Laserfiche WebLink
EROSION AND SEDIMENTATION CONTROL <br /> Stormwater Pollution Prevention Plan elements are described below. <br /> Element #1: Preserve Vegetation/Mark Clearing Limits <br /> The project site is mostly impervious surfacing. Temporary fencing will be used to delineate the <br /> limits of construction. <br /> Element #2: Establish Construction Access <br /> The existing paved parking and drive aisles will be used. Once the existing pavement is <br /> removed, a stabilized construction entrance will be installed. A wheel wash or vacuum sweepers <br /> shall be used to prevent tracking of sediment onto the adjacent public roadways. <br /> Element #3: Control Flow Rates <br /> Construction stormwater will be collected in temporary storage tanks that will meter out <br /> stormwater to the existing conveyance system. <br /> Element #4: Install Sediment Controls <br /> Storage tanks as part of a treatment train system will be provided to capture constt ction runoff. <br /> Wattles will be installed to prevent runoff from exiting the project site area. <br /> Element#S: Stabilize Soils <br /> The existing slopes along the southern and eastern property lines will be permanently replanted <br /> with trees and plantings. <br /> Element#b: Protect Slopes <br /> Temporary seeding and mulch will be used on disturbed slopes. <br /> Element#7: Protect Drain Innlets <br /> Catch basin filter inserts will be installed in existing catch basin structures within and <br /> downstream of the site. <br /> Element #8: Stabilize Channels and Outlets <br /> Not applicable. There are no existing or proposed channels or outlets at the project site. <br /> Element #9: Control Pollutants <br /> Use dust control measures to reduce wind transport of dust during demolition operations. <br /> Maintain good housekeeping and preventative measures for vehicle and construction equipment <br /> storage. <br /> Elennent #10: Control Dewatering <br /> Dewatering is not necessary for the scope of the project. <br /> Stormwater Site Plan 8 <br /> Learning Resource Center <br />