Laserfiche WebLink
1-r2 <br /> �,rn <br /> w. --, <br /> O G <br /> n r_ <br /> UG W N <br /> LL w3 <br /> a ww <br /> z= <br /> co <br /> mm <br /> s <br /> I <br /> S <br /> W V <br /> w <br /> � i it loa I I•- � W <br /> L' .i U' <br /> - - 2-0 I Pi. <br /> I I I <br /> z � <br /> I J <br /> - - P1-6 O Z <br /> r 0 <br /> a I <br /> q I W <br /> I I L1J <br /> I 507 W <br /> At L l i ALL FRAMING OR HARDWARE <br /> PJTuL NOT SHOWN OR SPECIFIED I a <br /> TO REMAIN UNCHANGED - <br /> I <br /> I. I <br /> I I I W <br /> I z W <br /> ' I I w <br /> I 0 w <br /> FOUNDATION PLAN NOTES. lL <br /> poured over free Drawing Granular Fill per eolea-m cal Report See Arch tecfurdl Q <br /> 1 54iwmg,furSlabEllsVaIum cDk Slabshall d peregorements Z } <br /> Drawing press on and Slo <br /> Ui <br /> - -—————J 2 onstructioniControl! 1'n Slabs are optional but recommended to control cracking.When used,slab areas between to ets shall Th, V` <br /> - ' be approx marely square antl a00 sf or less. Q � U <br /> J ----- Z <br /> - —__ P1� 0 3 The Contractor shperty raged!actual footing elevations based on final grades and site condition,.Bottom of Foeling5 shall be se[ Z <br /> The <br /> properly graded bearing sail below Frost Depth, O <br /> 4. Anchor Bolls for Exterior Stud Walls shall be in accond—ce with PI of the Shear Wall Schedule of VS06,u.o.r,. <br /> b._,,. 5. See 10/S06 for Simpson to USP hardware conversion table. U <br /> 5.4, <br /> __-_ <br /> 1- <br /> LEGEND <br /> EXTENDED GARAGE OPTION-ELEV.'B' <br /> � DETAIL CALL-OUT <br /> SX.X <br /> P1-X ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF VS06 rr <br /> C <br /> SLAB-ON-GRADE PER PLAN NOTE 1 <br /> do <br /> L J FOUNDATION WALL <br /> H <br /> RAISED FOUNDATION WAIL <br /> Ir <br /> F— BEARING OR SHEAR WALL ABOVE a <br /> / f N <br /> CRAWL SPACE POST BELOW <br /> OFOOTING GALL-OUT SEE 5/507 W o <br /> K <br /> STEP STEP TOP OF STEM WALL <br /> 1 2 4 8 16 VOL. 1 B <br />