My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6003 23RD DR W 2025 Plans 2025-09-16
>
Address Records
>
23RD DR W
>
6003
>
Plans
>
6003 23RD DR W 2025 Plans 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 3:38:17 PM
Creation date
9/16/2025 3:38:08 PM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
6003
Permit
B2503-049
Year
2025
Notes
TI: install partitions walls/ doors, no footprint change
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> 1. Approved plans must be on job site at all times and available for inspectors. PLANNING: A,PRo ED Site Address: <br /> w <br /> PLANNING DEPARTMENT <br /> Dennis Osborn 6003 23 R D D R W <br /> 2. See face of permit for permit conditions of approval and additional requirements. 5-1-25 <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at Owner: <br /> onlinepermits.everettwa.govto formally request all required inspections. TOC MANAGEMENT <br /> 4. This permit must be finaled in order to close out this permit, legitimize work and grant a Certificate of Occupancy. SERVICES <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER Tenant: <br /> 811. BUILDING: BOEING AIC <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of <br /> Everett. <br /> Cityof Everett Permit Services Additional Permits Are Required App. Date: <br /> VEPET ET <br /> For This Project To Include: <br /> 7. Protect all existing underground utilities during construction. REVIEWED FOR CODE COMPLIANCE MAYBE REQUIRED ASEE DDEDPLANS FOR ANNOTATIONS 3 19 2025 <br /> By Review Discipline:Building ❑Plumbing CEO]FIreALlarm <br /> TO ADJUST; ADDED REGARDING CODE <br /> Reviewer:SSchreffler ❑Mechanical SUBJECT TO FIELD REQUIREMENTS. SUBJECT TO <br /> 8. An damage to City improvements(sidewalk,curb, roadway,etc. shall be replaced per City Standards and/or as R view <br /> Electrical INSPECTION FIELD INSPECTION. <br /> Y g Y p / Y � p p Y Review Status:Approved for Permit ❑ Permit Type <br /> directed by the City PW Inspector. <br /> COMMERCIAL BUILDING <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious FIRE: Subtype: <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties, including the COMMERCIAL <br /> City's right-of-way and/or easements and the improvements located therein. ` ALTERATION (T.I., <br /> EVERETT rvERETT <br /> Everett Fire Dept.Permit Review INTERIOR DEMO, <br /> Status:Approved <br /> Reviewed By: <br /> 04/09/2025 353:05n ADDITION, ETC) <br /> PM <br /> Description: <br /> TI: install partitions <br /> walls/ doors, no <br /> PUBLIC WORKS: NOT REQUIRED footprint change <br /> PERMIT NUMBER: <br /> B2503-049 <br />
The URL can be used to link to this page
Your browser does not support the video tag.