Laserfiche WebLink
C <br /> W <br /> f; <br /> �U <br /> W Ji <br /> a"11 o F-Z <br /> WZ <br /> VO R wG <br /> 4 <br /> U <br /> a w <br /> �m <br /> m <br /> r <br /> z�=7 <br /> �T-see <br /> — W U <br /> I L L <br /> is LU <br /> 1Y. <br /> 2--0" I _P1- _ <br /> 0 <br /> O z <br /> F— <br /> hH W <br /> W <br /> J <br /> soT I I � W <br /> _. <br /> ALL_Fk;,r d ALL FRAMING OR HARDWARE <br /> NOT tiH vl P:E I� <br /> OR SPECIFI TO fdt:✓ Iw a riff NOT TTO REMA ED SHOWN UNCHANGED <br /> W <br /> j <br /> I FOUNSTIDATION PLAN NOTES: O LL <br /> s 6F81rb A� slab sltalllte p d over a Oraniny Granular i6 p (ethnical R.I. ee Amhiteclural H Q <br /> Dhoem for Slab Elnvai on Da 7 a ys Depression,and Slope requireme tts � G. <br /> J ecommended to control cracking.When used slab areas between is shall <br /> 2 Cansttt cl on/Gonlrol Joint in Slabs are upl'onel but <br /> 1 joists 0 0 <br /> be appro%miummy square and 400 st or lase J <br /> - <br /> - - 0 3 The Contractor shall dy graded <br /> actual footing b el,Frost based on final gates and Site conditions.Sodom of Foolings shall be set Z <br /> on competent properly g2detl bearing soil below Frost Depth O <br /> 4, Anchor Bolls for Exterior Stud Walls shall be in accordance with PI-b of the Shear Wall Schedule of I/SO6,u.o,n. 0 <br /> ' L" 5. See 1 DIS06 tot Simpson to USP hardware oanvere on table. O _U <br /> L Q <br /> LEGEND Y)� <br /> yt GE OF EXTENDED GARAGE OPTION-ELEV.'A' D <br /> xx <br /> SX. DETAIL CALL-UUT <br /> ANCHOR BOLTS FOR SHEAR WALLABOVE PER SCHEDULE OF 1/S06 <br /> SLAB-ON-GRADE PER PLAN NOTE 1 <br /> FOUNDATION WALL h <br /> L---J <br /> RAISED FOUNDATION WALL <br /> K <br /> L� BEARING OR SHEAR WALL ABOVE lL <br /> W <br /> CRAWL SPACE POST BELOW <br /> 0 <br /> FOOTING CALL-OUT SEE 5/S07 <br /> rY <br /> J IT- <br /> STEP STEP TOP OF STEM WALL 0 1 2 4 8 16 S02.1//�1' <br />