My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3326 ROCKEFELLER AVE 2025-09-30
>
Address Records
>
ROCKEFELLER AVE
>
3326
>
3326 ROCKEFELLER AVE 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 11:05:54 AM
Creation date
9/18/2025 11:41:54 AM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3326
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: U2209-032 Description:ALTERATION TO SEWER/WATER SVC LINE 3/4" <br /> Applied:9/27/2022 Approved: 10/20/2022 Site Address: 3326 ROCKEFELLER AVE <br /> Issued: 10/20/2022 Finaled: 12/4/2023 City,State Zip Code: EVERETT,WA 98201 <br /> Status: FINALED Applicant: ISMAIL MOHAMMAD <br /> Parent Permit: B2207-041 Owner:3326 ROCKEFELLER AVE LLC <br /> Parent Project: REVI22-065 Contractor: INNOVATIVE TOUCH LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PERMIT EXTENSION EXTENSION <br /> 8/2/2023 8/2/2023 (REASON AUDREY ARBOW APPROVED <br /> REQUIRED) <br /> Notes: <br /> 9/1/2023 9/1/2023 07:30 UTIL 10-WATER Andy Erickson PARTIAL <br /> AM SERVICE PIPE APPROVAL <br /> Notes: <br /> Further inspection required upon connection of new water line to existing service. Ok to cover line,keep connection areas open. <br /> 10/13/2023 10/13/2023 1:3 UTIL 14-FINAL Andy Erickson PARTIAL OVAL eTRAKiT Inspection Request PM <br /> Notes: <br /> 10/12/2023 8:36 AM Ismail Mohammad <br /> Contact Name:Ismail Mohammad <br /> Site Address:3326 ROCKEFELLER AVE <br /> Phone:4252440007 <br /> e-Mail:ISMAIL.SEATTLE@GMAIL.COM <br /> Water line installation complete and free to backfill. Still waiting on side sewer installation inspection. <br /> UTIL 04-SIDE <br /> 11/30/2023 11/30/2023 1AM FINAL <br /> SEWER Andy Erickson APPR <br /> AM CONNECTION FINAL <br /> Notes: <br /> Sewer scope observed and meets city standards. <br /> I <br /> Printed: Monday,04 December, 2023 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.