Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> *NO INSPECTION RESCHEDULE <br /> 10/24/2022 10/24/2022 CURRENTLY Permit Technician ONLINE eTRAKiT Inspection Request <br /> SELECTED* <br /> Notes: <br /> 10/23/2022 7:23 AM Tony Diwan <br /> This inspection for unit a,04,and 01. Only. secure building please give us a specific tome. 253-200-9300 1 day before would be best <br /> Contact Name:Tony Diwan <br /> Site Address:2331 ROCKEFELLER AVE <br /> Phone:2532009300 <br /> e-Mail:SUNNYDIWAN@GMAIL.COM <br /> 10/26/2022 10/26/2022 PLUMB 03-ROUGH JASON NOT READY see notes <br /> IN MORRISSEY <br /> Notes: <br /> This inspection for unit a,04,and 01.Only.secure building please give us a specific tome. 253-200-9300 1 day before would be best <br /> Contact Name:Tony Diwan <br /> Site Address:2331 ROCKEFELLER AVE <br /> Phone:2532009300 <br /> e-Mail:SUNNYDIWAN@GMAIL.COM <br /> -Unit 1 replace tub waste and overflow with glue fit or provide permanent access panel in ceiling for future access.This correction applies to all units <br /> with concealed(behind drywall)slip joint connections.-Pull out DW so transition fittings from copper to pex can be inspected.**** Expose all <br /> unapproved work(including electrical,mechanical,plumbing,and framing systems etc.)installed/altered without permits and inspection approval. <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 8/24/2023 E <br /> 4/2023 (REASON GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> From:Suneet Diwan<sunnydiwan@gmail.com> <br /> Sent:Thursday,August 24,2023 9:49 AM <br /> To: Engineering/Public Services(PW)<evteps@everettwa.gov> <br /> Cc:Steve Banks<SBanks@everettwa.gov>; Kelsey Albertson<KAIbertson@everettwa.gov>;Goran Katanic<alpineelectricg@gmail.com> <br /> Subject:[EXTERNAL] Permit Extension <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the <br /> content is safe. <br /> Hello city of everett <br /> Can we have extension on these permits: <br /> E2205-202 <br /> P2206-024 <br /> E2206-100 <br /> P2205-038 <br /> E2211-239 <br /> E2302-204 <br /> We have had some issues of inspections not showing up and we requested times due to access,can we meet maybe next week to make a plan? <br /> Regards, <br /> Suneet Diwan <br /> I <br /> Printed:Thursday, 18 September,2025 2 of 6 rk <br /> SUPERION <br />