Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 9/23/2016 Letter Unassigned Expired,respond by 10-24-16 <br /> Notes: <br /> 9/28/2016 9/28/2016 Permit Extension CINDY BERGSMA Extend to 8-27-17 <br /> Notes: <br /> 5/19/2017 12/12/2018 Consultation KURT KECK Work in progress <br /> Notes: <br /> Recall when ready for next inspection <br /> 8/23/2017 8/23/2017 Consultation KURT KECK Approval Work in progress <br /> Notes: <br /> 6/15/2018 6/15/2018 PERMIT EXTENSION TAWNYA APPROVAL CHANGED EXP DATE TO 12/08/18 <br /> HERMAN <br /> Notes: <br /> 12/10/2018 12/10/2018 PERMIT EXTENSION TAWNYA APPROVAL <br /> HERMAN <br /> Notes: <br /> 6/3/2019 6/3/2019 PERMIT EXTENSION CINDY BERGSMA APPROVAL SEE NOTES <br /> Notes: <br /> OWNER THOUGHT IF HE TURNED IN REVISIONS IT WOULD EXTEND PERMIT....THAT IS NOT THE CASE...TOOK THAT AS A REQUEST DUE TO HE <br /> SUBMITTED NEW REVISIONS. <br /> 11/26/2019 11/26/2019 BLDG 11- KURT KECK PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> PM inspection requested <br /> Daniel:425-931-7447 <br /> (11/26/2019 3:58 PM KMK) <br /> Re basement: <br /> North side pony wall OK to cover. <br /> Note:obtain all rough in approvals for plumbing mechanical and electrical before cover. <br /> 4/24/2020 4/24/2020 BLDG 10-INTERIOR KURT KECK PARTIAL Basement perimeter walls ok to cover <br /> SHEAR APPROVAL <br /> Notes: <br /> 10/22/2020 10/22/2020 PERMIT EXTENSION KATHY COLLISON EXTENSION COVID EXTENSION <br /> APPROVED <br /> Notes: <br /> I <br /> Printed: Monday,01 July, 2024 3 of 7 rk <br /> SUPERION <br />