Laserfiche WebLink
Keenen and Mavil Lucas <br /> Plan Check Number: B2112-050, First Building Review <br /> March 13, 2022 <br /> Structural <br /> 1. See Section A on Sheet 3. The ridge board specified on the plans is a 2x6. A new ridge board <br /> should be specified not less than the cut end of the rafter per Section R802.3. N Ml Al <br /> 2. See triple joist on the Main Floor Plan on Sheet 2. A 1200-pound hanger is specified at the <br /> r same location a column cap is specified for the new post and existing beam. Plans should <br /> provide a detail of the connection. Plan should provide the make and model of proprietary <br /> hardware. R106.1.1 1�0- � r 2 <br /> 3. See Wood Stair Detail on Sheet 3. The stair detail provides an intermediate support for the <br /> stair stringers, but the Main Floor Plan on Sheet 2 does not show the location of the <br /> intermediate support. Plans should be updated to show the intermediate beam support and <br /> footing. SL Sd-IT -? <br /> 4. See Gusset Detail on Sheet 3. Detail should show location and spacing of nails. Nails should <br /> have the appropriate edge and end distances. See 2018 NDS for more information. Sc-C GA-1 SSE7 <br /> v4t:-rA l L <br /> 5. See Detail 2 on Sheet S-1.0. The Simpson MPB44Z Post base appears to require a side cover of <br /> 4 inches minimum and additional reinforcement per the ICC-ES Evaluation Report ESR-3050 or <br /> per Simpson catalog. t)�_7-7/A-I L Z oN S S.- <br /> 6. See Section A on Sheet 3. It appears the floor joists sit on a 2x6 ledger. The ledger connection <br /> should be specified on the plans. R102.7.1, R106.1.1 vee� CeDOIF9 gE51-p�j(- ate S <br /> 7. Structural special inspections may be required for this project (shear wall nailing closer than 4 <br /> inches). A statement on special inspections has not been provided and should be provided on <br /> the r!ans. The statement should include a table listing each type of special inspection and <br /> should specify the extent of each inspection (e.g., continuous, periodic) per IBC Section <br /> 1704.3.1. The table should include special requirements for seismic and wind resisting systems <br /> as required by IBC Sections 1704.3.2 and 1704.3.3, respectively. See IBC Sections 107.1, <br /> 1704.2.3, 1704.3, Table 1705.3. SfC c--(A-C- J t- —/Ar'PDEfD <br /> ors si�-t S. 1.3 <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Rakeeb Khan <br /> Residential Plans Examiner <br /> (425)257-7299 <br /> rkhan@everettwa.gov <br /> S:\RKhan\2022\B2112-050_Rl.docx <br /> 3200 Cedar Street 425.257.8810 everetteps@everettwa.gov <br /> Everett, WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 3 of 3 <br />