Laserfiche WebLink
I <br /> 0 <br /> ul <br /> ca <br /> Lq r >c <br /> ❑ 2 ='- <br /> �� o �z <br /> ' U = <br /> n <br /> IO�L w <br /> U y <br /> 30'0" ss J <br /> a <br /> 17'-0" 13'-0" mJ <br /> 2%i' mPp <br /> rO�Q- <br /> m�Q SLAB-ON-GRADE <br /> 24 Q STOOP <br /> r P1-6 rn <br /> -- — ---'---- <br /> C <br /> F-- --I I z <br /> STUB OUT <br /> REBAR 181, <br /> (3 PLACES) <br /> --- --- Pis -- - I s er- 1Br- 1 I <br /> as <br /> ————— <br /> -- ————— <br /> JL.}J L JJI I 2 j <br /> I I <br /> xn�o <br /> TTYP I I S07O', I I TYPtoQ� <br /> (jQ <br /> J L J L Jl I <br /> I I <br /> _ I F— <br /> I <br /> I I � <br /> o <br /> LLI <br /> r T I �L � <br /> ,I N <br /> Q <br /> I I 8 24 8 I m L— —_---J a v V <br /> L _ <br /> 777 <br /> P16 O z <br /> m 6'-BYi 13'-0" <br /> i v <br /> W <br /> LIJ <br /> I I I I 30 y <br /> ?o I I J b Z <br /> I I I I �� <br /> I I 1e 1a I I I I <br /> LIJ <br /> SLAB-ON-GRADE 2 <br /> PER PLAN NOTE 1 I S07 <br /> 2'0" 6'-5Yz' 2-0 (ELEV VARIES) - <br /> I I <br /> II I I PI � <br /> ALL FRAluuar 11 o I I Z <br /> OSHOWN 11 r am LU <br /> TEMAINa HP , OLL. <br /> UJ <br /> FOUNDATION PLAN NOTES: <br /> T. Slab-on-Grade shall be 4 thick.Slab shall be poured over Free Draining Granular Fill per Geotachn cal Report.See Architectural O <br /> HD HD I Draw ngs for Slab Elevation Depression and Slop,requirements.rements <br /> 24'MIN RAISED I iir S'-3" <br /> N S - I 2. ConsbunionlConlrgl joint Slabs are opt onal but recommended to conVN cracking Nu unused used,slab areas between joists shall Q <br /> STEM WALL RETURN S I I - <br /> -J- I I FAI ', I I � rh, .,may �;i I I a„ I b,approximately square and 400.5(oNass. 1 <br /> STEP l PLACES tin `fEP iSpOw STEP Nod d'o� .STEP STEM STEP Z J U <br /> -- - 3 The Contractor shall determine actual footing elevations based on final grades and site conditions.Bottom of Footings shall beset <br /> pre graded bearing z <br /> pery gra g so below Rost OaPth. O <br /> 1 F <br /> vv1 i r — - 1 r --— — — _ ———————— —————————— —— J 4. Anchor Bolls for Exter or Stud Walls shall ben accordance with P1-6 of the Shear Wall Schedule of 11S06,u.o.n. <br /> iq s° t N 3 Q^ 5. Sea 101506 for Simpson to USP hardware conve lion able. y <br /> STU80UT REBAR sSO S07 S p1- <br /> C, 18,(3 PLACES) - Nov 5 PER co <br /> LL <br /> n ATTACH 2z PORCH 13/S07 LEGEND <br /> WALLS DIRECTLY - - - -- -ATTACH PORCH <br /> TO PORtI SLAB L <br /> -PEP 121S07 N-GRADE--- -- -_ - SLAB-O 1 xX <br /> S07 WALLS DIRECTLY <br /> ECTLY � <br /> _ PORCH Sx.x DETAIL CALL-OUT <br /> f— - TO PORCH SLAB <br /> l PER 12/S07 <br /> -- -'- / REFER TO ARCH'L P1- ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF VS06 <br /> f SLAB-ON-GRADE SECTION 038/4 FOR <br /> PORCH FRONT PORCH G <br /> SLAB-0.-GRADE PER PLAN NOTE 1 <br /> FOUNDATION <br /> REFER TO ARCH CONSTRUCTION m <br /> -- <br /> - SECTION 038l4 FOR LOJ FOUNDATION WALL rn <br /> FRONT PORCH <br /> FOUNDATION Ely, <br /> -- <br /> CONSTRUCTION '_--'- a""' -" 1'-3" 1'-11' RAISED FOUNDATION WALL <br /> 2'4Yz' n <br /> 0 30'-0" BEARING OR SHEAR WALL ABOVE <br /> EXTENDED FRONT PORCG 1 c <br /> CRAWL SPACE POST BELOW <br /> o <br /> O FOOTING CALL-OUT SEE S/507 W <br /> of <br /> STEP STEP TOP OF STEM WALL <br /> 0 1 2 a B 16 <br /> S02B <br />