Laserfiche WebLink
W <br /> U' S` <br /> I, <br /> 62 a LL= x <br /> a <br /> �F <br /> my <br /> z <br /> r T.I <br /> � '4 <br /> -- ='-U <br /> I I I <br /> LL <br /> I. W <br /> LL <br /> — l — -- -- —.. —_ W <br /> U <br /> 1 s� <br /> 9 Q <br /> III I I so9 1 <br /> Z <br /> I <br /> I H <br /> RDWARE ALL FRAMING OR HARDWARE <br /> z Q <br /> CIFlED $07 - NOT SHOWN OR SPECIFIED z <br /> - 1NGED - - - TO REMAIN UNCHANGED J <br /> W W <br /> I I <br /> li' a <br /> I <br /> I i <br /> I <br /> L <br /> W <br /> z W <br /> > <br /> j s O W <br /> SU7 se FOUNDATION PLAN NOTES LL. <br /> - — - L_ ___ _ 1O 1 Slab-on Grade shall be 4'th Slab shall be poured over Free Dra n ig Granular F19 per Geolechnical Report See Architectural O <br /> ——— ——— —— -- 2. Drawings <br /> on/Con-i tlo nt r Slabs are optional nd Slope regwrem d iii } <br /> W approximately square and 400 sf ar less s to s <br /> 4 _ ~ <br /> , but reconutKntletl m control cracking.Whe t used lab areas betwee t is Shall <br /> 3 an coCmpelenl rprlopedy graded beat rg soil be m on Depth o'final gratles antl site Condit—it B.t om of Foobngs shall be set Z <br /> ——— ^ <br /> LL O <br /> 4, Anchor Bulls for Ealerior Stud Walls shall be in accorclance w,lh P1-d of the Shear Wall Schedule of IISO6, <br /> 5. See 10/S06 for Sampson to USP hardware conversion table. O <br /> EXPENDED GHRAGt 3-CAR GARAGE OPTION-ELEV.'B' LL <br /> LEGEND <br /> XX � <br /> X DETAIL CALL-OUT <br /> FP- ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/506 <br /> L� ad <br /> SLAB-ON-GRADE PER PLAN NOTE I <br /> m <br /> LOJ FOUNDATION WALL N <br /> RAISED FOUNDATION WALL <br /> Ef <br /> _ W <br /> —� BEARING OR SHEAR WALLABOVE rl <br /> L N <br /> G N <br /> CRAWL SPACE POST BELOW O <br /> I <br /> O FOOTING CALL-OUT SEE 5/S07 y <br /> Y <br /> STEP STEP TOP OF STEM WALL <br /> I <br /> 0 1 2 4 8 16 <br /> S02.1 B(M) <br />