COORDINATE ALL <br /> O ® SUPPLY AIR DIFFUSER PUT FUTURE TOS TOP OF STEEL NECESSARY MODIFICATIONS AS A RESULT OF SAID ENGINEER'S DESIGN. <br /> FV TORETURN AIR GRILLE A GAGE ELD VERIFY TS STRUCTURAL TUBE 26. THE CONTRACTOR SHALL INSURE THAT THE ELEVATOR CAR,EQUIPMENT ROOM,EQUIPMENT LAYOUT <br /> TYP TYPICAL CRFG GLASS FIBER REINFORCED GYPSUM AND HYDRAULIC/ELECTRICAL ROUTING FULLY MEETS STATE OF WASHINGTON CODES AND� FLOURESCENT LIGHT FIXTURE(PENDANT MOUNTED) <br /> GALV GALVANIZED UBC UNIFORM BUILDING CODE COMPLIANCE. FULLY COORDINATE WITH ARCHITECT PRIOR TO FABRICATION AND INSTALLATION. <br /> ® FLOURESCENT LIGHT FIXTURE(PENDANT MOUNTED) GC GENERAL CONTRACTOR ILL UNDERWRITERS'LABEL 27. AT LOCATIONS WHERE STRUCTURE,PIPING,DUCTWORK,CABLETRAY,OR CONDUIT PENETRATES <br /> GI GALVANIZED IRON ONO UNLESS NOTED OTHERWISE WALLS AND ARE EXPOSED TO VIEW,CONTRACTOR SHALL COPE AS CLOSELY AS POSSIBLE TO THE <br /> FLOURESCENT LIGHT FIXTURE ON EMERGENCY GR GRADE UPR UPPER MEMBER AND INSTALL CONTINUOUS CAULKING AROUND MEMBER AND PAINT OR PROVIDE <br /> NIGHT LIGHT(NL)CIRCUIT GT GROUT ESCUTCHEONS MATCHING WALL COLOR AT PENETRATIONS. <br /> O RECESSED OR PENDANT LIGHTING FIXTURE OWE GYPSUM WALL BOARD VB VAPOR BARRIERHDNR HARDENER VC VINYL 28. FOR CONSISTENCY ALL CONSTRUCTION NOTES(-FLAG NOTES")FOR EACH GROUP: PAN AND <br /> RECESSED OR PENDANT LIGHTING FIXTURE DLR Group HDWD HARDWOOD VERT VERTICAOMP.TILE RCP'S,ARE SHOWN IN THEIR ENTIRETY. ALL CONSTRUCTION NOTES MAY NOT BE REFERENCED ON <br /> FLOURESCENT LIGHT FIXTURE ON EMERGENCY ; ; Imams HDWR HARDWARE VIF VERIFY IN FIELD EVERY SHEET. <br /> NIGHT LIGHT(NL)CIRCUIT HG HIGH GRADE W WEST(COORDINATE) 29. FRAME TYPES ARE TYPICALLY DRAWN LOOKING FROM THE OUTSIDE OR CORRIDOR SIDE UNO. <br /> E_rS7 WALL SCONCE 1 W WIDE FLANGE <br /> d WALL SCONCE 2 HORZ HORIZONTAL AL <br /> Q W WIDTH,WIDE <br /> ® EXIT SIGN(CEILING UNIT) 90% ISSUE FOR R PERMIT ITS HIGH STRENGTH WC WATER CLOSET <br /> F® EXIT SIGN(WALL MOUNT) HT HEIGHT WD WOOD <br /> W/ WITH <br /> 07.12.24 BC INTERNATIONAL BLDG.CODE W/o WITHOUT <br /> ID INSIDE DIAMETER WWF WELDED WIRE FABRIC <br /> ID INSIDE DIMENSION NOTE:REFER TO THE COLOR AND MATERIAL <br /> SCHEDULE FOR ADDITIONAL FINISH AND <br /> IF INSIDE FACE DESIGNATIONS ABBREVIATIONS <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE N <br /> °RIG NEW FENCE/GATES W9749677 DLR GROUP ECA 07.12.24 !4a HSC ESIGNBAND�R CHECKEDOs.,3.z4 LEGEND,MATERIALS,ABBREVIATIONS&GEN'L NOTES R oz12.24 <br /> LD W9749677 SPECIFICATION IS APPROVED ECA 05A T24 SHEET® N C EAPPROVED BY DEPTDATENEW FENCE/GATES <br /> CHECKED G2 APPROVED BUILDING 40-056 JOB NO, COMP NO. BE <br /> APPRoveD ARCHITECTURAL MASTER EVERETT, WA CIS ND. 40-056-G2 <br />