Laserfiche WebLink
UG = wN <br /> )l <br /> W S <br /> co <br /> x= <br /> mm <br /> s <br /> r <br /> C7-a.3 <br /> �s <br /> Cr, <br /> W��f <br /> L'uLawu,r1"� <br /> I a T W <br /> 0 I -- <-- <br /> r <br /> OZ <br /> o <br /> h� W <br /> J <br /> W <br /> I I I m <br /> TO REMAIN Ill CHAIJI r III ' ALL FMING OR NOT REMAIN OR <br /> SPE CIFIED <br /> NOT bNOVVfJ )I AkD L I <br /> I <br /> W <br /> 1 z W <br /> I <br /> 0 W <br /> FOUNDATION PLAN NOTES Z/ LL <br /> 0 <br /> { 1 SWb-on Grede shall 4 Ih k.blab shall b d F D a" f'ranur II Report.See Q SUr;' V' Draw 1gs for Slab Elevali D p tl S�prequirements. g I Per Geofechniwl Re R. ArchitncWral <br /> J 2 Construct onlConlrol Joint-n Slabs are optional but recommended to wnlrol crackin When used slab areas bal to sts shall <br /> NL --- <br /> — ` I be approximately square and 400 sf or le g Q J U <br /> I ---� ----- z <br /> 3. The Contractor shall determine actual foot ng MevaSons based on final grades and one conditions.Bottom of Footings shall be set Z <br /> r on wmpetenl properly graded bear 1g so below Froat Depth O <br /> 4. Anchor Bulls for Exterior Stud Walls shall be in accordance with Pi-6 of the Shear Wall Schedule of 1ISU6,u.o.n. H <br /> 5. See 10/SO6 for Simpson to USP hardware wnvera on table. 0 U <br /> LL 0 <br /> LEGEND <br /> 3-GAR GARAGE OPTION_Ei_L:�, EXTENDED GARAGE OPTION-ELEV.'B' xx � <br /> SX.X DETAIL CALL-OUT <br /> ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF VS06 <br /> Q <br /> u SIAB-ON-GfiADE PER PLAN NOTE 1op <br /> k <br /> op <br /> LOJ FOUNDATION WALL y <br /> ti <br /> —?_ RAISED FOUNDATION WALL � <br /> BEARING OR SIi F-AR WALL ABOVE 4' <br /> w o <br /> o a <br /> CRAWL SPACE POST BELOW N <br /> XX FOOTING CALL-OUT SEE 5/S07 w <br /> U <br /> STEP STEP TOP OF STEM WALL C <br /> 0 1 2 4 8 16 S02.1 B <br />