My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6715 HIGHLAND DR 2025-09-30
>
Address Records
>
HIGHLAND DR
>
6715
>
6715 HIGHLAND DR 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 9:13:19 AM
Creation date
9/16/2025 11:08:17 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
6715
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Address Project Name: Novak Deck <br /> 6715 Highland Dr Description: Deck Construction <br /> Everett, WA Project Jurisdiction: Snohomish <br /> Code: IRC 2021/ASCE 7-16 <br /> ESG DESIGN Decking: Composite Decking <br /> roiect: Novak Deck Everett, WA <br /> ---._..r.._........._........._......_-.__.._._.. ... <br /> 11 ...:Design: Main Level Residential Wood Framed Deck <br /> Vertical Loads: Deck DL= 10 PSF ' <br /> Deck LL= 60 PSF (LL Controls) �TT �`+1 <br /> Snow SL= 25 PSF <br /> Allowable Soil Bearing= 1500 PSF (Standard) <br /> Lateral Loads: Seismic loads calculated per ASCE 7-16, Ch 12.14 <br /> Sds = 1.053 Story Factors: <br /> R= 7.0 = Knee Braces F= 1.0 (ground level deck, H<8'-0") <br /> F = 1.0 F = 1.1 (1-story elevated deck, H> 8'-0" and H< 16-0") <br /> F= 1.2 (2-story elevated deck, H> 16-0") <br /> 00= 2.5 (Qo=2.5 For Knee Braces, 1.0 for Moment Base) <br /> E= 0.376 <br /> W= 18.4 psf (DL+ 02LL) <br /> v= 6.9 psf (LRFD lateral) <br /> Soil Bearing for Lateral Columns= 1500 psf Gravity Based Footing Calcuation (unfactored) <br /> (ASCE 7-16 Ch 2.4.5 Basic Combinations <br /> with Seismic Load Effects) <br /> AL House <br /> i I <br /> I l l l l f l l i <br /> f - - -- _ <br /> o -i_ _..__�_..__L . _ -- --- <br /> Overhang edge for single span joists <br /> I <br /> l <br /> o <br /> E i M <br /> i <br /> _ C'7 <br /> Q E i• I <br /> { <br /> Average Distance between posts: 6.5 ft 4 ft <br /> 37.0 ft (Total Length of Deck) <br /> Type of Lateral Bracing: Lateral Bracing Not Required due to deck Ht abv ground <br /> Project: Novak Deck Date: 4/19/2024 <br /> Location: Everett, WA Page Number 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.