My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY EVCC 2025-10-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC
>
1001 N BROADWAY EVCC 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:09:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j <br /> 1. The base of both end posts must be at least 2-to 4-inches above the <br /> top of the filter fabric on the middle posts for ditch checks to drain <br /> properly. Use a hand level or string level, if necessary, to mark <br /> base points before installation. <br /> i z 2. Install posts 3-to 4-feet apart in critical retention areas and 6-to 7- <br /> feet apart in standard applications. <br /> 3. Install posts 24-inches deep on the downstream side of the silt <br /> I +; <br /> fence, and as close as possible to the filter fabric,enabling posts to <br /> I support the filter fabric from upstream water pressure. <br /> i <br /> 4. Install posts with the nipples facing away from the filter fabric. <br /> 5. Attach the filter fabric to each post with three ties,all spaced <br /> within the top 8-inches of the filter fabric. Attach each tie <br /> diagonally 45 degrees through the filter fabric,with each puncture <br /> at least 1-inch vertically apart. Each tie should be positioned to <br /> hang on a post nipple when tightening to prevent sagging. <br /> 6. Wrap approximately 6-inches of fabric around the end posts and <br /> secure with 3 ties. <br /> E <br /> I 7. No more than 24-inches of 36-inch filter fabric is allowed above <br /> ground level. <br /> Compact the soil immediately next to the filter fabric with the front <br /> wheel of the tractor, skid steer, or roller exerting at least 60 pounds <br /> per square inch, Compact the upstream side first and then each side <br /> twice for a total of four trips. Check and correct the silt fence <br /> installation for any deviation before compaction. Use a flat-bladed <br /> i <br /> shovel to tuck fabric deeper into the ground if necessary. <br /> I <br /> i <br /> E <br /> r <br /> i <br /> E <br /> I <br /> j E I <br /> i <br /> z: <br />; <br />; <br /> I <br /> i I <br /> I _ <br /> i <br /> I <br /> i <br /> iis <br /> I <br /> I <br /> I <br /> i <br /> Volume H—C'oirstrrietiou,5toi►iiivrrler-Pollution Prevention-August 2012 <br /> t <br /> 4-92 <br /> it <br />
The URL can be used to link to this page
Your browser does not support the video tag.