Laserfiche WebLink
J <br /> F� <br /> j0 <br /> LU >z <br /> 0 <br /> fCa �z <br /> Uo a N <br /> S w <br /> o~ <br /> ma <br /> m <br /> m <br /> ag <br /> I I <br /> I I I W£ <br /> I I I <br /> i I I I I <br /> I I <br /> T. <br /> I I I� n of asyi <br /> 65fi6 <br /> bill E�' �y`V <br /> 1Srcrty,C+fD� <br /> I I I I <br /> Cc Ur <br /> 0., 2'-B„ <br /> W <br /> z U <br /> Z <br /> O <br /> I rn <br /> I , <br /> 1 I ALL FRAMING OR HARDWARE 1 I J <br /> ALL FRAMING OR HARDWARE 507 T NOT SHOWN OR SPECIFIED S07 W <br /> NOT SHOWN OR SPECIFIED - - <br /> TO REMAIN UNCHANGED TO REMAIN UNCHANGED <br /> I I j <br /> m <br /> I I <br /> W <br /> I C� W <br /> I : FOUNDATION PLAN NOTES. <br /> 5-0"%2'-6"X12"THICK�\ S S-0'x2'-6"x12"THICK -_-_ I Slab on-ra poure ramm Granular I eetechncal ee Arc tectural �+� O <br /> FOOTING W/N4 Q 10'oc — SD7 FOOTING WI 04010- r J I Drawn for SlabaElevation,h De S eb snau d d over F ee g per eport <br /> `\r ——— ,-___I EA WAY,BOTTOM _ 9sDepression and Slope requ renf?(Il5 <br /> EA.WAY,BOTTOM _I —- — I �_ <br /> - I � 2. ConstruclioNConVd Jam in Slabs are optional but recommendetl to comrol ctacking When usetl slab areas between jo sts shall <br /> —— ——— o — —T ———— be approi malely square and 400-sf of less, � 1 <br /> _J <br /> 3. The Contractor solo propedetermine <br /> y gn ne aclualgf000fng elevat ons basetl on Flnal gratles and s le wndl ons.Bottom of Footings shall be sal f'\ Z <br /> Y � 1.1. <br /> an com t t I graded bear n I below Frost Deplh. a� O <br /> a on. <br /> 4. Anchor Bolts far Exterior Stud Walls shall be n ccortlance w ih P1-6 of the Shear Wall Schedule of i1S06,u. {- <br /> - <br /> 1D/ 6. See 101506 for Simpson to USP hardware conversion table. Q <br /> 3-CAR GARAGE OPTION-ELEV.'B' EXTENDED GARAGE OPTION-ELEV.'B' LEGEND <br /> sx:x <br /> DETAIL CALL-OUT <br /> ------------ - � ANCHOR BOLTS FOR SHEAR WALL A,.OVE PER SCHEDULE OF i1S06 <br /> SLAB-ON-GRADE PER PLAN NOTE 1 <br /> _ `m <br /> L FOUNDATION WALL t9 <br /> z <br /> RAISED FOUNDATION WALL W <br /> U_ <br /> 0 BEARING OR SHEAR WALL ABOVE <br /> at <br /> CRAWL SPACE POST BELOW � <br /> %X FOOTING CALL-OUT SEE 1IS07 <br /> K <br /> STEP STEP TOP OF STEM WALL <br /> 114"0'.0" <br /> 0 1 2 4 8 i6 S02.1 B <br />