Laserfiche WebLink
U2 y ¢E�� <br /> �5 <br /> z�j,w <br /> 6 <br /> T. <br /> sees <br /> elr� <br /> FLOOR FRAMING PLAN NOTES: <br /> 1, Floor heat i g a all ick 8G(Penal Span tiny 4$T24j with long d'nnans parpendlcular to snppoits.Glue STieatTil—ng <br /> to all Framing Members d Blocking below with adhesive conforming to A.P.A.Sip—ticatim,AFG-01.Faster Sheathing to <br /> Framing with D.1 31"0 x ZY"Nails or Simpson MV#94Y."screws as follows: <br /> Franning, <br /> co <br /> Il bounclares,Blocking L Struts J B"rml <br /> Al areas indicated as Blocked D"Pll provide 2x Flat Blocking(per General Structural Notes)at all Unframed Sheathing Panel <br /> Edges.Feeler,Sheathing to Framing and Blocking wild 0.131'0,2K"Nails or Simpson WSV#9x2Y:"screws as follows: LLJ <br /> Framing,Edges0 <br /> Framing, <br /> ii Field < <br /> Boundaries,Blocking,Struts 4- a B._ , W <br /> WALL SHTG See Drawings for other Sheathing Nailing requnements, <br /> WALL SHY6 rs <br /> CONT.THRU CONT.THRU 2. Floor Framing shall be.indicated on plan.Rate,to General Structural Notes for other rect,nam-s- <br /> CORNER 16 GO_ER <br /> ROOF FRAMING PLAN NOTES - 0 0 <br /> z <br /> (2)CS16x'- (2)CS16x3'-0"- 3. Roof Sheathing shall be V,"thick(Parel Spain Rating 24/16).FastefiShethingtoF�mingwi�0.131'0,2Yi'N,iCs,—sfoVow—�. <br /> BEAM TO E-, BEAM TO EA. I I Framing,Edges 6"MI <br /> PLATE L PLATE L I Frarning,Field "I OC <br /> LOW ROOF es.Hl-king,SR-a-±A Uj <br /> So T— �'�08 do TRUSSES At Unframed Panel Edges,provide PSCA Framing Clips centered between each Framing Member.Sea Drawn Lij <br /> -.1 z4, to 24"" Sheathing Nailing dequmernarts -i <br /> _u 0 Uj <br /> d _LOWN001 At area,indicated a,Blocked Dutphagn provide 2x Flat Blocking(per General Structual Not..)at ad Unframed Sheathing P...I <br /> aT <br /> O TRU6SE; <br /> Edges Feel,,Sheathing to Framing and Blocking with 0.131"O x 2y,"..it,as fh.w.; <br /> @ 24"- Fraddi -iM 12 <br /> talll W Framing,E <br /> -— <br /> HHUS5 50110 z Boundaries,rig, <br /> HHUS5.50116 See Drawings for other Sheathing Nailing requlremerns, <br /> GLB PER SO4 PER 504 <br /> 4. Roof Framing shall be as indicated on plan.Refer to General Sudcor.1 Not... <br /> IS 5. Trusses marked Strut shall be designed to accommodate themd1cated loads and connection, LU <br /> ALL FRAMING OR HARDWARE ALL FRAMING OR HARDWARE Z <br /> 1.1 1\�01 6. O—f-,:rg M—b—hall u.2,,4 @ 24"..postard de—--in famiog bsl,,w/2x4@48"cc,staggered,or—nd-tedbythe Uj <br /> NOT SHOWN OR SPECIFIED NOT SHOWN OR SPECIFIED Tmas 110—f-t— <br /> TO REMAIN UNCHANGED O <br /> > <br /> TO REMAIN UNCHANGED LU7, Provide solid Fiat Blocking at all Valleys.Fasten Sheathing to Blockinqw,accordance with Note 3, :51 <br /> LL <br /> 8. Provide HZ5A Clip each side or TLOK6 Screw each pit,at 2-ply or greater Girder Truss ends,typ. 0 <br /> WALL FRAMING PLAN NOTES: 11 <br /> Is-shaffE-el§F-ear Wall type P1-6 with 2x6 Studs@ 16',c,u.o.r. U— <br /> Intel or Walls shall be 2X4 Stud,@ 16"oc,u-n. Z <br /> P1-6 Wis..110ced,She.,Wells..in conduct,nail studs together per 3/SO6.Sea 11S06 for special stud dequ-nneirls a,Shear Wall <br /> types PI-3,P 1-2.and P2.2, z <br /> 11. 14-1—shall be 05,",*,n,Sea Detail 111111, <br /> 1. Built-up <br /> Groups Stud G in Walls supporting Beams.Posts or Girder Trusses above shall be(2)SoLdS. See General Structural <br /> Not.s for fastening requirements. <br /> 12. Sea,OiSG6 for Simpson to USP hard....,mvioamd his U <br /> — <br /> Of <br /> 0 <br /> 3-CAR 6/,,RAGE OPTION ELr- EXTENDED GARAGE OPTION-ELEV.'A' LEGEND <br /> DETAIL CALL0.T <br /> SHEAR WALL BELOW PER SCHEDULE OF IS06 <br /> do <br /> BEARING OR SHEAR WALL BELOW to <br /> E I BEARING OR SHEAR WALL ABOVE IL <br /> (F) FLUSH FRAMED(BOTTOM FLUSH W/BOTTOM OF FRAMING) <br /> QD <br /> POST BELOW <br /> PT.LD. BLOCK THRU FLOOR FOR POST ABOVE Ld--LiIJ <br /> I <br /> HDR HEADER PER PLAN NOTE 10 <br /> 0 1 2 4 8 16 SO4.1 A <br /> 7L77---2------7 <br />