Laserfiche WebLink
Xi2 Concrete Parts Detail <br /> Part#59307 Xi2 Concrete <br /> Includes: 5' Strut, Bracket, & Hardware Kit#59315-1 5y5tem <br /> with all nuts and bolt. <br /> Longitudinal Struts for — <br /> "Concrete Systems" <br /> Part No. Length Pier Height <br /> #59013 44" up to 4 Blocks <br /> #59015 65" up to 6 Blocks ; <br /> Longitudinal Hardware Kit <br /> Part#59263 A <br /> Includes 2 sets per kit: I-beam bracket, nuts, <br /> bolts and washers <br /> Q� <br /> Lateral and Longitudinal Combination <br /> Part#59332 Longitudinal <br /> Includes: 5' Strut, Longitudinal Strut(#59364), strut Concrete Longitudinal <br /> Lateral and Longitudinal Hardware Hardware Kit <br /> Kit with all nuts and bolts. <br /> For Double I beam Attachment use: me <br /> 59352 Double Beam 59329-4 Double Beam Lateral Concrnal ete kit <br /> t end of Nv <br /> Nut&Washer <br /> Seam Clamp <br /> Bracket <br /> J-Bolt s <br /> Figure 1 <br /> b� <br /> Lateral o, _ <br /> o ° <br /> Longitudinal ; <br /> - - - - - - --L - - -L - - <br /> 1-Beam <br /> Xi2 Installation Placement Page 5 of 6 <br /> TIE DOWN 404-344-0000 www.tiedown.com <br /> 605 Stonehill Drive SW, Atlanta, GA 30336 <br /> MANUFACTURING INGENUITY <br />