My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9536 7TH AVE SE 2024 Plans 2025-09-16
>
Address Records
>
7TH AVE SE
>
9536
>
Plans
>
9536 7TH AVE SE 2024 Plans 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 9:23:01 AM
Creation date
9/16/2025 9:21:14 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9536
Permit
B2403-082
Year
2024
Notes
NEW SINGLE FAMILY HOME-RB2306-001 THELON-CHELSEA HEIGHTS 41
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMBER <br /> STUD-NAIL <br /> — � SHEATHING TO EACH <br /> MEMBER w/HALF OF <br /> SHEATHING NAILS i <br /> I� f�TO EACH MEMBIER W)HALF OF <br /> To E STUD-NAIL SHEATHING SOLID BLOCKING BELOW LIJ <br /> TO EACH MEMBER w/HALF OF SHEATHING NAILS j <br /> SHEATHING NAILS BUILT-UP STUDS E J STRAP HOLD DOWN <br /> PER PLAN NAIL STRAP STRAP HOLD DOWN PER PLAN <br /> OVER SHEATHING Us ` N <br /> STRAP HOLD DOWN PER PLAN WRAPPED AROUND BEAM- _ W S <br /> NAIL STRAP OVER SHEATHING O g ?.Y <br /> WRAPPED AROUND BEAM- LL- <br /> NAIL STRAP OVER SHEATHING -_�I- <br /> ___. - SOLID BLOCKING BELOW Q a <br /> _________________________ W W <br /> BUILT-UP STUDS <br /> r <br /> m0 <br /> -------------------- <br /> _ m <br /> --— "-1 ---- --------- ----- <br /> BEAM PER PLAN <br /> w} <br /> `J 19 BEAM PER PLAN 18 17 <br /> 16 <br /> 2x4 BLOCKING u" <br /> UA <br /> DIAPHRAGM BOUNDARY <br /> NAILING <br /> FACENAIL PER 11806 <br /> 2x4 BLOCKING DIAPHRAGM BOUNDARY I.t <br /> NAILING <br /> DIAPHRAGM BOUNDARY - <br /> ' NAILING FACENAIL PER 1/S06 2.4 BEVELED BLOCKING e o <br /> SQUASH BLKG UNDER DIAPHRAGM BOUNDARY w/(2)ROWS 12d @ 6"oc <br /> 2x4 LEDGER EA.SIDE W/12d POSTS/BUILT UP STUDS 2X4 LEDGER w/(2J ROWS NAILING <br /> FACENAIL @ 6"oc TO BEAM (MATCH AREA) 12d @ Woc o �` <br /> `SYgawt.l> <br /> '-- SHEATHING PER PLAN SHEATHING PER PLAN <br /> 12d TOENAILS @ 6"oc (�1 <br /> JOISTS PER PLAN 00 <br /> LL <br /> JOISTS PER PLAN ROOF TRUSSES O <br /> PER PLAN JOISTS PER PLAN / MONO TRUSSES PER PLAN <br /> 2x RIM BOARD W/12d L <br /> TOENAILS @ 6"oc HANGERS PER PLAN- f <br /> DROPPED BEAM PER PLAN 2.BLOCKING @ 48"oc il <br /> W/FLOOR SHTG EDGE FLUSH BEAM PER PLAN HANGER PER TRUSS MFR > <br /> NAILING Z w <br /> SEE 1IS08 DROPPED BEAM PER PLAN J <br /> 15 14 FON COMMONS 13 12 11 w <br /> - W m <br /> T Q <br /> FACE NAIL PER 1fS06- .i. <br /> DIAPHRAGM BOUNDARY DIAPHRAGM BOUNDARY <br /> NAILING NAILING <br /> _ 2.BLOCKING <br /> 2X4 BLOCKING EA.SIDE Wf 12d 2x BLOCKING <br /> FACENAIL @ 6"oc TO BEAM SHEATHING PER PLAN <br /> SHEATHING PER PLAN—� <br /> -- <br /> W <br /> w <br /> W <br /> 1 <br /> / JOISTS PER PLAN SHEAR WALL EDGE NAILING JOISTS PER PLAN \�—SHEAR WALL /'► W <br /> / I i EDGE NAILING V J � <br /> BEAM PER PLAN � �_ HEADER PER PLAN L_ <br /> A36 EA.BLOCK A36 EA.BLOCK <br /> — (WHERE OCCURS) HEADER PER PLAN <br /> PUS r CAP PER PLAN --� ' 2x STUD WALL PER PLAN / (WHERE OCCURS) <br /> CONT.TOP PLATE CONT,TOP PLATE <br /> (SPLICE PER 18/506) (SPLICE PER 18/S06) ~ 2X STUD WALL PER PLAN U <br /> SHEATHING PER 1/S06 W Z <br /> SHEATHING PER 1/S06 Q <br /> DIAPHRAGM BOUNDARY <br /> _ ! NAILNG <br /> SO DASH BLK'G UNDER DIAPHRAGM BOUNDARV <br /> POS NAILING <br /> TS/BUILT UP STUDS(MATCH AREA) SQUASH BLK'G UNDER <br /> l',L DIAPHRAGM BOUNDARY POSTS/BUILT UP STUDS <br /> NAILING 12d @ 6"oc TO RIM (MATCH AREA) 121 @ 6"oc TO RIM <br /> SHEATHING PER PLAN SHEATHING PER PLAN k <br /> 12tl TOENAIL @ 6"ac — SHEATHING PER PLAN <br /> SHEAR WALL EDGE NAILING �\ SHEAR WALL EDGE NAILING <br /> FLUSH BEAM PEi PLAN I A"fSPLICE SIEAIHING X— <br /> --�— SPLICE SHEATHING W <br /> JOISTS PER PLAN SHEAR WALL EDGE NAILING JOISTS PER PLAN SHEAR WALL EDGE NAILING q� l <br /> _ JOISTS PER PLAN HANGERS PER PLAN 2X RIM BOARD � HEADER PER PLAN HEADER PER PLAN <br /> WHERE OCCURS 2x RIM BOARDDROPPED BEAM 2x BLOCKING @ 48"oc ( J (WHERE OCCURS)PER PLAN FLUSH BEAM PER PLAN W/FLOOR SHTGEDGE NAILING 2x STUD WALL PER PLAN 2z STUD WALL PER PLAN <br /> CONT.TOP PLATE CONT.TOP PLATE <br /> (SPLICE PER laIS06) SHEATHING"PER 1IS06 (SPLICE PER 18/So6) SHEATHING PER 1/SO6 I <br /> S08 <br /> v 1 MMQN <br />
The URL can be used to link to this page
Your browser does not support the video tag.