Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 7/27/2022 7/27/2022 ELEC06-ROUGH IN STEVE BANKS CORRECTION <br /> REQUIRED <br /> Notes: <br /> PER TONY LEE <br /> (7/27/2022 11:04 AM SKB) <br /> Expose all unapproved work(including electrical,mechanical,plumbing,and framing systems etc.)installed/altered without permits and inspection <br /> approval in all areas. <br /> Unit A,Provide receptacle on all new counter surfaces 12 inches or longer on a second small appliance circuit.Provide AFC and or GFCI protection for <br /> all new NM cables and newly replace receptacles to include the dishwasher. Properly ground all replaced switches and receptacles. Provide smoke <br /> detectors as required. Individual wires feeding the range are required to be installed in a raceway. Replace the receptacle in the bathroom. <br /> Unit C-2 receptacles required in the main room.Seems like electrical alterations have been made to the bathroom,see note above to expose <br /> unapproved work. <br /> Unit B same as Unit A <br /> (7/27/2022 4:30 PM SKB) <br /> A building permit is required to address the following issues: <br /> Unit C has a hallway/bathroom that leads to the toilet and shower area from the living area.That hallway/bathroom has a headroom of approximately <br /> 6'1".The minimum headroom is required to be 7'per International Property Maintenance Code Section 404.3.Additionally,since this space was <br /> recently modified,the hallway/bathroom is required to be separated from the adjacent mechanical space by minimum one-hour construction per IBC <br /> Section 420. <br /> 10/26/2022 10/26/2022 ELEC 09-OTHER I STEVE BANKS I NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 10/23/2022 7:20 AM Tony Diwan <br /> this inspection for unit A,4,and 1, only. secure building please give us a specific time. 253-200-9300. Company electrician wants to be there,so <br /> please let us know a day before for appointment time. <br /> Contact Name:Tony Diwan <br /> Site Address:2331 ROCKEFELLER AVE <br /> Phone:2532009300 <br /> e-Mail:SUNNYDIWAN@GMAIL.COM <br /> Consulted electrical contractor about work that needs to be exposed and completed.Continue exposing work as previous inspection reports. <br /> I <br /> Printed:Thursday, 18 September,2025 2 of 8 rk <br /> SUPERION <br />