Laserfiche WebLink
t 4 <br /> 1 i <br /> i <br /> SUMMARY OF PERMIT REPORT SUBMITTALS <br /> Refer to the Special and General Conditions within this permit for additional submittal requirements. <br /> Appendix A provides a list of definitions. Appendix B provides a list of acronyms. <br /> Table 1 Summary of Required Submittals <br /> Permit Submittal Frequency First Submittal Date <br /> Section <br /> S5.A and High Turbidity/Transparency Phone As Necessary Within 24 hours <br /> r S8 Reporting <br />� t <br /> ° S5.B Discharge Monitoring Report Monthly* Within 15 days following the <br /> f end of each month <br /> S5.F and Noncompliance Notification - As necessary Within 24 hours <br /> S8 Telephone Notification <br /> S5.F Noncompliance Notification - Written As necessary Within 5 Days of <br /> Report non compliance <br /> 4 <br /> S9.D Request for Chemical Treatment Form As necessary Written approval from <br /> j Ecology is required prior to <br /> { using chemical treatment <br /> (with the exception of dry ice, <br /> CO2 or food grade vinegar to <br /> E adjust pH) <br /> a G2 Notice of Change in Authorization As necessary <br /> i <br /> is G6 Permit Application for Substantive As necessary <br /> i <br /> Changes to the Discharge <br /> EG8 Application for Permit Renewal 1/permit cycle No later than 180 days <br /> before expiration <br /> l <br /> S2.A Notice of Permit Transfer As necessary <br /> G19 Notice of Planned Changes As necessary <br /> I = ` <br /> E <br /> I G21 Reporting Anticipated Non-compliance As necessary <br /> p <br /> l <br /> NOTE: *Permittees must submit electronic Discharge Monitoring Reports(DMRs)to the Washington State <br />€ I Department of Ecology monthly, regardless of site discharge,for the full duration of permit coverage. Refer <br /> ' to Section S5.B of this General Permit for more specific information regarding DMRs. <br /> t _ <br /> i <br /> S <br /> y I <br /> 1 <br />`r f <br /> f i F <br /> k <br /> t <br /> l <br /> I <br /> i <br /> E <br /> x Construction Stormwater General Permit Page 1 <br />