Laserfiche WebLink
system and a portion of the parking lot bioretention cells will combine and connect to the <br /> existing storm pipe system that extends north to the WSU Extension building development. <br /> Additional yard drains will be placed in the open landscape and pedestrian plaza areas to collect <br /> stormwater and discharge to the new storm conveyance system. <br /> Stonnwater Site Plan 4 C• , , <br /> Learning Resource Center <br />