Laserfiche WebLink
W _ <br /> o z -- <br /> �N <br /> W � S <br /> G <br /> VO _I, <br /> >I ; 4 <br /> W� <br /> LJ <br /> a T. <br /> c- <br /> a, <br /> rn ry <br /> �S{Y <br /> � bE yq�ASyi r <br /> `U <br /> is,. <br /> ENr'��T <br /> ZL.1.111 <br /> y:° oo LL <br /> 10`D" <br /> LL _j <br /> al �I W <br /> 2-1" Ur <br /> ———— <br /> r F— <br /> jl r------- --� I ----- `'� Q <br /> Z <br /> =o I ? O O <br /> j� q II <br /> J H mop Q <br /> j l W > <br /> A <br /> W <br /> 7 J II j `tili'i� sm W <br /> ` I I <br /> ALL FRANIING ON �.= - I ALL FRAMING OR HARDWARE <br /> SHOWN ON SPECIE II a I <br /> TO REMAIN UPICFill NOT SHOWN OR SPECIFIED <br /> L—_ TO REMAIN UNCHANGED <br /> ILL <br /> z W <br /> > , <br /> Q W <br /> I 3 FOUNDATION PLAN NOTES: <br /> 1 abron Grade She ba 4 ihRk.Slab shall be poured over F D-' <br /> I I S07 _ 30 Draw nys for Slab Elevation Depression, F ss on and Slopn rnyu'a t. <br /> g ranu ar rper Geotechri cal Report S Ar liifedural <br /> — Q Z <br /> L , 2 Co tslruct onlControt Joint in Slabs are-01-lal but recomme tded to control cracking.When used slab areas betwee t leists shall ` " O <br /> be apP-11nately square and 400-st or leas. <br /> ------ --- Q J <br /> 3 Th.Contractor shall deterrn7 actual footing elevaaons based on final j grades and site contl t ons Bolt—of Foounys shall be sat on competent,properly graded bearing soil below Frost Depth z Z' <br /> —————— 9 Anchor Bolts for Exterior Stud Walls shall be in accordance rith P1-6 of the Shear Wall Schedule of 1IS06,u.o.n. Q <br /> 1°Y2 8'-3" 1Dyi 5. See 10/S06 for Simpson to USP hardware conversion table. (� <br /> 0 of <br /> LEGEND _ <br /> ----- -- <br /> ---- <br /> EXTEND'=D G.-,RP.GE OPTION-'-;- 3-CAR GARAGE OPTION-ELEV.'A' � <br /> SX X DETAIL CALL-OUT <br /> ANCHOR BOLTS FOR SHEAR WALL <br /> ABOVE PER SCHEDULE OF I/SO6 <br /> SLAB-ON-GNADE PER PLAN NOTE 1 <br /> FOUNDATION WALL <br /> rn I <br /> r <br /> RAISED FOUNDATION WALL � <br /> C <br /> BEARING OR SHEAR WALL ABOVE n <br /> F N <br /> CRAWL SPACE POST BELOW p <br /> OFOOTING CALL-OUT SEE 6/S07 W o <br /> K <br /> 1- <br /> STEP STEP TOP OF STEM WALL <br /> tra°=ro' 0 1 2 4 e 16 S02.1A(M) <br />