Laserfiche WebLink
i l <br /> l <br /> PROJECT OVERVIEW <br /> II This stormwater site plan report summarizes the storm drainage analysis and design for the <br /> Everett Community College (EvCC) Learning Resource Center (LRC) building. <br /> The project will construct a new LRC building at the EvCC east campus,just south of the <br /> recently constructed WSU Extension building. The new building site is currently occupied by an <br /> I existing paved parking lot that serves an existing retail building. The existing retail building and <br /> adjacent parking area will be demolished to accommodate the redevelopment project. Site <br /> improvements will include paved parking, fire department access, pedestrian walkways, sanitary <br /> Isewer and storm drainage systems, rerouting the existing water main, and domestic and fire <br /> protection systems for the proposed building. <br /> 1 4 F7 IN S 1 • <br /> State -i <br /> i . <br /> Cedar <br /> IIStarbucks <br /> MVW Or Takeout-Delivery <br /> I I V all• <br /> Un in <br /> n. <br /> Messenger • <br /> Truth Church <br /> Family Mexican T�llh St <br /> I <br /> it <br /> . Meadows I <br /> LI <br /> •' Project Location <br /> Il U <br /> li <br /> IFigure 1. Vicinity Map. <br /> i Stormwater Site Plan <br /> l Learning Resource Center <br />