Laserfiche WebLink
0 <br /> �o <br /> W iZ <br /> 30 <br /> O x <br /> ¢'s Ud z <br /> OF a� <br /> 4X w3 <br /> U �J <br /> a ww <br /> (�xx <br /> (~'rN <br /> m <br /> s soT sSH�TA�J -- FW� C73A" <br /> �II zT. <br /> t = <br /> I I I <br /> a l i as <br /> I a - I ! of s,y, <br /> -ti f� 4•C <br /> PeT <br /> I I I I I x <br /> I I I <br /> I I ,o•-o° I <br /> F- <br /> - 2'-0" W <br /> LL <br /> W <br /> i <br /> I I I I i <br /> z <br /> F— <br /> I <br /> S07 ALL FRR�MING OR HH MARE , ALL FRAMING OR HARDWARE W <br /> NOT HOWN OR IED J <br /> - 70 REMAIN IJPP: D S07 NOT SHOWN OR SPECIFIED <br /> rq I�- - i. TO REMAIN UNCHANGED �_r�r W <br /> I I I <br /> I I I <br /> I I <br /> I I I I <br /> I I I <br /> W <br /> I I <br /> L. <br /> 5'-0"x2'-6"x 12"THICK I W <br /> 3 5'-0"x2'�"xi2"THICK FOUNDATION PLAN NOTES. <br /> FOOTING W/84@10"oc S07 FOOTING W/#4 1. Sla-on Gra eshall befit Ie snarl be raining Granular rper eotechniwl epos.See Arcnitedural �� O I——— EA WAY,BOTTOM I L _ �� @,0"oc c. a poured over Free <br /> _ — EA.WAY,BOTTOM Drawings for Slab Elevation.Depression and Slope requirements <br /> 2. Construction/Control Join,n Slabs are optional bUl recommended to control cracx ng.When used slab areas between joists shall <br /> `o be approximately square and 400-sf or less. <br /> g L-- -- L--__ —� cJ <br /> y U <br /> N — - 3. The C.htm4.r shall determine actual foot ng eleval ons based on final grades and Site Conditions,Bottom of Footings shall be set Z <br /> IVY" iD� �. See or Bolt for ailed Walls <br /> below Frost Depth. O <br /> r .,patent,property graded g soil <br /> Pr------ <br /> L- J 4. Anchor Bolls for Exterio Stud Walls shall be in accordance with P1-6 of the Shear Well Schedule of t/S06,u.o.n. <br /> P7-s _J � U <br /> I Y" 8'-3" Simpson to USP hardware conversion table. Q <br /> XTENDED GARAGE OPTION-ELEV.'A' 3-CAR GARAGE OPTION V" <br /> ELEV.'A' LEGEND <br /> xx <br /> SX.X DETAIL CALL-OUT <br /> 1®- ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/S06 <br /> SLAB-ON-GRADE PER PLAN NOTE 1 F <br /> do <br /> r01 FOUNDATION WALL do <br /> � RAISED FOUNDATION WALL � <br /> K <br /> W- <br /> BEARING OR SHEAR WALL ABOVE 4 <br /> H N <br /> N <br /> CRAWL SPACE POST BELOW � <br /> XX FOOTING CALL-OUT SEE 6/S07 w o <br /> lY <br /> STEP STEP TOP OF STEM WALL <br /> 16 M9.1A(M) <br />