My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY EVCC 2025-10-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC
>
1001 N BROADWAY EVCC 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:09:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
......................... .... <br /> Table 4.2.2 <br /> Storm Drain Inlet Protection <br /> Applicable for <br /> Type of Inlet Emergency Paved/Earthen <br /> Protection Overflow Surfaces Conditions of Use <br /> Drop Inlet Protection <br /> Excavated drop inlet Yes, Earthen Applicable for heavy flows_ Easy <br /> protection temporary to maintain.Large area <br /> flooding will Requirement: 30'X 30'lacre <br /> occur <br /> Block and gravel drop Yes Paved or Earthen Applicable for heavy concentrated <br /> inlet protection flows.Will not pond. <br /> Gravel and wire drop No Applicable for heavy concentrated <br /> inlet protection flows.Will pond. Can withstand <br /> traffic. <br /> Catch basin filters Yes Paved or Earthen Frequent maintenance pp Cured. <br /> Curb Inlet Protection <br /> Curb inlet protection Small capRcity,. .. Paved:,..;.:.:...:. Used for sturdy,more compact::, <br /> with a wooden weir overflow installation. <br /> Block and gravel curb Yes Paved Sturdy,but limited filtration. <br /> inlet protection: <br /> Culvert Inlet Protection <br /> Culvert inlet sediment 18 month expected life. <br /> tra <br /> Design and Excavated Drop Inlet Proleclion - An excavated impoundment around the <br /> Installation storm drain. Sediment settles out of the storniwater prior to entering the <br /> Specifications storm drain. <br /> • Provide a depth of 1-2 ft as measured from the crest of the inlet <br /> structure. <br /> • Slope sides of excavation no steeper than 2H:IV. <br /> • Minimum volume of excavation 35 cubic yards. <br /> • Shape basin to fit site with longest dimension oriented toward the <br /> longest inflow area. <br /> • Install provisions for draining to prevent standing water problems. <br /> • Clear the area of all debris. <br /> • Grade the approach to the inlet uniformly. <br /> + Drill weep holes into the side of the inlet. <br /> • Protect weep holes with screen wire and washed aggregate. <br /> • Seal weep holes when removing structure and stabilizing area. <br /> Vohane H—Construction Stot m►vater Pollulion Prevention-August 2012 <br /> 4-80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.