My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 ROCKEFELLER AVE 2025-09-30
>
Address Records
>
ROCKEFELLER AVE
>
3326
>
3326 ROCKEFELLER AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 11:05:54 AM
Creation date
9/18/2025 11:41:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3326
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number' E2309-019 Description:Wire DADU and heat pump install <br /> Applied:9/6/2023 Approved:9/7/2023 Site Address: 3326 ROCKEFELLER AVE <br /> Issued:9/8/2023 Finaled: 10/18/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant:JHB(ELEC)LTD <br /> Parent Permit: B2207-041 Owner:3326 ROCKEFELLER AVE LLC <br /> Parent Project: Contractor:JHB(ELEC)LTD <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> ELEC 10-FINAL** ELEC INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 10/13/2023 2:14 PM JHB(ELEC)LTD <br /> Contact Name:JHB(ELEC)LTD <br /> Site Address:3326 ROCKEFELLER AVE <br /> Phone:4253596290 <br /> e-Mail:info@jhbconstruction.com <br /> 9/20/2023 9/20/2023 ELEC 05-SERVICE MICHAEL CORRECTION eTRAKiT Inspection Request <br /> WICKLANDER REQUIRED <br /> Notes: <br /> 9/15/2023 12:58 PM JHB(ELEC)LTD <br /> Contact Name:JHB(ELEC)LTD <br /> Site Address:3326 ROCKEFELLER AVE <br /> Phone:4253596290 <br /> e-Mail:info@jhbconstruction.com <br /> Inspector MCB changed the inspection assignment from MCB to MHW <br /> Primary grounding electrode is to be the Euford ground,not driven ground rods.Inter Communication terminal not installed.arch shields not installed <br /> at the main panel <br /> 9/20/2023 9/20/2023 ELEC 06-ROUGH IN MICHAEL NOT READY <br /> WICKLANDER <br /> Notes: <br /> Heat pump-not installed yet <br /> I <br /> Printed:Thursday, 19 October, 2023 1 of 3 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.