Laserfiche WebLink
FOUNDATION PLAN NOTES. <br /> I. a�T b---G d- ra a shall be "thick.Slab shall be poured ovar Free Drain ng�—ar�i(I per�otechnical Report.Sae Archnshonmil N <br /> Drawings for Slab Elevation,Depreasion.and Slope requirements. ✓7 W <br /> 2. Construction/Control Joint in Slabs are optional but recominerWed to control cracking.When used,also areas between foists shall W <br /> be approximately square and 400-sf or leas. `O <br /> 3. The Contrador shall determine actual footing elevations based on final grades and site conditions.Bottom of Footings shall be set a"n Z <br /> on competent,properly graded besting soil below Frost Depth. U` <br /> G w <br /> 4. Anchor Bolts for Exterior Stud Walls shall be in accordance with P1-6 of Ina Sltear Wall Scl'aedule of VS06.u.o.n Ix z W s} <br /> U„ 5. See 10/S06 for Simpson to LISP hardware conversion table. Q ¢ w <br /> a =_ <br /> �r <br /> LEGEND dm <br /> 2pq., XX <br /> �r <br /> DETAIL CALL-OUT <br /> SLA&ON-GRADE 'ij19N� <br /> - STOOP YS 24 rpi-X ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/S06 <br /> VI - __- <br /> /- L J 2%" SLAB-ON-GRADE PER PLAN NOTE 1 <br /> �24 STUB OUT _u 2 a S <br /> ----REBAR 18" , FOUNDATION WALL w <br /> (3 PLACES) L———-) <br /> 0 IiAISEU FUUNDAI'IUN WALL Zi d <br /> - - - 0 8F-RING OR SHEAR WALL ABOVE z <br /> - <br /> I I I <br /> I I� CRAWL SPACE 1011 BELOW <br /> 1AjZw_ <br /> AS a <br /> FOOTING CALL-OUT SEE 5/307 ' .1�:' <br /> STEP STEP TOP OF STEM WALL <br /> I <br /> 18 18 18 ...6 <br /> N <br /> I <br /> � I I <br /> 00 w <br /> H <br /> W <br /> i <br /> l—J _j r< <br /> I I I Iw Z <br /> O_ <br /> I I <br /> - <br /> I— <br /> 6'-6Y," I <br /> Q <br /> I I I I W <br /> J <br /> I I I I W <br /> I I I I - <br /> I I I 1e to I I <br /> I I ® I I <br /> " 6'- <br /> I 2I-0 ,ryz,— 2'- F- <br /> I,. I <br /> W <br /> ALL FRAMING OR HARDWARE Z } <br /> I NOT SHOWN OR SPECIFIED I TO REMAIN UNCHANGED W <br /> _ Uj <br /> 1 LL <br /> I I HD HD z <br /> 83 <br /> STUB OUT I 24"MIN RAISED < I— <br /> O o O o NP REBAR 18" STEM WALL RETURN 1 <br /> STEP I ���� ��ny STEPI PO1^\5�T STEP (3 PLACES) STEP 1 J <br /> ---- L ^--- ' —J s� ---- L— ------ <br /> L -- O <br /> -- —� — --- --=— r— -----� Sr I— <br /> o� <br /> STUB OUT REBAR I <br /> 18"(3 PLACES) I 4 I � <br /> __ 1 ATTACH 2x PORCH io <br /> WALLS DIRECTLY <br /> L—,—T ------�_ TO PORCH SLAB <br /> G PORCH- 1 SLAB-ON-GRADE PER 12/S07 <br /> ARECTLV S07 _.: I <br /> 2CH SLAB PORCH <br /> cR 12/S07 <br /> REFER TO ARCH'L <br /> SECTION D38/4 FOR 1 SLAB-ON-GRADE <br /> FRONTPORCH S07 PORCH <br /> FOUNDATION <br /> CONSTRUCTION REFER TO ARCHT ob <br /> SECTION D38/4 FOR rn <br /> FRONT PORCH <br /> 2'-SYi' FOUNDATION <br /> CONSTRUCTION w <br /> oL <br /> EXTENDED FRONT PORCH OPTION-ELEV.'A' w g <br /> 0 <br /> co <br /> 0 7 [ d 8 76 <br /> S02A(M) <br /> I I � <br />