My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY EVCC 2025-10-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC
>
1001 N BROADWAY EVCC 2025-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 11:09:21 AM
Creation date
9/23/2025 9:58:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Sampling and Analysis Methods <br /> a. The Permittee performs turbidity analysis with a calibrated turbidity meter <br /> (turbidimeter) either on site or at an accredited lab.The Permittee must record the <br /> results in the site log book in nephelometric turbidity units (NTUs). <br /> b. The Permittee performs transparency analysis on site with a 1% inch diameter, 60 <br /> centimeter(cm)-long transparency tube. The Permittee will record the results in the <br /> site log book in centimeters(cm). <br /> Table 4 Monitoring and Reporting Requirements <br /> Parameter ` Unit Analytical Method Sampling Benchmark, <br /> Frequency Value <br /> Turbidity NTU SM21.30 Weekly, if 25 NTUs <br /> discharging <br /> Manufacturer Weekly, if <br /> Transparency Cm instructions,or discharging 33 cm <br /> Ecology guidance <br /> 5. Turbidity/Transparency Benchmark Values and Reporting Triggers <br /> The benchmark value for turbidity is 25 NTUs.The benchmark value for transparency is <br /> 33 centimeters(cm). Note: Benchmark values do not apply to discharges to segments of <br /> water bodies on Washington State's 303(d) list (Category 5)for turbidity, fine sediment, <br /> or phosphorus;these discharges are subject to a numeric effluent limit for turbidity. <br /> Refer to Special Condition S8 for more information and follow S5.F—Noncompliance <br /> Notification for reporting requirements applicable to discharges which exceed the <br /> numeric effluent limit for turbidity. <br /> a. Turbidity 26—249 NTUs, or Transparency 32—7 cm: <br /> If the discharge turbidity is 26 to 249 NTUs; or if discharge transparency is 32 to 7 <br /> cm,the Permittee must: <br /> i. Immediately begin the process to fully implement and maintain appropriate <br /> source control and/or treatment BMPs, and no later than 10 days of the date <br /> the discharge exceeded the benchmark. if installation of necessary treatment <br /> BMPs is not feasible within 10 days, Ecology may approve additional time when <br /> the Permittee requests an extension within the initial 10-day response period. <br /> ii. Review the SWPPP for compliance with Special Condition S9 and make <br /> appropriate revisions within 7 days of the date the discharge exceeded the <br /> benchmark. <br /> iii. Document BMP implementation and maintenance in the site log book. <br /> b. Turbidity 250 NTUs or greater, or Transparency 6 cm or less: <br /> If a discharge point's turbidity is 250 NTUs or greater, or if discharge transparency is <br /> less than or equal to 6 cm,the Permittee must complete the reporting and adaptive <br /> Construction Stormwater General Permit Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.