Laserfiche WebLink
BTL 19011 Wood-Sno Road NE,Suite 100 <br /> Woodinville,WA 98072-4436 <br /> Phone:(425)814-8448 <br /> ENGINEERING Fax:(425)821-2120 <br /> PROJECT RECORD <br /> Date: January 26,2024 <br /> To: Fitch Design Company <br /> Attn: Selena Fitch <br /> From: Tyler Wandschneider,PE <br /> Project: Linton Remodel Pages: 1 + Attachments <br /> 2508 Grand Ave—Everett,WA <br /> Dear Selena, <br /> BTL Engineering performed a site visit on January 16t', 2024, to review the existing crawl space <br /> framing for the Linton Remodel project at the above address.The contractor had exposed the <br /> basement crawlspace and ceiling framing prior to our arrival, so all existing conditions were easily <br /> visible.As a result,we noted several sill plates, floor joists,and floor beams in various stages of <br /> decay and areas where the existing floor system was too close to grade per current 2018 IRC <br /> requirements. Some framing around the stairs needs to be adequately supported to create a <br /> continuous load path from the floor system to the foundation. As discussed,we've provided the <br /> following Structural Sketch Sheets to supplement our permitted construction documents. Please <br /> distribute these sketches as needed to the team and any inspector that may require them. <br /> Note:These sketches are provided under the assumption a vapor barrier will be provided over the <br /> existing soil in the crawlspace,and adequate crawlspace ventilation will be provided to meet current <br /> IRC/IEBC requirements.The exact details and ventilation calculations are outside the scope of BTL <br /> Engineering's construction documents. <br /> Give me a call if you have any questions or comments. <br /> Sincerely, <br /> Tyler Wandschneider,P.E. <br /> BTL Engineering �oF wa <br /> ti <br /> x <br /> 260 C j <br /> ����1VA1.L•�G <br /> Attachments: SSK-01, SSK-02, SSK-03 <br />