Laserfiche WebLink
ELASTOFLEX S6 <br /> SBS INTERPLY/BASE MEMBRANE - 3.0 MM <br /> APPLICATION INSTRUCTIONS MANUFACTURING FACILITIES <br /> Elastoflex S6 is intended to be used as a base sheet or interply in • Fernley, NV <br /> new or re-roof applications. Elastoflex S6 may be adhered directly • Hazleton, PA <br /> to non-combustible substrates. Polyglass requires the installation • Waco, TX <br /> of a compatible surfacing or cap sheet on top of Elastoflex S6 to • Winter Haven, FL <br /> complete the roofing system. <br /> CORPORATE HEADQUARTERS <br /> • Apply over clean, dry, dust and debris-free substrates. When <br /> fully bonding, prime concrete decks and required substrates, Polyglass U.S.A., Inc. <br /> prior to application with PG 100 Fast-Drying Asphalt Primer or 1 1 1 1 West Newport Center Drive <br /> Deerfield Beach, FL 33442 <br /> applicable ASTM D-41 asphalt primer. <br /> • When re-roofing, remove all prior roofing materials down to a Generalw. <br /> yglass.us <br /> 75 <br /> clean debris-free substrate and properly remove all abandoned General Line: j88 ) 33-1330 <br /> roof penetrations. 195412 33-1330 <br /> 9782 <br /> • Concrete or steel decks shall be designed with proper Customer Service: j8661 802-8017 <br /> expansion devices. Technical Service: j866) 802 8017 <br /> • Wood decks shall have all joints blocked and properly supported. Questions?technical@polyglass.com <br /> • Ensure the fire rating of the assembly over any substrate. Product Disclaimer: Unless otherwise incorporated into or part <br /> • Ensure the installation of Elastoflex S6 does not prevent the of a supplemental manufacturer's warranty, Polyglass warrants its <br /> ventilation of existing construction. product(s) against manufacturing defects in its product that directly <br /> • Do not apply directly over shingles or existing membrane roofing. results in leakage for a period of 2 years. <br /> • While installing Elastoflex S6 in torch configuration: <br /> Refer to safety data sheet jSDS)for specific data and handling of <br /> 1. Start at the low point of the roof. our products. All data furnished refers to standard production and is <br /> 2. Unroll the material and allow to relax. given in good faith within the applicable manufacturing and testing <br /> 3. Install with traditional torch roofing techniques ensuring tolerances. <br /> proper heating of the roofing material as not to expose <br /> the reinforcement. Polyglass U.S.A., Inc., reserves the right to improve and change <br /> 4. Do not heat the substrate. its products at any time without prior notice. Polyglass U.S.A., <br /> 5. Position successive rolls providing a minimum 6"end lap Inc. cannot be held responsible for the use of its products under <br /> and 3"side lap. Asphalt bleed out shall be '/a" to 3/a" on conditions beyond its own control. For most current product data <br /> all seams. and warranty information, visit www.polyglass.us <br /> 6. Laps shall be rolled with a 6" roller immediately after <br /> heat welding. <br /> • Details and flashing may be installed using torch techniques, hot <br /> asphalt, or cold application. Check project details for proper <br /> installation requirements. <br /> POLYGLASS® <br /> 8 MAPE/r <br /> G R O U P <br /> Copyright©2021 by Polyglass U.S.A.,Inc.and all rights are reserved. www.Polyglass.us <br /> Edition Date:08/21 •Doc#ElaatoFlex 56 <br />