Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PLUMB 03-ROUGH I MECHPLUMB <br /> IN INSPECTOR eTRAKiT Inspection Request <br /> Notes: <br /> 9/8/2023 6:28 AM Ismail Mohammad <br /> Contact Name:Ismail Mohammad <br /> Site Address:3326 ROCKEFELLER AVE SE UNIT B <br /> Phone:4252440007 <br /> e-Mail:ISMAIL.SEATTLE@GMAIL.COM <br /> PLUMB 02- <br /> 8/30/2023 8/30/2023 GROUND JEFF M RHODE APPROVAL see notes <br /> WORK/SLAB <br /> Notes: <br /> 8/28/2023 6:20 AM Ismail Mohammad <br /> Contact Name:Ismail Mohammad <br /> Site Address:3326 ROCKEFELLER AVE SE UNIT B <br /> Phone:4252440007 <br /> e-Mail:ISMAIL.SEATTLE@GMAIL.COM <br /> -changed to groundwork per phone call from contractor in morning <br /> ****obtain electrical permit****-water service and exterior waste piping connection still requiring inspection-wrap waste stub ups prior to concrete <br /> pour(will verify via rough in inspection)-one lav,one toilet,one tub/shower,one washer box,one kitchen sink ground work ok-plans located in stud bay <br /> by electrical box <br /> 9/14/2023 9/14/2023 PLUMB ON-ROUGH JEFF M RHODE APPROVAL eTRAKiT Inspection Request <br /> Notes: <br /> 9/10/2023 5:48 PM Ismail Mohammad <br /> Contact Name:Ismail Mohammad <br /> Site Address:3326 ROCKEFELLER AVE SE UNIT B <br /> Phone:4252440007 <br /> e-Mail:ISMAIL.SEATTLE@GMAIL.COM <br /> 10/13/2023 10/13/2023 PLUMB 08-FINAL** JEFF M RHODE NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 10/11/2023 9:36 AM Ismail Mohammad <br /> Contact Name:Ismail Mohammad <br /> Site Address:3326 ROCKEFELLER AVE SE UNIT B <br /> Phone:4252440007 <br /> e-Mail:ISMAIL.SEATTLE@GMAIL.COM <br /> I <br /> Printed:Wednesday, 18 October,2023 2 of 3 rk <br /> SUPERION <br />