Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: An Ordinance creating a special improvement project entitled “Riverpoint Outfalls <br />Replacement” Fund 336, Program 049. <br />Council Bill # interoffice use <br />CB 2508-46 <br />Project: Riverpoint Outfalls Replacement <br />Partner/Supplier: <br /> Location: North and South Outfall at Riverpoint (EPIC) <br />Preceding action: None <br />Fund: 336 - Water & Sewer System Improvements Fund <br />Agenda dates requested: <br /> <br />1st Reading 9/03/25 <br />2nd Reading 9/10/25 <br />Consent <br />Action 9/17/25 <br />Ordinance x <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Proposed Ordinance <br /> <br />Department(s) involved: <br />Public Works, Admin <br /> <br />Contact person: <br />Grant Moen <br /> <br />Phone number: <br />425-257-8947 <br /> <br />Email: <br />gmoen@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />This funding ordinance establishes funding and accounting for the Riverpoint Outfalls project. <br />The programmed available funding for design and construction of this project is $2,000,000. The <br />funding source for this project will be Fund 401 – Water & Sewer Utility. <br /> <br />Project summary statement: <br />This project will improve drainage of the Riverpoint (EPIC) area by replacing two undersized <br />stormwater outfalls (North and South Outfall) to the Snohomish River. This replacement will <br />reduce backflow during wet conditions, help mitigate localized flooding along Railway Avenue <br />and accommodate future development. Additionally, a water quality treatment facility using a <br />Modular Wetlands Linear stormwater treatment system will be installed at the South Outfall to <br />improve water quality by treating the approximately 43.8-acre contributing basin. <br />Anticipated future development of this area includes the construction of a bridge over the <br />railroad tracks at Everett Avenue connecting to Railway Avenue, and construction of the new <br />Public Works Service Center. This project will establish a foundation for improving water quality <br />before full-scale development begins and ensure adequate drainage system capacity. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Riverpoint Outfalls <br />Replacement” Fund 336, Program 049. <br /> <br />City Council Agenda Item Cover Sheet