My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
702 34TH ST 2025 Plans 2025-09-16
>
Address Records
>
34TH ST
>
702
>
Plans
>
702 34TH ST 2025 Plans 2025-09-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 4:03:50 PM
Creation date
9/16/2025 4:03:44 PM
Metadata
Fields
Template:
Address Document
Street Name
34TH ST
Street Number
702
Permit
TANK2504-001
Year
2025
Notes
Fill in place (2) 500-gallon underground tanks
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> 1. Approved plans must be on job site at all times and available for inspectors. FIRE: Site Address: <br /> 2. See face of permit for permit conditions of approval and additional requirements. 702 34TH ST <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at EVERETT <br /> Everett Fire Dept.Permit Review Owner: <br /> onlinepermits.everettwa.govto formally request all required inspections. Status:Approved SENTER LINDA J <br /> Reviewed By:kbrown <br /> 04/07/2025 10:58:51 <br /> 4. This permit must be finaled in order to close out this permit, legitimize work and grant a Certificate of Occupancy. AM <br /> App. Date: <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 4/3/2025 <br /> 811. <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of Permit Type: <br /> Everett. <br /> TANK <br /> 7. Protect all existing underground utilities during construction. <br /> Subtype: <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as DECOMMISSIONING <br /> directed by the City PW Inspector. <br /> RESIDENTIAL HEATING <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. OIL TANK <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties, including the Description: <br /> City's right-of-way and/or easements and the improvements located therein. FIII in place (2) <br /> 500-gallon underground <br /> tanks <br /> PERMIT NUMBER: <br /> TAN K2504-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.