Laserfiche WebLink
• Inspect the slope after significant storms and repair any areas where <br /> wattles are not tightly abutted or water has scoured beneath the <br /> wattles. <br /> Approved as Ecology has approved products as able to meet the requirements of BMP <br /> Equivalent C235. The products did not pass through the Technology Assessment <br /> Protocol—Ecology(TAPE)process. Local jurisdictions may choose not <br /> to accept this product approved as equivalent, or may require additional <br /> testing prior to consideration for local use. The products are available for <br /> review on Ecology's website at <br /> http:HivNvw.ecy.wa.gov/programs/wg/store-twater/newtech/egti ivalent.litn..l <br /> BMP C236: Vegetative Filtration <br /> Purpose Vegetative Filtration may be used in conjunction with BMP C241 <br /> Temporary Sediment Ponds,BMP C206 Level Spreader and a pumping <br /> system with surface intake to improve turbidity levels of stormwater <br /> discharges by filtering through existing vegetation where undisturbed <br /> forest floor duff layer or established lawn with thatch layer are present. <br /> Vegetative Filtration can also be used to infiltrate dewatering waste from <br /> foundations,vaults, and trenches as long as runoff does not occur. <br /> Conditions of Use • For every five acre of disturbed soil use one acre of grass field, farm <br /> pasture, or wooded area. Reduce or increase this area depending on <br /> project size, ground water table height, and other site conditions. <br /> • Wetlands shall not be used for filtration. <br /> Do not use this BMP in areas with a high ground water table, or in <br /> areas that will have a high seasonal ground water table during the use <br /> of this BMP. <br /> • This BMP may be less effective on soils that prevent the infiltration of <br /> the water, such as hard till. <br /> • Using other effective source control measures throughout a <br /> construction site will prevent the generation of additional highly turbid <br /> water and may reduce the time period or area need for this BMP. <br /> • Stop distributing water into the vegetated area if standing water or <br /> erosion results. <br /> Desigsr Criteria . Find land adjacent to the project that has a vegetated field, preferably a <br /> farm field, or wooded area. <br /> If the project site does not contain enough vegetated field area <br /> consider obtaining permission from adjacent landowners(especially <br /> for farm fields). <br /> • Install a pump and downstream distribution manifold depending on the <br /> project size. Generally, the main distribution line should reach 100 to <br /> 200-feet long(many large projects, or projects on tight soil,will <br /> Volume 11—Consb•uction Storimmiter Polhifion Prevenflon -August 2012 <br /> 4-98 <br />