Laserfiche WebLink
` <br /> SELF ,DHE�cvf <br /> FLASAN� NAIL FLAIlIG- TEND <br /> 'PER Fl- ROUGH <br /> -N OPENING OPENING <br /> IN,JDEJ�- PENETRATION <br /> '' � '4 NET-F FLASHING <br /> ­p BUILDING PAPER TO EXTEND <br /> OVER (LEE NRA� LEDGER IN TAI-EF MIN.12'BEYOND ALL EDGES STEP I 3TEP 2 <br /> ION A A OF THE PENETRAiiarq ATTACH SILL STRIP OF q'WIDE NOSTOP(OR EQ FLASHING MATERIAL ATTAC JAMB STRIPS OF 9'WIDE MOISTOP(OR EQ.) <br /> EXPOSED ILL 4 5t�-E� OPENING HIT14 T14E TOP EDGE EVEN WITH TOE TOP OF THE ROUGH SILL. FLASH,��41G MATERIAL WITH IN51DE EDGE EVEN WITH THE JAMB <br /> EXTEND THIS STRIP AT LEAST 12"BEYOND THE EDGE OF THE ROUGH OF T,E ROUGH <br /> DECK. LEDGER DETAIL ' r�*�*/*� ��OPENING� ~'�' �~^'~~^ ~~~~^~'~~~EXTEND~ <br /> LC� <br /> ABOVE ER EDGE OF HEADER <br /> T SCALE:N.T.S. SCALE:N.T.S. <br /> CONT.BEAD OF <br /> L HEAD SEALANT <br /> EQ. EQ. FLASHING UNDER NAIL FIN <br /> PAN! CUT AWAY <br /> IF. EXCESS <br /> STRAH BLDG.PAPER FRAME 0 <br /> 0,OPENING <br /> LINE Of IN <br /> NERVE CEAkR TRIM, M <br /> HOSE 6 <br /> 3t-l`TO BOTTOM OF 3�3-LANDING TTP, MOTE: SEAL ALL <br /> .L OF FOIAR AGAINST <br /> EXPOSED FASTENIER-ld <br /> R TO BUILDING PAPER <br /> HND ELECTRK A- SHEATHING PER PLAN <br /> METER ll� INSULATION BLDG PAPER LINENCF--I PER <br /> UNDER SILL <br /> PRONTO nENE PER PLAN- F-�--AFPROVED FLASHING 4NAIL FLANGE UNDER SILL STRIP <br /> INSTALLED R PEARTWOOD CEDAR TRIM (O.Iq x 10'ROLL) STEP 3 <br /> LD <br /> I - -1 Z� -APPLY A 3/8'CONTINUOUS BEAD OF CAULK TO THE BACK OF THE FRAME APPLY THE NEXT COURSE OF BUILDING PAPER(BUTTING TO THE <br /> Hclji� 1 -1 EXT,op lic TIWRE�' AGAINST NERVESTRAL 21A A RTI400D CEDAR SIDING PER PLAN 1-1/2"GAP NAILING FLANGE AT ALL SIDES OF THE WINDOW FRAME OPENING)OVER THE JAMB FLASHING MATERIAL. <br /> Hos' FEI-i I BTNN ROOF AND SIDING PLACE AND SECURE FRAME INTO ROUGH OPEN114G WITH FLANGES OVER T14E APPLY EUGGEEDING LAYERS OF BUILDING PAPER IN SHIN <br /> GLE cc) <br /> 5FARTDk I "aw,.PE, INSTALLED JAMB AND 5ILL 4 JAMB MOI5TOP(OR EQ.)FLASHING MATERIAL BOARD�ASHIOA UP THE WALL,LAPPING CGUR5ES A MINIMUM OF ILA <br /> INSTALL z�B.T," ROOF SHINGLES NAIL WINDOWS PER WINDOW MANUFACTURERS SPECIFICATIONS 1/2 PAPER NIDTH <br /> OF STEPS mr,By UNE OF NERVESTRAL <br /> STARTING FROM THE BASE OF THE HALL,APPLY BUILDING PAPER UNDER <br /> SILL FIONS 7�$3-0#FELT TO EXTEND UP <br /> ROD 12'�RO I LL THE SILL STRIP AND CUT ANY EXCESS BU LONG PAPER T14AT MAY EXTEND < <br /> WALL 12'MIN. <br /> ALL SLAB ON GRAVE M <br /> ORTft,S�ol F-A5,IiNG PRONTO bEJ- ITTE� I 14ALL ABOVE THE SILL AND BETWEEN IHE JA 35 OF THE OPENING > <br /> -�c 5TC. TURN PLAN' :FROOF TRUSS APPLT SLOPED 28 GAI 2- BACK,PREFIN15HED METAL FLASHING TO OPENING. Lu <br /> F--41T,Fl -I PANEL ROOF SHEATHING PEP,PLAN APPLY 6'FORT FLASH OVER TOP 14EAD FLANGE OF WINDOW,EXTEND PAST <br /> JAMB FLASHING 2". <br /> . _ROO '-- <br /> G GLASS DOOR, TYP <br /> ROOF TO NA <br /> STANDARD FLASHING MATERIAL APPLICATI ION AT OPENINGS <br /> \�7 �.ma a�s�� l�y <br /> I 3CE D�TAIL AO FOR DtSFOP INSTALL SILL ASSEMBLY 3/8'BEAD CAULK INSULATION 6'FORTIFLA514 01 FLASHING <br /> E-ECTRIC METER t POSE 8 PER SPEC SEALANT (WHERE LXCUR5) <br /> TRIM PER ELEVATION GYP.ED. WD FRAME NALL -SIDING PER PLAN <br /> LCCi�,3101\1 (NO GAS METER) (WHERE APPLICABLE) INSULATION PER PLAN -13UILDING PAPER <br /> (WHERE OCCURS) <br /> k75 TRIMMER P-10 INSULATION M015TOP(SEE DETAIL 4110 <br /> W10 FOR INSTALL) KING STUD <br /> NO.FRAME WALL ALL HDR'� <br /> MIN.IV =. WALL PER p,"" ~�"��^ COPYRQlT NOTICE;THIS <br /> PLAN FLASHING TURN DOWN RIDGE NOME5 USE OF T46 <br /> SIDES OF WINDOW DETAIL WIO <br /> ---- M015TOP(SEE PLAN 6 DINNED BY PACIFIC <br /> �� <br /> RAM UCENS FEE TO PACIFIC <br /> INSULATION <br /> RAME TRIM PER ELEVATION RIDGE HOME5. <br /> ` =".,° (WHERE OCCURS) ---PAPERN FOR INSTALL) 114'AT EACH END HITWOUT P�Vl�T OF <br /> 5FALANT____ BLDG.~`~ ��n m,��� <br /> HOSE 5113 <br /> LAN <br /> b4�TO ClU| - — "==�" �°"=� / SEALANT``--__--- - -- `l_LJ' PLAN SUMNARY <br /> OF PPONTO-BEND _- ~ �". � _~--____-'' _~� ,"�" =~���_' __~~^ ��uw --' '�-Ll�—WINDOW FRAME <br /> ED <br /> FORTIFL <br /> H ON <br /> 51DE5 OF WINDOW <br /> EDGE FO EDGE <br /> EDGE EDGE SCALE:N.T,5. <br /> LAG SCREW OFF ADJOINING ROOF) POINT LOADS ABOVE VENTS) <br /> GAS -Y ATTACHED METAL FLASHING 51DING PER PLAN--_ 406 <br /> METER STUDS,LAC (MAY BE BOTTOM SILLVENTS VG ALV SCREEN <br /> PENETRATE BUILDING PAPER ON <br /> ' .~~ �� � ___ -~AR~� <br /> EN <br /> STRAP <br /> FORTIFLA5H:...'014TO PAIEL PURPOSE 15 TO 514ED THE PROVIDE LOUVERED VENTS <br /> ON <br /> WATER OFF THE ROOF AND 0 FRCNT ELEVATIONS <br /> L 5!DEj��ORNER5 OF 4WT--4 KEEP IT AWAY FROM THE ROOF SHINGLES EE REV 5iON ,Y- <br /> RIM PER PLAN <br /> �;2 TRIM�-FERINETER VERTICAL WALL BENEATH) PER SPEC. <br /> OPENING FOR ELE�- 30#ROOF FELT P.T MUD SILL SCALE. 7F "-0 <br /> IT OF 14 FASCIA PER PLAN CONCRETE FOUNDATION <br /> TER BOX, FIREPLACE GUTTER <br /> �'D)NOT INSTALL VENT(S)CLOSER THAN 3'TO GAS METERI� <br /> DR-ER VENT, ETC 7/10 OSB ROOF WATER <br /> SHEATHING -NBUILDING PAPER 540JLD BE INSTALLED OVER FLASPNG-� INTRUSION <br /> INOTIE PER ASEC R`IET7 WHEN FOUNDATION VENTS ARE NOT PLACED 50 THAT THE TOP I <br /> 'ELECTRIC I$ GAS METER, k�� USE 3 STRAPS ON 75 GALLON AND GREATER SIZES �EXPOSED FASTENERSI DIVERT AIR FLON BELOW THE WNERSURFACE OF T,�E FLOOR INSULATION. <br /> OF THE VENT 15 BELOW THIE LONER SURFACE OF THE FLOOR INSULATION,A PERMANENTLY <br /> ````` [ATTZHED BAFFLE SHA�L BE]N5TA�LED AT AN ANGLE OF 30'FROM HORIZONTAL,To <br /> B8 CLEARANCES It LocA.TICl,,,z HATER HEATER (HAT) STRAPS DETAIL @ ROOF/HALL INTERSECTION FOUNDATION VENT <br /> ICALE.N T.S. SCALE:N.T.S. SCALE;N.T.S. <br /> -- -- <br />