Laserfiche WebLink
LUCAS SITE VISIT I July 18, 2024 SDA Job# 10052 ' 4 <br /> SEISMIC DISTRIBUTION FOR:Al-WSW, R=6.5 <br /> 1) YV hei ht FV x height REDISTRIBUTE: E( 1 <br /> EV ROOF = 1217lb 15 18262lb 1611 lb <br /> IV 1 ST FLOOR = 1333 lb 8 10667 lb EV x height x IV TOTAL = 940 lb <br /> TV = lb lb ZV x height TOTAL <br /> TV = lb lb <br /> BASE SHEAR= 2551 lb 28929 li) <br /> BASE SHEAR= <br /> BASE SHEAR= <br /> BASE SHEAR= <br /> UNFACTORED LOAD SUMMARY: <br /> LEVEL WIND SEISMIC <br /> (Ft-Rr) I (Lt-Rr) A15-WSW �_ I <br /> FV(Rooi = 1016 Ibs 1420 Ibs 1611 Ibs <br /> FV(2nd Floor)= 2144 Ibs 2688 Ibs 940 Ibs <br /> NOT APPLICABLE <br /> NOT APPLICABLE <br /> TOTAL BASE SHEAR= 3160 Ibs 4108 Ibs 2551 Ibs <br />