Laserfiche WebLink
7� i <br /> a0'-0" V <br /> Ua n S <br /> l�= x w3 <br /> U �1 <br /> L _ <br /> SLAB-ON-GRADE _ <br /> STOOP m <br /> m <br /> R <br /> t-. <br /> — - — <br /> VS------------ <br /> STUB OUT <br /> REBAR 18" <br /> (3 PLACES) <br /> rlrrI� s: <br /> I I I 1 z� <br /> Sol <br /> TYR Czt, <br /> l ` I <br /> 2 0" 4'-3i:'---`-4'_3" 5'4YzTF �) <br /> TYP <br /> Q O0 <br /> S07 , <br /> sass 4„4" <br /> 18 ,8 2a( Or Q Or ? <br /> L_J L _J <br /> ri <br /> I I <br /> aY' 4 3 <br /> ir <br /> L®�w I _D•�a._ �_ I I <br /> — —— LLl <br /> I I I I ,pT — —P1-- U <br /> r do a J < <br /> ND I I <br /> 5 O Z <br /> O <br /> I j I I <br /> ---'"1 1B 19 �\\ I So <br /> � l z <br /> I r—r r <br /> WW <br /> I J <br /> ® ® I I ® I I ® I I I I i <br /> L J I SLOB-ON-GRADE I J W <br /> _ __ L _J PER PLAN NOTE, m <br /> ALL FRAMING OR HARDWARE I '-0" 3' ' 4'-1%' 2-0 (ELEV VARIES) <br /> NOT SHOWN OR SPECIFIED <br /> TO REMAIN UNCHANGED 1'Oy" <br /> -- Go <br /> ~ I <br /> STUB CUT - - I - <br /> REBAR 18" s L l ` STUC OUT STEPuj <br /> (3 PLACES) - - REBAI�18� <br /> I (3 PLACES) I - W <br /> L-� FSTEP--J '1 o I STEP I -.1 - I I o W <br /> - -_l_ l m J a ATTACH 2x PORCH 4SLAB <br /> 1 OLS ab-on--10 aP�shall be 4'th'Gc Si- �S-n'n Granular Fill LL <br /> L — 4 N NQTES <br /> STL - I l2 bsh I—�reCover r a perGeoletlinWlRepotl seeAra,ne��ral Q <br /> T —{- - DIRECTLY TO PORCSTEP D WIpfJS f3f Slab Dovbtlon Depression and Slope repo(L -- -- -----J2 ConstruclonlConlrol Jo 1t'n Slabs are optonal but recon entledto controlcrackng When usetl slab areas between joistsshall---PER 12/S07 beapprox mately squareand 400 sf or less <br /> - -- - J <br /> a. TheoC mgm or shall delerm ne-wal footng elevaro x bAe6 On rig gfadeS alld SIIB C0 djtj&I)8 BOtl3(110f FOollh s stlall be Sol on co npelent properly graded beadng sql below Frost Depth. 9 Z <br /> li IL L48 CIN-GRADE 7I�' <br /> ' a Hnchor Bolts for Exterior Stud Walk shall be 1n accordance with Pi£of the Shear Wall Schedule of 1iSO6,u.o.n. �nD <br /> 2'_9" I J D _-'._' PORCH J --- V <br /> rl -__ - - 2'-s" SLAB-ON-GRADE 5. See,pIS06(Of Slmpgpp 1p USP 118ftlWdlE C90VEf5100(881e. U,eTrneN�xFokerawaLL <br /> 1 PORCH <br /> DIRECTLY TO PORCH SLAB HD S07 <br /> 1 ht:R 12/S07 4aY, REFER TO ARCH'L SECTION <br /> D3814 FOR FRONT PORCH LEGEND <br /> __._. _.SO7 saYd'— FOUNDATION GQNSTRWGTION <br /> -----i(cf ER 1-Af tCH'L SECTIo:d <br /> - -2'-IU%,'4-- 9'S -- Cd8/4 FOR FRONT PORCH <br /> F0L)NCA1 ION CONSTRUC-:Il't: SX.X DETAIL CALL-OUT <br /> _EXTENDED FRONT PGkl 30'-0" <br /> i-X ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/SO6 <br /> ;l7 OP I IC11V-�L�1/,'g' � k <br /> SLAB-ON-GRADE PER PLAN NOTE' <br /> i � I <br /> FOUNUAI ION WALL m <br /> 1 RAISED FOUNDATION WALL � <br /> C� BEARING OR SHEAR WALL ABOVE a <br /> ry <br /> Q N <br /> CRAWL SPACE POST BELOW � <br /> -FOOTING CALL-OUT SEE 5YS07 w o <br /> W <br /> K <br /> STEP STEP TOP OF STEM WALL <br />