Laserfiche WebLink
U <br /> 0 E, i <br /> UJ <br /> -j <br /> well <br /> T. <br /> co <br /> 2'-0" <br /> LU <br /> F-- —J— <br /> Oz <br /> 0 <br /> (jj F- <br /> FALL FRAMINEOR HARIOE I ALL FRAMING OR HA DWARE <br /> L�'OT SHO�N OR SPECIFIE" NOT SHOWN OR SPECIFIED ��O7 <br /> UNCHANGED TO REMAIN UNCHANGED Uj <br /> Uj <br /> LU <br /> O > <br /> w <br /> 6-0"�Z-6'xl) Hic, FOUNDATION PLAN NOTES: Ll- <br /> 5�0"W'-"'X-12'�TTHICK..� S— Gras shag -4"thick swsi 'h,,caIReV-see-Achteiaunal z <br /> FOOTING W/#4 Q 1 U.,. -0, FOOTING W, a 1 lag7ol @Fbe poured over FreeDra ning ranularrCWrGeouic orF 0 <br /> Drawings for Stab Elevamon,Depresition,and Slope reb-a—ma. <br /> EA.WAY B0:TTOM EA.WAY,BOTTOM 2. C,,stru,ti,,/C,nt,ol Joint in Slabs are opti..1 but r— d,:,di.—trol—king.When d..d,.IaIbareas bahveennist-h.11 < < rr <br /> he pp—in,..Iy square and 400-0 of less 0 _j <br /> 3. - 11 Z <br /> TheContract r shall determine amal footing elevations based on final grades and she,bnditlorr�.Botton,.fF..1 9, be at <br /> Af F 4 on—Patent,property graded bearing soil be—Frost Depth. 0 <br /> 4 Anchor Bolls for Exterior Stud Walls shall be in a—manot,-h P1-13 of the Shear Wall Schedule of IiS06, n. <br /> 0 <br /> 2—L— 5. See 1 O/SO6 for Simpson to USP hardware mn,ersion table. 0 <br /> A U— <br /> LEGEND <br /> 3-GAR GARAGE OP EXTENDED GARAGE OPTION ELEV.'D' <br /> DETAIL AL-UT <br /> ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 11S06 <br /> PER P—NOTE 1 <br /> FOUNDATION WALL <br /> RAISED FOUNDATION WALL LE <br /> w <br /> BEARING OR SHEAR WALLABOVE <br /> 1.1-SPACE 1.1 BELOW <br /> FOOTING CALL-OUT SEE 51S07 <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 4 8 16 -S02.1 D <br />