Laserfiche WebLink
Category 2:Sensitive information. <br /> Installer's Name: Boden Solutions <br /> Franchisee Location: Mount Vernon,Wa <br /> Installation Equipment: GoliathTech Calibrated Hydraulic Drill with PSI Gauge Torque Indicator Pengo R56X <br /> Installation Date: 3/5/2024 Name of Customer or Contractor: Ultra Renovations LLC <br /> Description of customer project: Deck footings Project Address: 2001 Rockefeller Ave.Everett,Wa 98201 <br /> Required Inclination of Pile Achieved Achieved <br /> Compression Required Total Pile Depth Cut-off Elevation (if not 90 Degrees Compression Tension <br /> Pile Number Capacity Torque Pile Used Helix Used (if not 7') (if not 8"+-2) +-2) PSI Torque Achieved Capacity Capacity <br /> Pile 1: 2 7/8" 10" 5 ft 1000 2700 12 kips <br /> Pile 2: 2 7/8" 10" 5 ft 1000 2700 12 kips <br /> Pile 3: 2 7/8" 10" 5 ft 900 2430 11 kips <br /> Pile 4: <br /> Pile 5: <br /> Pile 6: <br /> Pile 7: <br /> Pile 8: <br /> Pile 9: <br /> Pile 10: <br /> Pile 11: <br /> Pile 12: <br /> Pile 13: <br /> Pile 14: <br /> 2019-04-25 <br /> Installation Checklist R2 Category 2:For official use only/disclosure permissible by law. 1 of 2 <br />